The personal work of civil quality engineer at the end of the year has been summarized, and I have been working for X years in a blink of an eye. Looking back on the work in the past three years, I was deeply touched and gained a lot. During these three years, I worked as a quality controller in three projects. In retrospect, I think I am qualified for this position. Since graduation, I know almost nothing about the professional knowledge on the construction site and the business at work. Now I can better take the initiative to integrate into this circle. I feel that I am growing step by step. At first, I thought that the quality controller would always have a hard time at the scene. Now I feel the importance of the position of quality controller. It is really easy to be a qualified quality engineer, but it is difficult to be an excellent quality engineer. But I think that after years of hard work and study, I am fully qualified for my present job, and I believe I will do it slowly and gain something. I remember when I just graduated from work, I couldn't handle some things independently, and my goals were not clear, no matter at work or in life. I don't realize my strengths and weaknesses. After continuous training in the project, I slowly learned how to find and solve problems. In order to strengthen my work level, strive to improve my comprehensive quality, strictly abide by various rules and regulations, and complete my duties, I will briefly summarize my thoughts, feelings and work in recent years as follows:
Position and working ability: During these three years, I have worked in three project departments, that is to say, I have constantly supplemented my professional knowledge and social experience in the practice of these construction sites. I remember the days when I started my internship in Shanghai International Financial Center. I learned a lot of basic knowledge about the construction site. I followed some technicians to the construction site to find problems and put the book knowledge I learned from school into practice. After the completion of the site, I went to work in the xx plot project, and gradually felt that I should transfer the information from the wild to the indoor, and integrate every construction technology and technology on the site into the information until I made a complete completion data.
Now I continue to be the quality engineer of xx Plaza project. Through the careful guidance of my leaders and colleagues, I have been able to independently complete my daily work in terms of technology and quality. The specific work mainly includes the following aspects:
1, review and report the construction sequence and billing of each ZuoYeDui. I will carefully check all aspects of each pile, including the construction sequence, whether it can be constructed, whether the measurement is consistent, the length of drilling tools and data calculation. , and then report to the supervisor, until all correct, and save for future reference.
2. Quality acceptance. Before construction, set witness points for key working procedures in the construction process. When the construction reaches these steps, the subcontractor will inform our general contractor quality engineer in advance. For witness points, all tests shall be carried out in strict accordance with the regulations.
Now I can slowly discuss some problems in the industry or on the construction site with the technical director and the construction director, and recall my work experience, which is still an important period in my life. During this period, my gains mainly include two aspects: the progress of political thought and the study of work experience and working methods.
I just graduated from school and entered a society full of ideals. I didn't know my own shortcomings, especially the gap between theory and practice, until I did it. You can't do even a small thing well. I just came to the construction site, and my post is responsible for the quality acceptance on site; As a quality engineer, we should not only master professional testing knowledge, but also find problems, find problems and solve problems with our heart. So I have benefited a lot from the on-site quality work in the past six months. Learn to understand the construction drawings before inspection, do a good job of supervision, and find and correct the problems existing in the inspection process. Cooperate with on-site construction personnel to conduct a comprehensive inspection of the quality of each working procedure, and timely propose and correct the problems existing in each working procedure. Follow up and check the whole process of key working procedures to ensure that each working procedure is qualified. Strictly control the quality of each acceptance process, summarize the analysis results afterwards, and do a good job of reporting, so as to facilitate the continuous improvement of the work. After work every day, find out the merits of the problems that are easy to appear in the inspection process, and constantly improve the personal professional inspection level; Coordinate and solve the quality problems on site in time and reflect them carefully so that you can sum up your experience well. At work, there are also the following shortcomings:
1, sometimes there is still a gap between work and leadership requirements. On the one hand, because of youth, lack of work experience, lack of courage in the work, lack of firmness in the organization and command of the work.
2. Sometimes work sensitivity is not very strong. Not sensitive enough to the things assigned by the leaders, sometimes the work is not ahead of schedule and the report is not timely enough.
