Current location - Education and Training Encyclopedia - Resume - Scale of Guizhou Wujiang Hydropower Development Co., Ltd.
Scale of Guizhou Wujiang Hydropower Development Co., Ltd.
At present, Hongjiadu (600MW), Dongfeng (695MW), Suofengying (600MW) and Wujiangdu (1250MW) have been completed and put into operation, with a total installed capacity of 3145 MW; . The hydropower stations under construction include Goupitan (3000MW), Lin Si (1050MW) and Shatuo (1 120MW), with a total installed capacity of 5170mw; ; Thermal power projects under construction include Bijie thermoelectric circulating fluidized bed unit, a sub-project of Bijie coal, electricity, coal and chemical integrated circular economy project, with a total installed capacity of 300MW.

The company holds 25.3% shares of Guizhou Qianyuan Electric Power Co., Ltd. (1559MW, 908 MW under construction), Peng Yi Hydropower Station 12% shares (150MW) and Chongqing Wujiang Qingshuihe 12% shares.

By 20 1 1, the company's installed capacity will reach 9000MW. China Huadian Group Guizhou Company was established on February 25th, 2003, and is responsible for the management of Huadian's thermal power enterprises in Guizhou, such as Qingzhen (400MW, technical transformation of Tangzhai project in different places: 1200MW), Zunyi (250 MW), Dalong (600 MW) and Dafang (1200 MW). In order to give full play to the advantages of regional resources and realize mutual assistance between fire and water, Wujiang Company and Huadian Guizhou Company were integrated and managed from June 5438 to 10, 2007. There are 4382 employees.