1. Yinghuiyuan shantytown renovation project, covering an area of 24.6 mu. Min Wei, secretary of Xinghualing District Party Committee, promised the masses that the demolition area is 26,500 square meters and the planned construction area is 1 1270 square meters. At present, the project is in the process of land transfer.
2. Lvjingyuan affordable housing renovation project covers an area of 59.7 mu. Li Nong, deputy secretary of Xinghualing District Committee and district head, promised the masses that the demolition area was10.33 million square meters and the planned construction area was10.07 million square meters. At present, the project is going through the land formalities.
3. Dadongguan Street 156 shantytown renovation project, covering an area of 8.3 mu. Yang Junmin, deputy secretary of Xinghualing District Committee and director of the United Front Work Department, promised the masses that the demolition area was 2,000 square meters and the planned construction area was 20,000 square meters. The project is currently being planned and designed.
4. The first phase renovation project of Wohushan shantytown covers an area of 130 mu. Cheng Xiangqun, member of the Standing Committee of Xinghualing District Committee and secretary of the Political and Legal Committee, promised that the demolition area was 6.5438+0.8 million square meters and the planned construction area was 6.5438+0.5 million square meters. At present, the detailed construction plan of the project is being worked out.
5. The shantytown renovation project of East Station freight yard covers an area of 25.35 mu. Wang Xiangqun, member of the Standing Committee of Xinghualing District Committee and deputy head of the district, promised that the demolition area would be10.5 million square meters and the planned construction area would be 93,000 square meters, so as to realize harmonious relocation and ensure the construction of the relocation project. At present, the detailed construction regulations and planning and design conditions of the project have been approved.
6. Reconstruction project of shanty towns of Taitie staff dormitory in Shengli Street, covering an area of 16.49 mu. Shi Guoli, member of the Standing Committee of Xinghualing District Committee and organization minister, promised the masses that the demolition area was10.52 million square meters and the planned construction area was 52,000 square meters. At present, the pre-examination of land use is being processed.
7. Construction North Road 185 shantytown renovation project, covering an area of 4.3 mu. Zhang Zhenguo, member of the Standing Committee of Xinghualing District Committee and director of the District Committee Office, promised the masses that the demolition area was 6,400 square meters and the planned construction area was 23,000 square meters. At present, the control regulations of this project are being adjusted.
8. Reconstruction project of shanty towns in Shengli Street1No.3 Hospital, covering an area of 26 mu. Wu Runsheng, member of the Standing Committee of Xinghualing District Committee and Minister of Propaganda Department, promised the masses that the demolition area was 8,700 square meters and the planned construction area was 42,000 square meters. Planning and design are currently under way.
9. Li Xinyuan Southern District shantytown renovation project, covering an area of 33 mu. Yang Tianyu, member of the Standing Committee of Xinghualing District Committee and secretary of the Discipline Inspection Commission, promised the masses that the demolition area is 20,000 square meters and the planned construction area is 6,543,800 square meters. At present, the project details are being processed.
10. Dunhua Chemical Road No.9 shantytown renovation project, covering an area of 10.2 mu. Li, member of the Standing Committee of Xinghualing District Committee and political commissar of the Armed Forces Department, promised the masses that the demolition area was 2,000 square meters and the planned construction area was 22,400 square meters, which laid the foundation for the whole region to accelerate the realization of "creating a livable environment and building a harmonious urban area". At present, the project is waiting for the preliminary planning of the National Development and Reform Commission, and the preliminary planning and design scheme has been worked out.