Zhang Zhihong, secretary of the Party Committee of the school, and Wang Shaowu, president of the school, led the responsible comrades of the office, logistics department and other departments to inspect the water accumulation on the school roads and carry out work on the spot.
Listen to the work report of the person in charge of the relevant department at the scene, and ask the relevant units to immediately organize forces to dredge and drain the accumulated water, and lay wooden boards to facilitate the travel of teachers and students. Water accumulation on campus roads is a problem that teachers and students are very concerned about. Relevant units should attach great importance to it, take the initiative, strengthen contact and docking with relevant departments in Wuhu City, fully promote the transformation of stagnant water points, effectively solve the problem of stagnant water on campus main roads, and ensure the safety of campus travel for teachers and students.
The responsible unit is required to remind students to pay attention to safety in time, formulate rectification measures as soon as possible, and eliminate potential safety hazards. As of 4: 00 pm on April 25, the teachers and students of the school can basically pass normally.