Current location - Education and Training Encyclopedia - Resume - Changsha rail transit route guide
Changsha rail transit route guide
Mileage of departure station and destination station, starting date, opening date, grouping, 23 26.57km Huangxing Depot of Metro Line 2, 2009/9/282014/296B phase I Everbright-Wangchengpo Bid 19 22.26km Huangxing Depot, 2009/9. 296B West Extension Wangchengpo-Meixi Lake West 44.449K201112015/12/28 Maglev Express Line No.3 Maglev high-speed railway station-Maglev Airport Station 6544. 16 Three subway lines 1 will be opened soon. Kaifu District Government -20 23.6km Shangshuangtang Depot 201012/26 will be opened soon. 6B Metro Changsha Station-Zhuzhou South Station-Xiangtan Station 17 82.3KM Changsha Depot will be opened soon.

Zhuzhou rolling stock depot

Xiangtan Depot will be opened on June 30, 2065438 * [Maglev Express Line] will be put into trial operation on February 26, 20 15, and it is planned to be put into operation on June 26, 2065438 (ticket sales).

* [Metro 1 Line] started trial operation on March 2 1 6, and it is expected to be put into operation (ticket sales) at the end of June 20 16.

* [Changsha-Zhuzhou-Xiangtan Line of Metro] This line was opened for operation in sections, and the southern section was opened for operation at the end of 20 16. At present, the tunnel has been opened, and the track laying stage of the southern line will be completed in May:

The northern section is expected to open on 20 17.

The operation time of the starting and ending stations of the line is the one-way interval fare. The first and last subway line Guangda-Meixi Lake West 6: 30-22: 3052 minutes Feng Ping: 6 minutes 10 second.

Peak: 5 minutes and 50 seconds. Starting: 2 yuan/time.

Whole journey: 6 yuan/sec. Head count: 06: 30.

Tail number: 22: 30 * Orange Island Fireworks Display Day (Saturday or major event), juzizhou station and Xiangjiang Middle Road Station of Metro Line 2 stop on the same day 18: 00, and the train does not stop.

(The specific jumping date and time are subject to the official news) Maglev Express Line Maglev high-speed railway station-Maglev Airport Station is about to open, is about to open, is about to open the subway 1 Kaifu District Government-Shangshuangtang is about to open, is about to open, is about to open the subway Changsha Station of Changsha-Zhuzhou-Xiangtan Line-Zhuzhou South-Xiangtan Station is about to open, is about to open, is about to open as of March 438+06, 2065. Soon to be opened are: Maglev Express Line, Changsha Metro 1 Line (Phase I). The starting date of the mileage depot of the starting and ending stations of the line is expected to be opened, and the 36.4km yang hu Park depot of Shantang-Guangsheng 25 Station of Changsha Metro Line 3 will be organized for construction.

Zhanggongtang Parking Lot 2014/01/032065438+2008B Changsha Metro Line 4 Yangfengcun-Xu Guangda Former Residence 25 Station 33.7km Xingcheng Depot.

Huanglang Parking Lot 2014/12/3120/9 am 6B Panlong Road-Times Avenue 18 Station 22.5km Tuqiao Depot 2015/1.

Zhuzhou rolling stock depot

Xiangtan Depot 20 10/06/3020 16 South Section Changsha-Zhuzhou-Xiangtan 17 Bid Section 82.3km2010/06/302016 Changsha Rail Transit Construction Plan at the end of June (20 32065433 The newly-added line is about 12 1km long, with 83 stations, including 99.38km underground line, 2 1.7km overhead line, 68 underground stations and 0/5 overhead stations. By 2022, the total network size will be about 264km. The departure time of the mileage marshalling station at the starting station and destination station of the line is expected to open the Huangli Depot of Wu Tong Road-Huanghua Airport West 32 Station of Changsha Metro Line 6, 48.7Km 6A.

Wu Tong Road Parking Lot 20 16 2022 Mid-term Lu Yun Road-Dongsi Line 20 Station 20 16 2020 Wu Tong East Road-Lu Yun Road 7 Station 20 18 2022 West Dongsi Line-Huanghua Airport West 5 Station 20 18 2022 West Length of Changsha Metro Line 7.

Guishan Parking Lot 20 17 202 1 Changsha Metro Line 65438 +0 North Extension

Kaifu District Government -9.93km6B Shangshuangtang Depot, Cai Xia Road No.5 Station.

