Current location - Education and Training Encyclopedia - University ranking - Detailed drawing of Changsha Metro Line 4
Detailed drawing of Changsha Metro Line 4
Guanziling, Moon Island West, Xiangjiang New City, Hanwangling Park, Fuyuan Bridge West, Chazishan, Guanshaling, Liugoulong, Wangyuehu Bay Town Hunan Normal University, Hunan University, Fubuhe, Bisha Lake, Huangtuling, Shazitang, Chigangling, Shuling, Guitang, Shawan Park, Sutang, Pingyang and Changsha.

Guanziling-Moon Island West-Xiangjiang New City-Hanwangling Park-Fuyuan Luqiao West-Chazishan-Guanshaling-Liugoulong-Wangyuehu-Wanzhen-Hunan Normal University-Hunan University-Fubuhe-Bisha Lake-Huangtuling-

Changsha Metro Line 4 [Line 4/Purple Line] is planned to run from Lianjiang Road in Wangcheng District in the northwest of the city to Songgongtang in Huangxing Town in the southeast of the city, with a total length of 56 kilometers. * * * There are 35 stations, of which 1 1 are subway line interchange stations and 3 are intercity railway interchange stations. The first phase project of Line 4 (Guanziling Station-Dujiaping Station) started construction on February 3 14, put into trial operation at the end of October18, and began trial operation on May 26, 20 19. Changsha Metro Line 4 connects Wangcheng District, Yuelu District, Tianxin District and Yuhua District, and passes through important functional centers and hub areas such as Wangcheng Waterfront New City, Binjiang New City, Wanzhen Business Center, Yuelu Mountain University City, Nanhu New City, Sports New City, High-speed Railway Area and Huanglang Sub-center. While sharing the traffic pressure in the north-south direction of the main city, guiding the city to expand to the northwest and southeast direction is an important road for urban passenger transport hub.

Changsha Metro Line 4, with a planned total length of 56 kilometers and 35 stations, is the backbone line of external radiation in the northwest and southeast of the main city. Quickly connect the high-star group, the main city and the Huanglang group in series, covering the traffic corridor along the river west of Xiangjiang River, and guiding the city to expand to the northwest and southeast. The first phase of Changsha Metro Line 4 covers Guanziling Station to Dujiaping Station, with a total length of ***33. 7 kilometers, with 25 stations, all underground, with an average distance of 1. 44km, with a total investment of 24.9 billion yuan. The most difficult station is Wanzhen Station, with complicated geological conditions. The maximum station spacing is 2096m, from Xiangjiang Xincheng Station to Hanwangling Park Station, and the minimum station spacing is 680m, from Hunan Normal University Station to Hunan University Station, with Xingcheng Depot and Huanglang Parking Lot. The project also has two main substations (West Lake Park and Shawan Park) and a control center, which are shared by the first phase of Metro Line 2. With six B-cars, the maximum running speed of the train is 80 km/h. It is expected to be completed and put into trial operation in the middle of 20 19.