On April 26th, Huo and his party, member of the Party Committee of Yunnan International Power Investment Co., Ltd. and chairman and general manager of Myanmar Zero Carbon Energy Co., Ltd., visited Xinhua County to inspect the pumped storage power station project. And discuss and exchange on project promotion. Li Tiexiong, secretary of Xinhua County Party Committee, Zuo Zhifeng, deputy secretary of the county party Committee and county magistrate, Wang, second-level researcher of the county government, and third-level researcher attended.
It is understood that the upper reservoir of the pumped storage power station project is initially located in Bainiping, Tianmen Township. Rainwater storage area is about 7.2 square kilometers, normal water level 1 100 meters, dead water level 1075 meters, and regulated storage capacity is 8 million cubic meters. The initial location of the Lower Reservoir is Heshu House in Windsor Town, and the rainwater collection area is about 8.9 square kilometers. The normal water level is 700 meters, the dead water level is 675 meters, and the regulated storage capacity is 8 million cubic meters. The initial planned installed capacity is 6.5438+0.2 million kilowatts, with a total investment of about 7 billion yuan.
Resume is a very important word in the daily life of software engineer job seekers. The following is a sample resume of a software engineer that I shared. I ho