Current location - Education and Training Encyclopedia - University ranking - Zhao Lei's major event
Zhao Lei's major event
Main participating projects:

April 2008 to June 2009165438+1October:

Participated in the major petroleum project of China, "Study on Three-dimensional Geological Modeling of Main Reservoirs in Yuejin Oil Region of Qaidam Basin and Numerical Model Scheme of Remaining Oil", participated in stratigraphic correlation and sedimentary facies research, and compiled the contour map of sand body thickness, sedimentary microfacies plan, oil sand body map, grid map and other maps of the target reservoir group. Calculate the reserves, and use petel software for structural modeling.

February 2008 to August 2009:

Participated in the "Study on Sedimentary Microfacies in North Area of Lou Jing Oilfield", mainly involved in the correlation between single well and combined well and the study and compilation of sedimentary facies map in this area.

From April 20, 2009 to the end of 20 10:

Mainly responsible for part of the research work of the national "Eleventh Five-Year Plan" major project "Fine Reservoir Description of High Water-cut Oilfield" and reading a large number of professional documents in Chinese and foreign languages; Responsible for sorting out basic data, dissecting braided river alone, modeling alone, and participating in later mathematical model research.

2012165438+10 to 20 13 65438+ 10:

Oil and gas resources evaluation project in Gabon, Africa

Oil and gas resources evaluation project in Madura block, Indonesia

Oil and gas resources evaluation project in Niaotou Peninsula, Indonesia

Oil and gas resources evaluation project in Malaysia

March 20 13 to May 20 13:

Rapid assessment of Barran Darta operation

Mainly responsible for three-dimensional geological modeling of Sikau Oilfield and Hasnah Oilfield.

May 20 13 to June 20 13:

The third round of rapid assessment of RSC (A 21&; D4 1) Project (the third round rapid evaluation project of oil and gas resources of Locke Petroleum Company)

Mainly responsible for A2 1 rapid evaluation project: responsible for seismic interpretation, including fault interpretation and stratigraphic interpretation, and establishing velocity model to provide basis for the establishment of 3D geological model. Establish a three-dimensional geological model, calculate GRV volume, and provide basic data for calculating reserves.

June 20 13 to July 20 13:

D2 1RSC Third Round Rapid Assessment (J4&; D2 1) project (the third round of rapid evaluation project of oil and gas resources of Locke Petroleum Company)

Understand the project process and participate in the preparation of D2 1 rapid assessment project report and PPT. Yin, Zhao Lei,; Integrating multidisciplinary information modeling with constant update rate theory [J]; Journal of Southwest Petroleum University (Natural Science Edition); 20 10 No.6