Opening time of Shenzhen Metro Line 3
Specific stations of Shenzhen Metro Line 3 (Hongling Middle Road-Longxing Street Station): Hongling Middle Road Station, Buji Joint Inspection Station, Hongling Middle Road Station, Buxin Station, Dongmen Middle Road Station, Laojie Station, Buji Passenger Station, Buji Town Government Station, Huifu Garden Station, Tianbei Road Station, Danzhutou Station, People's Hospital Station, Yu racecourse station, Tangkeng Station, New World Plaza Station and Yinhu Market. The total length of Longxing Street Station of Shenzhen Metro Line 3 is 32.9 13km, including 6.92km underground line, 0.28 km ground line and 25.7 13km overhead line. . The estimated investment is 9.886 billion yuan. It is planned to be completed in 2009. Line 3 is divided into four sections: Luohu, Buji, Henggang and Longgang, with a total of 2 1 station. The starting station is Hongling Middle Road Station and the destination is Longxing Street Station. The line is laid along Shenhui Road, with a total length of 32.983 kilometers, after leaving the hole at Buxin Station through the underground of Luohu. Transfer Line 3 to Metro 1 at Luohu Dongmen Laojie Station, to Light Rail Line 5 at Tangkeng Station, and to guangzhou-shenzhen railway at Buji Bus Terminal. The construction started this time is the Henggang Depot and Comprehensive Base of Metro Line 3. Upon completion, the maximum running speed of the train will reach 100 km, and it only takes about 45 minutes from Hongling Middle Road to Longgang Central City. If you buy a house, you can also buy it if you live by yourself. If you buy an investment, it is still recommended not to buy it. There shouldn't be much fluctuation in house prices in recent years.