Under the leadership of the general manager of the construction company, the project manager of the construction unit is fully responsible for the organization and management of the construction project and team building, and implements the relevant national laws and regulations. More resume templates can be found on this website.
Resume of the project manager of the construction unit
Name: Nationality: China.
Current residence: Guangzhou Nationality: Han nationality
Household registration: Jilin height and weight: 178 cm 75 kg.
Marital status: marriage age: 34 years old
?
Job hunting intention and work experience
Talent type: general job hunting
Application position: construction/real estate/property management: road and bridge manager (national), construction/real estate/property management: company manager,
Working years: 1 1 job title: intermediate.
Job Type: Full-time Availability Date: Anytime
Monthly salary requirement: 8000- 12000. I hope to work in Hunan, Jiangxi and Guangdong provinces.
Work experience: Company name: Commencement date: 2009-010/4, Bid 7 of Dongguan Ecological Park Avenue Municipal Road Project (k 10+253-k 12+277) (affiliated to Guangdong Yangjiang Jian 'an Group Co., Ltd.).
Company nature: private enterprise industry: real estate, construction, installation and decoration.
Position: Project Manager
Job description: soft foundation treatment: replacement, riprap and silt squeezing, deep cement mixing pile.
Bridges; Three medium bridges, punching cast-in-place pile foundation and 20m hollow slab beam.
Water supply: ductile iron pipe. Drainage: secondary reinforced concrete socket pipe. Sewage: FRP sand pipe (supported by steel sheet pile)
Temporary facilities: 2 steel pipe pile temporary bridges.
The total cost is 65.438+0.02 billion yuan.
Reason for leaving: The project is completed, and the boss has no follow-up projects (secondary subcontracting).
Company name: Commencement date: September 2007 ~ June+February 2008, No.4 Contract Section of Qin Nan Road, Zhuhai City (k5+800-k7+200) (affiliated to Jiangxi Ganbei Highway Engineering Company).
Company nature: private enterprise industry: real estate, construction, installation and decoration.
Position: Project Manager
Job description: soft foundation treatment of bagged sand drain and mixing pile; Subgrade; Cement stone powder base; Concrete pavement; Municipal drainage (drainage pipe and HDPE drainage pipe), water supply (ductile iron pipe), street lamp project, green sprinkler irrigation project (PE, UPVC), cable trench, pedestrian underpass bridge.
The total cost is 46 million. Measurement software PAY2000 system.
Reason for leaving: the project is completed and the boss has no follow-up projects.
Company name: Commencement date: February 2006 ~ August 2007, Guangzhou Huangpu District Key Public Construction Management Center.
Company nature: government agency industry: real estate, construction, installation and decoration.
Position: Road and Bridge Project Leader
Job description: project bidding
Old road reconstruction and drainage works around Hulin Road (municipal) and Nanhai Temple.
Bridge, soft foundation treatment, subgrade and pavement, drainage.
Bored pile, T-beam, box girder, insert plate, mixing pile, powder jet grouting pile, high-pressure jet grouting pile, asphalt pavement, concrete pavement and drainage pipe.
Reason for leaving: Contract expired.
Company name: Commencement date: 2002-11~ 2005-12 China Railway 13th Bureau Group Co., Ltd.
Company nature: State-owned enterprises: real estate, construction, installation and decoration.
Position: Deputy Project Manager and Project Manager
Job Description: Deputy Project Manager, Dongguan Waterway Bridge (380m through concrete filled steel tubular tied arch bridge).
Project Manager, Maintenance and Reinforcement Project Department of Shijie Bridge, Shijie Town, Dongguan
The main bridge of Dongguan Waterway Bridge is a 380m half-through concrete filled steel tubular tied arch bridge, and the approach bridge is a 760m T-beam bridge with a linear shape of 0.5km ... with a total cost of 250m.
Bored pile, T-beam, box girder, mass concrete, concrete filled steel tube, soft foundation treatment, subgrade.
Reason for leaving: voluntary resignation
Company name: Commencement date: August 2000 ~ 2002- 1 1 China Railway 13th Engineering Group Co., Ltd. Sixth Engineering Company.
Company nature: State-owned enterprises: real estate, construction, installation and decoration.
Position: Minister of Engineering Department, Chief Engineer of the Project.
Job Description: Hanwu Highway, Han Ji Railway, Mu Jing Bridge on Xingqing Line,
Highway subgrade, asphalt pavement, open-cut foundation, cast-in-place pile, pier and culvert
Reason for leaving:
Company name: Commencement date: 1999-08 ~ 2000-08 Huang Shuo Railway Project Department of China Railway 13th Bureau Group Co., Ltd.
Company nature: State-owned enterprises: real estate, construction, installation and decoration.
Position: Technician, Budget Officer, Minister of Engineering.
Job description: project bidding
Huang Shuo Railway and Gaohe Bridge
Subgrade, pavement, line slag line, open-cut foundation, cast-in-place pile, pier and culvert
Reason for leaving:
?
academic degree
Graduate school: Shijiazhuang Railway Institute
Highest education: Bachelor degree: Bachelor degree Date: 1999-07-0 1.
Major: transportation, civil engineering, road and bridge engineering, and the second major: budget officer.
Training experience: start date, end date, year, and the number of special industry certificate obtained by the school (institution).
1995-08 graduation certificate and degree certificate of Shijiazhuang Railway Institute majoring in traffic and civil bridge engineering.
1999-091999-12 Employment Certificate of Budget Officer of Shijiazhuang Railway Institute
2006-012006-4 Guangzhou Municipal Construction Committee Construction Project Manager Training Certificate
?
linguistic competence
Foreign Language: Good English.
Putonghua level: proficient in Cantonese level: poor.
?
Working ability and other professional knowledge
tendering and bidding
Soft foundation treatment, subgrade construction, municipal roads and drainage.
Foundation construction, prefabrication, cast-in-place bridge, concrete filled steel tube tied arch bridge, old bridge reinforcement.
Computer; , AUTOCAD perspective, pr0 object project management, VISIO flow chart.
PHTOSHOP image processing, POWERPOINT slides, FRONTPAGE web page making.
System maintenance.
Strong language ability. Passionate, sincere, steady and delicate.
I like sports computers.
?
A detailed personal autobiography
;