1 and Line 2 constitute the "X" of rail transit.
The subway 1 and Line 2 under construction constitute the "X" of Changsha rail transit. According to the relevant person in charge of Changsha Rail Transit Group, Duhua Road Station, Changsha Avenue Station and Jintai Square Station of Metro Line 2 have completed the main construction of the subway station, and seven shield machines have entered the subway shield section. According to the requirements of Changsha Municipal Party Committee and Municipal Government, the subway sections along wuyi avenue of Metro Line 2 will be fully connected before September this year, and the original roads and traffic will be fully restored in wuyi avenue before the National Day. Metro Line 2 is scheduled to open in June 2065438+2003.
Metro 1 Line has also entered the preparatory stage of subway station construction, running north and south. The line starts from Cai Xia Road in Kaifu District and ends at Wanjiali Road in Tianxin District. It is planned to open to traffic at the end of 20 14.
Changsha Metro Line 3 (Line 3) will start from Pingtang Town, the pilot area of Dahexi River, pass through Yanghuhuan Ecological Wetland Park, arrive at Buhe Road, the capital of Yuelushan University, and transfer to Metro Line 4, then cross Xiangjiang River to connect with Baisha Road in the north, transfer to Metro Line 1 at Houjiatang Station via Laodong Road in the east, reach Station Road along Renmin Road in the east, and then transfer to Changsha Railway Station and Metro Line 2 in the north along Station Road. Then cross Liuyang River to the east, reach the Engineer Avenue in front of Changsha University, continue to transfer to Metro Line 5 at Wanjiali Road to the east, and finally reach Huangxing Town to the east.
Changsha Metro Line 4 (Line 4) starts from Wangcheng County, goes south along Jinxing Avenue, transfers to Changsha-Zhuzhou-Xiangtan Intercity Railway on the west side of Changsha Municipal Government, transfers to Metro Line 2 in Xuanwan Town along LAM Raymond Road to the east, then transfers to Metro Line 3 at Yuelushan University Town on Fubuhe Road along Lushan South Road, then passes through Xiangjiang River from Nanhu Road Tunnel south of Orange Island to the east, and finally arrives at Changsha South Station in Wu Guang via Huang Chi Road.
Changsha Metro Line 5 runs from south to north along Wanjiali Route.
Metro Line 5 runs south to north along Wanjiali route. According to the relevant person in charge, Wanjiali Road starts from CITIC New City in the south of Changsha, and then transfers to Metro 1 line to the east, then transfers to Metro Line 4 at Laodong Road, and transfers to Metro Line 6 and Metro Line 2 along Wanjiali Road to the north, then transfers to Metro Line 3 at Engineers Avenue, and continues northward near Ansha Town, Changsha County.
Changsha Metro Line 6 runs from Meixi Lake to Huanghua Airport.
Metro Line 6 (Line 6) starts from Meixi Lake in the pilot area of Dahexi River, and transfers to Tongzipo Road and Metro Line 4 to the east. After passing Xiangjiang River along Tongzipo, transfer to Xiangya Road and Metro 1 line, then transfer to Metro Line 2 along Yingbin Road to the east, transfer to Renmin Road Metro Line 3 to the south, and transfer to Metro Line 5 and Metro Line 3 via Renmin Road to the east.
Changsha Metro Line 5 mainly runs in Hexi and will cross Rongwan Town Station of Line 2. It is an important subway line from Wangcheng County in the north to Hanpu Town in the south. However, the Changsha subway is only planned at present and may not be completed until around 2020. Line 5 mainly runs in Hexi.