3, play in the work is not obvious enough. In the process of assisting management, I lack the initiative of bold management. In the future, I will strengthen my study, constantly improve my management level, and constantly sum up experience in my work. Work plan for the coming year:
1, will further develop the advantages, improve the shortcomings, and do our best to do our job well. Maintain a good mental state and carry forward the spirit of hard work, advancing despite difficulties, striving for perfection, being rigorous and meticulous, and being proactive. Clear up work ideas and improve work efficiency.
2. Before inspection, I must know the items, inspection methods and technical requirements to be inspected. In order to make preparations in advance in the inspection and inspection work. And should be prepared in advance before the inspection, and carefully supervise and inspect.
3, do a good job of supervision in the process of inspection, timely find and correct the problems existing in the process of inspection. Track and inspect the production and whole process of high-quality processing technology to ensure that each process is qualified.
In a word, I have fulfilled my duties as a quality inspector in my own post and achieved certain results, which can not be separated from the support of leaders and the help of my colleagues. Express heartfelt thanks to the leaders and colleagues! The above is my summary of my thoughts and work in recent years. Please criticize and correct me.
Summary of year-end personal work of civil engineering quality engineer II. My job is a quality engineer, which is an important position to grasp the quality of the project. Work attitude determines everything, and you must be meticulous and meticulous when you work. You can't always make mistakes. If necessary, check the results of your work to make sure that your work is foolproof. After work, we should always sum up work experience and lessons, constantly improve work efficiency and sum up work experience. Although I will make some mistakes in my work and be criticized by my leaders, I don't think this is a shameful thing, because I think these mistakes and criticisms can help me avoid similar mistakes in my future work and make me grow faster in my work.
I also know the importance of my work. If a person wants to make a difference in his post, he must be familiar with the professional knowledge of the post and broaden his knowledge through continuous learning. So I take "doing better" as the goal, do my work well in a down-to-earth manner, and study hard to enrich myself after work. Although I will encounter many setbacks in my work, I believe in myself. There is a good saying, "Where you fall, you get up." I am still very young, and I believe that as long as I pay more than others, I will be able to make up for my lack of professional knowledge.
As a quality inspector, the focus of quality inspection work: before quality inspection, it is very important to control beforehand, and nip in the bud is the fundamental, so all hidden dangers are eliminated. As a quality inspector, you must be fully familiar with the situation before the project starts, including the understanding of construction drawings, scheme design and joint review, which are all involved in the whole process. Only by adopting this serious attitude can our quality inspection work be done well.
Do all the tests in strict accordance with the regulations. First, the team should conduct self-inspection. After the self-inspection is qualified, it shall be inspected by the quality inspection personnel of the project department, and then submitted to the supervision engineer for inspection and signature. If the previous procedure is unqualified, the next procedure shall not be constructed, so as to achieve "five no construction, three no handover". "Five No Construction" means: no construction without technical disclosure; Do not construct if the drawings and technical requirements are not clear; Measuring piles and data are not constructed without audit; If the materials are unqualified, the construction will not be carried out; No project that pollutes the environment may be constructed without inspection and visa. "Three Non-handover" means: no handover without self-inspection record; Without professional acceptance shall not be handed over; The construction record is incomplete and handover is not allowed. And do a good job in the "three inspections" of each process.
In the process of quality inspection, we should keep dynamic supervision. Find and correct the problems existing in the construction. Cooperate with the builder to conduct a comprehensive inspection of the project quality, and put forward and correct the problems in construction in time. Track and check the whole process of construction technology of special procedures to ensure that each procedure is qualified. Inspection is a fine inspection process. Details determine success or failure. During the construction of the main body, many inspections found that the reinforced area of the beam was wrong, and the reinforced connection between the column and the beam-column joint did not meet the requirements of the specification, which was corrected by the reinforced team. Cooperate with the project department to check and solve the problem of poor appearance of poured columns, and solve the problem of slurry leakage by asking carpenters to strengthen formwork support and concrete pouring workers to improve vibrating technology; Strictly control the quality of commercial concrete entering the site, check whether the concrete meets the design requirements of drawings on site before pouring in each part, and notify the operators to take samples and make inspection records.
