Personal Work Summary of Supervision Year-end (1) Dear company leaders and colleagues,
First of all, I want to thank the leaders of the company and my colleagues, and sincerely thank them for their concern and help in the past year.
When I joined Shengtai Company, I worked as a structural engineer. Although there are many hardships, but under the care of leaders and colleagues, I came step by step to enrich myself. We feel the warmth of family here. We are family, and the company is our home.
Standing on the post of special supervisor, you need to learn strong professional skills and good moral quality. We should learn from their work experience, their work characteristics and the coordination of their interpersonal relationships. Exchange work experience irregularly and use concrete examples to achieve the expected goals. Each of our supervisors should find out the gaps and deficiencies according to their own work and learn from excellent supervisors; Based on the experience of veteran comrades, we should set a high starting point and be strict at the beginning of our work, jointly improve the service level, establish an image and expand the development space. The following are some of my experiences in studying supervision work:
First, the truth of being a man; The supervision work we are engaged in follows the principle of "abiding by the law, honesty, justice and science" and gradually moves towards standardization. We should also strive to grow into a member of an organic group that dares to struggle and unite as one.
We should be soberly aware of the harm to society caused by favoritism and abuse of power at work, and hope that everyone will lead an honest and clean life.
In work and life, we should not only learn professional skills, but also learn the truth of being a man, and learn their attitude towards work and the truth of being a man from old engineers.
The second is about the problems existing in the work of supervisors:
(A) pay attention to the unity of collective learning and autonomous learning.
The professional quality of supervisors in our unit is uneven, and the level is far from meeting the market demand. Supervision mostly comes from pure technology or construction enterprises, with relatively simple knowledge structure, insufficient organization and coordination ability and lack of backbone talents in their prime of life. Therefore, we must pay attention to study, and don't speak layman's words at the construction site, which can effectively solve the problems in the project and make suggestions for the construction unit. The supervisor who comes early should keep forging ahead and set an example first. Newcomers should study hard, pay attention to practice, do it little by little, pay attention to the accumulation of experience and catch up as soon as possible.
(2) Pay attention to working methods and do a good job in relationship coordination. The current regulatory situation requires our supervisors to:
First, the business level should be high, and you should rely on the project wholeheartedly.
The second is to coordinate the relationship. Supervision is a kind of service behavior, and we are recognized and paid by the construction unit through our own professional labor. When we go to the construction site, we must straighten our position. We can't pretend to be experts and tell the construction unit what to do according to norms, regulations, laws and regulations, but we should be good at explaining the situation and let the construction unit understand the benefits of doing so.
Don't pretend to be the manager of the construction unit. The problems found should be clear, and the inspection and acceptance should be strengthened after being clear. If it can't be solved, let the owner and the project director coordinate. Otherwise, the relationship will be stiff and the work will not be done well. For the construction unit, if it only charges and does not provide services, then the result can only be "selling our future for short-term interests."
(3) Strictly control the quality, and the acceptance materials, acceptance batches, disciplines and sub-projects must be inspected in person, and the conclusion must be consistent with the real thing. If everyone's acceptance of the project is specious, the inspection is not in place, and they go through the motions, of course, they will accept all the orders, so sooner or later there will be quality problems, and you will be legally responsible for the problems.
Finally, with the care and help of the company's leaders, we will make serious efforts to contribute to the company's bright future.
I hope the company will prosper and create greater glories.
Summary of personal supervision work at the end of the year (Part II) I have been engaged in supervision work in the company for more than nine months. In these nine months, I can say that there are gains and losses. But for me personally, the biggest gain is that I have learned new knowledge and technology at work and accumulated some work experience.
Since last year 10, I have been working in j 1 supervision office of Changsha Ring Expressway. Since March this year, I have been arranged by the leaders of the Supervision Office to be the site supervisor in a2 contract section, responsible for the site supervision in the fourth work area. The starting and ending pile numbers of the four work areas I am responsible for are k7+ 14 1.6~k9+000. Bridges include Qingshan Li Fen Bridge and Huangxia Middle Bridge. Culverts have been completed and subgrade filling has reached the top of Area 94. As on-site supervisor, I must strengthen the study of construction norms and standards, conscientiously do a good job of standby at various construction sites, and make standby records.
