Haoji Railway (formerly known as Hua Meng Railway) starts from Haole Baoji South Station in Ordos City, Inner Mongolia Autonomous Region, and passes through Wushenqi, Jingbian, Yan 'an, Yichuan, Hancheng, Hejin, Wanrong, Yuncheng, Sanmenxia, Lushi, Xixia, Dengzhou, Xiangyang, Jingmen, Jingzhou, Jiangling, Gongan, Shishou and Huarong in Hunan Province. Finally, go to Ji 'an Station of Beijing-Kowloon Railway.
The total length of Haoji Railway (formerly known as Hua Meng Railway) is 1.806.5 km, in which the double-track length of Hao Lebao from Jinan to Yueyang is 1.375.3 km, and the single-track length of Yueyang to Ji 'an is 43 1.2 km.
Haoji Railway crosses the Yangtze River once and the Yellow River twice, and successively crosses the Mu Us Desert, the Loess Plateau in northern Shaanxi, Luliang Mountain, Zhongtiaoshan Mountain, Qinling Mountain, Jianghan Plain, Dongting Lake Plain and the hills in western Jiangxi from north to south. There are 770 large and medium-sized bridges on the main line, with a total length of 38 1km, including extra large bridges 10km above 5km and 229 tunnels, with a total length of 468.5km, in which the ratio of bridges to tunnels is about 46.9% 10km.
Extended data
The construction process of Mongolia-China railway;
2065438+In July 2004, the National Development and Reform Commission approved the feasibility study report of building a new railway coal transportation corridor from Mengqian to Central China. On March 201August 17, the track laying of Hua Meng Railway, the longest heavy-haul railway under construction in China, began. On June 4th, Fenhe Bridge of Hua Meng Railway was closed.
2065438+On March 6, 2009, China Railway Construction Electrification Bureau Group Co., Ltd. successfully set up the first carrier cable in Linnan-Xiangzhou section of Hua Meng railway ditch. At the same time, the first house of Xiangzhou Comprehensive Maintenance Base of Hua Meng Railway was capped. Hua Meng Railway No.4 Power Project entered the fast lane. 2065438+On July 2, 2009, Hua Meng Railway, the longest dedicated coal transportation line in China, completed track laying.
2065438+August 2009, Haoji Railway started dynamic inspection. 2065438+September 2009, the contractor of China Railway 22nd Bureau Group successfully completed the last set of interlocking tests of 1 switch at Zhang Shan Railway Station of Hao (Lebaoji) Ji (An) Railway Hub, and planned to officially open to traffic on the eve of National Day.
China Radio International-Haoji Railway opened the channel of "Coal from North to South" today.