Summarize the analysis results afterwards to facilitate the continuous improvement of the work. Every day after the construction, find out the problems that are easy to appear in the future and the merits in the construction process, and write them into the construction diary; Participate in the regular meeting of the project department and the monthly owner coordination meeting, summarize how to work to ensure substantive results and continuously improve personal business level; Seriously reflect the quality problems that need to be solved by the company in the field, and organically link the company with the project department.
Summing up the work in the past 1 year, although some achievements have been made and great progress has been made, there are still some shortcomings. Occasionally I will make mistakes in my work because of carelessness, which will bring unnecessary trouble to my work. Sometimes work sensitivity is not very strong. Not sensitive enough to the things assigned by the leaders, sometimes the work is not ahead of schedule and the report is not timely enough. Many jobs are average. In the future, I will finish my work seriously with a rigorous working attitude.
The end of 20xx year and the arrival of 20xx year are both the beginning and the end. What is displayed in front of me is a fertile ground for me to gallop, and I clearly feel the heavy responsibility. I will further develop my advantages, improve my shortcomings and try my best to do my job well. We should maintain a good mental state and carry forward the spirit of hard work, advancing despite difficulties, striving for perfection, being rigorous and meticulous, being proactive and "daring to fight hard". Clear up work ideas and improve work efficiency. In my future work and life, I will continue to study, practice deeply and improve myself constantly. I will live up to the opportunity and leadership given me by the company, the cultivation and trust of my colleagues, and I will grow up with the company.
The year-end personal work summary of civil quality engineers will soon be over. This year is a crucial year for project management to reach the standard, and the standardization work has also reached a new level. The work of one year is summarized as follows:
First, strictly control the quality of partial projects. Conscientiously implement the system of three quality inspections, with team self-inspection, process handover inspection and special inspection by quality department. Conduct quality disclosure to the team in advance, including the construction situation of each working procedure, and the most important thing is quality control, which requires deviation control within the scope allowed by the specification. Monitor the process, explain the problems found to the team in time, or issue a rectification notice and make a rectification notice.
The second is to intensify quality inspection. The quality department strictly requires the team and foreman to strictly control all aspects of the construction, and the quality department monitors the whole process. Daily inspection: check the measured quantity of each unit project and sub-project every day, record the measured data and reflect the data to the team. Weekly routine quality inspection: Every week, the Quality Department will inspect all sub-items and issue rectification notices, and at the same time, check and report the quality rectification last week. Weekly routine quality meeting: The quality department informs all the quality problems detected every day in a week at the meeting, analyzes and summarizes the causes of such problems, and formulates countermeasures to avoid recurrence. Subcontractors talk about their own ideas and put forward their own difficulties, and the project quality department will solve them.
Third, special process monitoring. The quality department monitors the whole process of special processes, including key processes such as basement waterproofing and electroslag pressure welding. If it is found that it does not meet the specifications and design requirements, it shall be rectified at the first time, and it must be rectified to create the best conditions for the next working procedure and resolutely avoid rework.
Fourth, about project management standards. Project management reaching the standard is a hard target of China Construction Fourth Bureau, which must be completed with good quality and quantity. It seems that the strict requirements of the bureau are actually effective guidance for project management and a weather vane to guide whether the project can be done well. Whether it can reach the standard depends on the understanding and attention of the project and the team. As long as you want to do well and meet the standards, you will certainly meet the standards. The requirements in the project management standards are very specific and detailed. And our project department and construction team sometimes neglect management and do nothing, which must be put an end to. The quality department has strict requirements for all controlled X items, and must meet the requirements of reaching the standard. Make plans and schemes for each link, and conduct disclosure, inspection, feedback and audit.
Verb (abbreviation for verb) contact and communicate. Our quality department communicates with labor service teams and supervision units in a timely and effective manner in daily life. In order not to delay the construction period, each link can be implemented continuously and quickly. Check the team at ordinary times and ask for rectification in time to ensure that every acceptance can be passed at one time. For the company, the quality department reports the project quality management to the company's project management department by telephone every month, records the requirements of the project management department, and carefully studies the rectification.
Sixth, information. All materials should be conceived in advance and learn from the advantages of other projects to make up for their own shortcomings, but they cannot be copied. After learning, they should be innovative and do better than others. All materials must be completed at the right time, and materials cannot be supplemented later.