For xx years of work, there are mainly the following insights.
First, I am a student cadre at school, and I feel that good study, good ability and good communication are the overall advantages. In fact, I think I can see the school and society, life and work now, which is a kind of growth. Now I can realize this psychologically, which is the real growth.
Second, as a supervisor, I feel that it is sacred enough from the bottom of my heart, at least it is a stumbling block to prevent the construction unit from doing the bean curd dregs project. I will continue my responsibility and the principle of real supervision, continue to go on and continue the future.
Third, when it comes to work, I know what the supervision office has to do, from the collation of information to the control of the whole project. These are all things I have to learn and consolidate slowly.
Fourth, of course, I also have shortcomings. Because you are young, sometimes you are too self-centered. This is what I need to change. Sometimes the situation of the construction unit is reported too slowly, and I need to correct it. In the future, I will face the supervisors with a good attitude; Treat everything with the principle of "no procrastination" and the standard of "supervision rules". Only in this way can we be worthy of ourselves and the company.
Xx years, in the upcoming work, I want to sum up the shortcomings in the previous work and strive to do better in the future work!
Summary of personal work of supervision at the end of the year (3) 20xx years have passed and a new year has begun. At this moment, I want to summarize and review the supervision work in the past year, so as to do better work in the coming year, foster strengths and avoid weaknesses, promote the improvement of supervision work and improve my own supervision business level.
The following is divided into three aspects, reviewing the work in 20xx. Please correct me if there are any shortcomings.
I. Review of the work
The xx building project I am in charge of has been successfully capped, and it was accepted by the main body in 20xx, and passed the acceptance of the municipal safety and civilized standard chemical industry in 20xx.
In the past year, the quality, safety and progress of the projects in charge were generally normal, and no quality and safety accidents occurred. Many inspections by the quality supervision station and the safety supervision station show that there are no major problems. The construction progress basically conforms to the general plan, and the communication with the owner and the construction unit is smooth, and the owner unit has no complaints. The so-called "one hero and three gangs", the smooth development of the work can not be separated from the trust of leaders at all levels of the company, the guidance of the director and the help of colleagues, and I would like to express my heartfelt thanks here.
Second, shortcomings.
1, the level of safety management needs to be strengthened. Xx building project is a standardized project to create municipal safety civilization. The construction unit has a strong sense of safety management, and the safety rectification problems raised by the supervisor can be implemented in time.
2, urge the construction unit to submit for approval information is not timely. Failing to send the construction materials for inspection in time, and failing to take measures to urge the construction unit to send them for inspection in time.
3. The professional level of supervision needs to be improved, and the research on new norms and standards is insufficient.
4. Supervision work is a service work. Handling and coordinating the relationship between all parties and units is the basis for the smooth development of supervision work. Personal supervision methods and supervision efforts need to be strengthened, and the coordination ability with all parties and units needs to be strengthened.
Third, the outlook for next year
Looking forward to 20xx, several projects have started and will start soon. So I have reason to believe that working and living in this excellent team will make the company's development in the coming year bright. I am determined to unite my colleagues around me, learn from them with an open mind, sum up experience in time, constantly improve my business level, enhance my consciousness and enthusiasm, improve my coordination ability with all parties, and do my best for the company's development and growth!
Summary of personal work of supervision at the end of the year (Chapter IV) Time flies, and before you know it, the hopeful year of 20xx is coming. The important work this year is summarized as follows:
First, the main work content of an individual for one year
This year, I mainly participated in the first phase of the closure project of xx Bonded Port Area, the underground pipeline survey of xx City, the site restoration project of xx, the displacement observation of the comprehensive building, and the measurement of several projects of the company.
Second, perform job responsibilities
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.
In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and try to do it. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
Third, work experience, feelings and shortcomings
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
Four. Personal career development opinions and views on the company next year.
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.
Supervision year-end personal work summary (V) Plan control supervision year-end personal work summary plan control supervision year-end personal work summary plan control supervision year-end personal work summary plan control supervision year-end personal work summary plan control supervision year-end personal work summary plan
From XX every year 10, I transferred from Shenhua coal direct liquefaction project to Shenhua Ning Mei Group dimethyl ether project, and worked as the plan control supervisor for two years. In the past two years, I have been working hard with good professional ethics and a strong sense of responsibility. Now I summarize my work and experience in these two years as follows.