Fanshenhuan Parking Lot 20 17 202 1 West Extension of Changsha Metro Line 2

Meixi Lake West-Jinqiao Railway Station 1 1 Station 14.72km6B Huangxing Depot in Phase II

Lei Feng Parking Lot 20 17 202 1 Changsha Metro Line 4 North Yan Ruipu Avenue-Lianjiang Road Station 8 14.26km6B Xingcheng Depot

Huanglang parking lot

Wangcheng Parking Lot 20 18 2022 Dongyan Guihua Avenue-Songgongtang 5 Station Changsha Metro Line 5 North Yan 'an Sha Road-Panlong Road 2 Station 3.65km6B Tuqiao Depot

Jiefang Park Parking Lot 20 18 2022 Nanyan Times Avenue-Datuodong 7 Station 8.43km Forward Line Changsha Metro Line 8 34 Station 50.9km Dashengmiao Depot.

Hanpu parking lot

Zhoujiapu Parking Lot 20 18 2022 Changsha Metro Line 9 Changsha Metro 10 Jinqiao Railway Station-Unknown Changsha Metro10 Changsha South Station-Unknown Changsha Metro 12 LAM Raymond Road-Unknown. Chang Zhu Line Chang Zhu Tan Line Chang Liu Line Changning Line Changsha Metro 1 Line North Extension.

Phase II Cai Xia Road-No.8 Station 6B Shangshuangtang Rolling Stock Depot

Fanshenhuan parking lot Changsha Metro Line 3 Nanyan Shantang-Unknown Station 3 6B Yanghuyuan rolling stock depot

Zhanggongtang Parking Lot The first bus of Changsha Metro Line 2 goes to Everbright (uplink) Station to Wangchengpo (downlink)/

/everbright

Everbright 6: 30

22: 30 Last bus First bus 6: 37 23: 15 Changsha South Station

South Station 6: 33 22: 33 Last bus and first bus 6: 35.

23: 13 Du Hua road

Du Hua Road 6:35.

Last bus at 22:35, first bus at 6: 32.

23: 10 Shawan Park

Shawan Park 6: 37

Last bus at 22: 37, first bus at 6: 30.

Changsha Avenue 23: 08

6: 33 Changsha Avenue

Last bus at 22: 40, first bus at 6: 36.

23: 05 Renmin East Road

6: 30 Renmin East Road

Last bus at 22: 43, first bus at 6: 34.

23: 03 Wanjiali Plaza

Wanjiali Plaza 6: 32

Last bus at 22: 45, first bus, 6: 3 1

23: 00 Jintai Square

Jintai plaza 6:34

Last bus at 22:47, first bus at 6: 30.

22: 59 Changsha Railway Station

6: 30 train station

Last bus at 22: 49, first bus at 6: 37.

22: 57 Yuanjialing

Yuanjialing 6: 32

22: 5 1 Last bus, first bus, 6: 35.

22: 55 Yingbin intersection

Yingbin Road 6: 34

Last bus at 22: 53, first bus at 6: 33.

22: 53 Furong Square

Furong plaza 6: 30

Last bus at 22: 55, first bus at 6: 32.

22: 5 1 Wuyi square

Wuyi square 6: 32

Last bus at 22: 57, first bus at 6: 30.

Xiangjiang middle road 22: 49

Xiangjiang middle road 6: 33

Last bus at 22: 59, first bus at 6: 39.

22: 47 orange island

Juzizhou 6: 35

23:0 1 Last bus, first bus, 6: 37.

22: 45 Xuanwan Town

Yingwan town 6: 30

Last bus at 23:03, first bus at 6: 34.

22: 43 West Lake Park

West Lake Park 6: 32

Last bus at 23: 05, first bus at 6:32.

22: 40 Jinxing Road

Jinxing road 6: 34

Last bus at 23: 08, first bus at 6: 30.

22: 38 Wangchengpo

Wangchengpo 6: 30

23: 10 Last bus, first bus, 6: 36.

22: 36 Meixi Lake East

Dongmeixi Lake 6: 32

23: 12 last bus, first bus, 6: 34.

22: 34 Cultural and Art Center

Culture and art. Art center 6: 34

23: 14 Last bus, first bus, 6: 32.

22: 32 Lu Yun Road

Lu Yun Road 6: 36.

23: 16 Last bus, first bus, 6: 30.

22:30 Meixi Lake West

Ximeixi Lake/

/Last bus reference:

[5]