The installation direction and position of coated (pasted) glass should be correct. Insulating glass shall be sealed with double channels. The pressure equalizing pipe of insulating glass should be sealed.
Inspection method: Observe and inspect the construction records.
Inspection quantity: randomly selected from each inspection lot 10% and not less than 5 pieces (places).
Modular curtain wall plate assembly shall meet the following requirements:
1, sealing strip: the specification is correct, the length has no negative deviation, and the joint lap meets the design requirements;
2, thermal insulation material: fixed firmly, the thickness meets the design requirements;
3. Steam barrier: the seal is complete and tight;
4, condensate drainage system unobstructed, no leakage.
Joints between curtain walls and surrounding walls should be filled with elastic closed-cell materials and sealed with weather-resistant sealant.
Inspection method: observation and inspection.
Inspection quantity: randomly selected from each inspection lot 10% and not less than 5 pieces (places).
The thermal insulation or sealing of expansion joints, settlement joints and seismic joints shall meet the design requirements.
Inspection method: Observe and inspect against the design documents.
Inspection quantity: randomly select 10% for each inspection lot and not less than 10 pieces (places).
The adjusting mechanism of movable sunshade facilities should be flexible and can be adjusted in place.
Inspection method: field adjustment test, observation and inspection.
Inspection quantity: randomly select 10% for each inspection lot and not less than 10 pieces (places).