After arriving at the site, under the leadership of Director Cui Jinghua, the project leader, I learned about the supervision scope of our unit (water treatment system, circulating water system, air compressor station, train canning station, torch, main corridor, methanol tank farm, boiler and power generation device, purification and synthesis device, etc.). ), and then I will take the time to get familiar with the construction drawings and all kinds of related materials, understand the site situation in the shortest possible time, and quickly invest in the daily work of supervision.
Because the project schedule involves the major interests of the owner and the contractor, it is the key to the smooth implementation of the contract. At the same time, it is also one of the main tasks in coordinating the work of "four controls, two controls and one supervision". Therefore, in the construction supervision work, I regard the balance between the planned schedule and the actual project schedule as the key link of schedule control and plan management. Only by paying close attention to the possible gap between the actual progress and the planned progress in the project implementation process and urging the contractor to speed up the project progress in time can the project be completed as planned.
In the process of project implementation, I first made a professional analysis of the whole project, and established the monthly progress and ten-day progress control chart of sub-projects to monitor the monthly progress and ten-day progress of sub-projects. Its chart adopts the form of visual progress chart, which can directly reflect the actual progress of the project. In order to keep abreast of the gap between the actual progress and the plan of each major construction. When there is a gap, the supervision engineer will be notified to the contractor in time, requiring the contractor to take measures to speed up the construction progress. At the same time, the construction unit is required to provide relevant information for me to comprehensively evaluate the actual progress of the project. If the actual construction progress of the contractor really affects the completion date of the whole project, the contractor is required to adjust the construction progress plan immediately to ensure the smooth completion of the project within the time limit stipulated in the contract.
Secondly, the network method is used to make the construction plan and control the project progress, because the network method can make the process arrangement compact, facilitate grasping the key points and ensure the reasonable distribution and utilization of construction machinery, manpower, financial resources and time. It is very important for the contractor to determine the key route of the project by using the network method when making the project schedule. In addition to asking the contractor to make a network plan, I will always check the progress of the project with the network plan.
When I check the progress of each project, I will write down the actual construction time in different colors on the network diagram for comparison and inspection with the plan. If the construction time of a project on the key line is longer than planned, it means that the whole construction period will be extended. At this time, the contractor is required to take effective measures for future projects on key lines to speed up the construction progress or increase the construction strength and shorten the construction time, so as to make up the gap between the project progress and the planned progress and keep the project progress balanced. If the implementation time of a project on the key line is shorter than planned, it is beneficial to shorten the construction period. According to the actual progress of the whole project and the needs of the project itself, we can negotiate with the owner to determine whether it is necessary to complete the project ahead of schedule and inform the contractor of the decision. In any case, the contractor is required to re-prepare the future network plan, check whether the key lines have changed and prepare the future construction plan.
In my daily work, I patrol the site every day, track the progress, check the deviation and summarize it in the supervision log in time. Through the joint efforts of the owner, the supervision company and the construction unit, the nodes that have been completed so far are as follows: See the attached table;
In addition, in the supervision work in the past two years, I sorted out the minutes of 97 regular supervision meetings, and at the same time helped the librarians to sort out and file the internal information of supervision and the information submitted by the construction unit. Because our company has a wide range of supervision and many equipments, there are three epc (contractors) and three e+p+c (construction units) in the construction unit. It is a great task for the librarians to receive the materials submitted by six construction units and submit the supervision materials to the owner.
The data of project entities and internal pages are very important links. The data reflect the use of materials in the project, whether each working procedure meets the relevant requirements, and whether the construction unit follows the construction drawing. After the construction, we report to the director and the director's representative in time, urging the construction unit to pay close attention to rectification and closure, so as to synchronize the entity with the data, which has been well received by the owners' group company and the Second Engineering Office in many inspections.
With the progress of work, continuous learning and patient guidance from leaders, my working ability has been greatly improved. I think only by establishing a correct outlook on life and values can we do a good job. In the future work, I will update and supplement new knowledge through continuous learning, improve my own quality, sum up experience and better complete the supervision work. Summary of my work in Nine Elephants Arrangement