The first board of directors was successfully convened.
SMA exchange delegation visited to discuss the advanced technology of SMA implantation.
20 13 1 ~ February
20 13. 1 The company name was officially changed to "Jiangsu Zhaofu Aisuo New Energy Co., Ltd." 20 13.2, and various government permits, licenses and approvals of the joint venture company were obtained.
20121February
2012 65438+February 20th-Megavolt Esso and SMA Solar Technology AG (SMA/FWB: S92) signed an equity transfer agreement in Shanghai, confirming the transfer of 72.5% of the equity to SMA Solar Technology AG (SMA/FWB: S92), and conducted in-depth strategic cooperation with SMA in the field of photovoltaic inverters.
20 12 10 month
The due diligence team of SMA Group held formal negotiations with the management team of Megavolt Esso on cooperation matters, and initially reached the cooperation intention.
August 20 12
The CEO of SMA Group led the operation team to inspect Megavolt Esso and held further talks with Megavolt Esso on cooperation.
2065438+May 2002
Australian branch established
2065438+May 2002
SMA delegation visited Megavolt Esso Suzhou factory for the first time.
20 12 1 month
On 20 12 1.5, the merger of Jiangsu zhaofu new energy and Jiangsu aisuo new energy was completed, and it was officially renamed as "Jiangsu zhaofu aisuo new energy co., ltd, headquartered in Suzhou.
20 1 1 July
The low-power TL4600 inverter ranks first in Asia in the photon test results of authoritative third-party institutions in the global photovoltaic industry.
20 1 1 may
German branch established
20 10 April to May
From April to May of 20 10, Megavolt Industrial Park was completed, forming a production scale of 500MW photovoltaic inverters. The photovoltaic grid-connected inverter products range from 1.5 kW to 1 MW.
August 2009
Esso began to officially ship, with a production capacity of 5,000 units/year.
May 2009
Jiangsu aisuo new energy co., ltd was established. "
June 5438, 2009+10 month
It undertook the first EPC project, namely the energy-saving Ningxia Taiyangshan 10MW solar grid-connected power station.
July 2008
The company moved to a new factory and changed its name to "Jiangsu Zhaofu New Energy Co., Ltd."
May 2008
R&D Center settled in Shanghai University of Science and Technology Science Park.
June 5438, 2007+10 month
Jiangsu Nanzi Tonghua New Energy Power Co., Ltd. was established.