Model essay on project experience in engineer's resume (1)
* * company
Commencement date: 2010-04 ~ 2011-07.
Nature of company: private enterprise
Industry: instrumentation/industrial automation
Position: Engineer
Job description: 1, fully responsible for the company's technical work, mainly responsible for a series of technical work from drawings to finished products, such as fixture, mechanical design, metal-plastic mold opening;
2. Responsible for the daily management of the production department, including personnel deployment, work distribution and other daily work assigned by the general manager.
Reason for leaving: the factory closed.
* * company
Commencement date: August 20, 200910-04.
Nature of the company: Sino-foreign joint venture
Industry: Furniture/Home Appliances/Crafts/Toys/Jewelry
Position: Assistant
Job description: 1. According to the products developed by the technical department, design and manufacture the corresponding fixture;
2. When the product structure changes, modify the corresponding fixture;
3. Maintenance of machine tools and fixtures;
4. Participate in designing hardware molds.
Reason for leaving:
* * company
Commencement date: August 2004 ~ June 2006.
Company nature: wholly foreign-owned.
Industry: machinery/electromechanical/equipment/heavy industry
Position: fitter and mechanic
Job description: The main tasks are: to be responsible for the daily processing of the company's wire cutting parts, and to assist relevant personnel to complete the processing of other parts, such as milling machine processing, grinding machine processing, drilling machine processing, etc. Participate in the maintenance of equipment,
Reason for leaving: further study at school.
Model essay on project experience in engineer's resume (2)
Company name: Guangzhou Panyu * * Hardware Plastic Products Factory
Date: 2005-05 ~
Nature of company: private enterprise
Industry: chemistry, biological products
Position: Electroplating Technician
Job description: 1. Responsible for leading a class of chemists to analyze the pretreatment of degreasing, hydrophilicity, coarsening, catalysis, chemical nickel precipitation and copper pyrophosphate electroplating of automobile parts plastics (ABS, PC/ABS); Analysis and monitoring of bath components such as cupric acid, semi-gloss nickel, gloss nickel, nickel seal, pearl nickel, gloss chromium and trivalent black chromium in electroplating production line and handling of abnormal problems.
2. Detect the stress in the copper-nickel plating solution, and measure the coating thickness and potential difference. And the analysis results are controlled by SPC process statistics, and I am familiar with Hull's pool test.
Reason for leaving: seeking development.
Company name:
Commencement date: October, 20021~ April, 2005, Fengning aluminum hub shell electroplating factory, Baiyun District, Guangzhou.
Nature of company: private enterprise
Industry: chemistry, biological products
Position: chemist, laboratory engineer.
Job Description: Analysis of electroplating bath solution (copper, nickel, chromium, tin, zinc, iron and silver) of automobile aluminum hub shell, analysis of wastewater treatment (total copper, chromium, nickel and zinc), adjustment of brightener in Hull cell test, and corrosion resistance (CASS) test of coating.
Reasons for leaving: poor efficiency and factory closure.
Company name:
Commencement date: 200 1-03 ~ 200 1-07 Guangzhou Zhida Electronics Factory.
Nature of company: private enterprise
Industry: electrical, electronic and communication equipment.
Position: Chemical Analyst
Job Description: Analysis of bath solution for PCB electroplating (except glue line, PTHLine, graphic electroplating line, electroless nickel-plated gold line and electroplated nickel-plated gold line).
Reason for leaving: Returning to my hometown for development.
Model essay on project experience in engineer's resume (3)
March of xx? so far
Xx co., ltd, I am an engineer. The main work is:
1, new product introduction, flow chart making, mold fixture evaluation;
2. Abrupt exception handling, process improvement and process verification in the process;
3. Provide relevant technical support, guidance and training for technicians and production personnel;
4. Control and improvement of finished products of production materials.
March of xx? July of xx year
Xx co., ltd, I am an engineer. The main work is:
1, development and design of low-smoke halogen-free products and improvement of production technology;
2. Development, design and maintenance of hot runner mold;
3. Improve the production process by 4M 1E to provide technical support for manufacturing;
4. Make production process documents, optimize production process and make fixtures;
5. Trial production of raw materials, analysis and improvement of abnormal quality;
6. Introduction, trial production and mass production of new products.
March of xx? July of xx year
Xx co., ltd, as an industrial engineer. The main work is:
1, introduction and mass production of new products, formulation of standard working hours;
2, production work instruction and process design;
3. Improve the production technology, improve the production efficiency and control the production cost;
4.CABLE\ Analysis and solution of abnormal problems in the production of computer peripheral lines;
5, all kinds of wire processing equipment debugging and maintenance management.
Matters needing attention in filling in project experience in engineer's resume
1, which must be filled in according to the project. The project is a temporary work with a clear start time and end time. Don't fill in the project experience as a job with no clear end time (such as a position in a functional department).
2. You must prove that you have managed a cross-functional team. The project management mentioned by PMI is essentially cross-functional or cross-professional, not a single function or professional field. If you have only managed a single functional or professional team, you are not eligible to apply for PMP.
3. Deliverables of all five process groups (start, plan, implement, monitor and close) must be available during the whole project experience, although not all five process groups are required for every project.
4. Deliverables should basically correspond to your working hours in various process groups, not in? Working hours? Part of the working hours of a process group are filled in, but in? Deliver results? There is no deliverable for this process group in the description section at all.