Three summaries of workshop work
How to write a model essay on the summary of maintenance workshop work? Maintenance workshop is the production focus of chemical enterprises, and the importance of safety management is self-evident. This article is a complete set of three model essays on workshop work summary compiled by me, for your reference only.

More personal work summary content recommendation (click to enter ↓↓↓ ↓)

Three self-summaries in the last semester of senior three.

Personal summary of college members 1000 words model essay

Summary of 8th grade's Mathematics Training and Make-up Program

Summarize five high school students at the end of the term.

Personal summary of teaching in three rural areas during summer vacation

Term summary composition 600 words

Model essay 1:_ _ year is coming to an end. Over the past year, with the care and support of leaders at all levels of the company and the close cooperation of brother units, the maintenance workshop has made positive progress, worked hard in unity, overcome the problems of less staff, heavy workload and aging equipment in the main workshop, and successfully completed various tasks assigned by the company; Effectively guaranteed the safe and stable operation of the company's production.

Through unremitting efforts in the past year, no matter how big the task is, we always adhere to the principle of safety first, the safe operation level of equipment is improving day by day, the safety skills and quality of employees are increasing day by day, the professional level has been significantly improved, and the overall execution of the workshop is also constantly strengthening. The work in all aspects in the past year is summarized as follows: 1. Work task completion.

1, overhaul work:

(1), 1 18#, 2 17#,13 #, 230#, 126#, 2/kloc-. 2 10#, 104#, 207#, etc. 14 electrolytic cell overhaul work, such as disassembly and assembly of electrolytic cell superstructure, bus repair, welding and cutting of splitter blades. Shorten the working time of maintenance plan and effectively ensure the smooth power-on of electrolyzer;

(2) From March to July, the overhaul of the main engine of 1 # ~ 6 # air compressor was successfully completed without affecting the normal production. Ensure the air supply for equipment operation;

(3) Complete the overhaul of 3# Roots blower in June.

2, maintenance work:

(1), and complete the monthly inspection of rails in electrolytic workshop and casting workshop;

(2) Complete the maintenance inspection of Yangcheng Branch's 13 cranes, replace 4 driving wheels and 2 driven wheels, replace the steel wire rope 1 1, repair the imported hydraulic pump 1, and overhaul the hydraulic cylinder 10 times;

(3) Replace 88 groups of aluminum buses;

(4), complete the daily inspection, maintenance and maintenance of eight air compressors;

(5), complete the maintenance and inspection of dust removal system;

(6), 1528 aluminum guide rod, 52 aluminum mother shafts, 2 10 aluminum mother shaft chain plates, 50 sections of aluminum pipes, 150 multifunctional crane shell-breaking hammer, 1820 pieces of equipment accessories, etc.

3. External work: 1 month workshop implements rationalization proposal, and makes and installs a 40-meter large busbar enclosed room outside the east wall of electrolysis workshop; In February, 80 cathode carbon blocks were independently designed and processed to ensure the smooth overhaul of the electrolyzer; In March, the dislocation of bearing beams and tracks on the upper part of No.248 ~ No.253 slots in No.2 workshop was corrected, which effectively ensured the safe and efficient operation of traffic. In April, the old pipes were put aside to work overtime and a production waterway system of 1 10 meters was set up in the aluminum pool, which effectively ensured the normal operation of production. In May, employees were organized to work overtime to install two sets of intermediate frequency furnaces in the assembly workshop to realize one-time smooth production; In June, we organized personnel to install 39 water and gas flow meters, which facilitated the company's measurement work to be true and effective, and the work of energy saving and consumption reduction was carried out smoothly. In July, the special discharging hopper for 12 electrolyte was made by using the existing resources, which avoided the problem of difficult discharging of metal hopper. In August, the materials needed to make a power outage plan include 20 electrolyte boxes and 50 tablespoons of electrolyte. In September, the rationalization proposal was implemented, and the tank at the top of the190m raw material warehouse was removed and installed; /kloc-in October, the raw material dumper was made of waste reducing agent, and the effect was very obvious; 1 1 month, making full use of idle time and overtime time to make 248 sealing devices for cracking cylinders of electrolytic cells; Water supply pipeline of solid waste treatment plant is 250m.

4. Energy-saving technological innovation: In terms of energy saving and consumption reduction, the maintenance workshop will evaluate the air compressor stations and purification stations with high energy consumption from class to class, from group to group, from month to month and from year to year, and demand every employee with the lowest standards, advocate the declaration of "saving glory and wasting shame" and effectively control energy consumption. 10 is a brand-new day in the workshop, and the electricity consumption has been obviously improved. Taking this as a reference, we will continue to carry out energy-saving work. In terms of innovation, we independently developed alumina dumper, bus processing machine, self-made casting open ladle, ladle baking machine and so on.

Achievements are the product of labor, and the above achievements are the result of the efforts of all employees in the maintenance workshop; Achievements belong to the past. We should not show off our future work with temporary success. Failures and shortcomings still exist. Only by working hard in the future can we eliminate shortcomings and improve ourselves.

Second, the safety management:

1, completion of annual production safety indicators:

There were 0 personal accidents with minor injuries and above; Fire risk 0 times; Public security and traffic accidents 0 times; General equipment accident 0 times; Equipment failure for 3 times; Unsafe (attempted) phenomenon twice; Handling maintenance work tickets 148, and the qualified rate of work tickets100%; Handle aerial work tickets 163, and the qualified rate of aerial work tickets is 99%; The qualification rate of safety education and training is over 95% (all qualified); The qualification rate of safety education and training for new and transferred workers100%; Emergency plan drill 4 times; Fire drill and drill twice;

2, the annual production safety management main work:

(1), the workshop re-established and revised the workshop safety management system based on the position that safety work is above everything else, above everything else and above everything else, persisted in strengthening and improving employees' safety awareness, and established the idea of "life first and safety production first" among employees. At the beginning of the year, the workshop organized employees to sign the responsibility book of safety objectives, and re-discussed and revised the safety operation procedures of each post. The content of "Finger Dictation Working Method" was written. At the same time, according to the current situation of internal safety production, the workshop independently carried out special anti-habitual violation treatment activities and formulated anti-violation measures in the workshop, which effectively reversed the situation of workshop safety management.

(2) According to the company's unified arrangement, seriously organize and study the "four systems", and carry out publicity and education activities through blackboard newspaper, morning meeting, after-work meeting, safety activity day and other forms in combination with the theme of safety month activities. Adhere to the daily morning meeting, weekly safety and health inspection and monthly safety meeting, and actively participate in the safety speech competition organized by the company. At the same time, attend at least three safety and security meetings organized by the team every month, and ask the team to seriously discuss and reflect on the actual cases of the company during the safety day activities, so as to achieve the purpose of comprehensive grasp, comprehensive understanding, comprehensive implementation and comprehensive improvement of safety publicity.

(3) Workshop safety management needs to be further strengthened. Habitual violations occurred many times this year, and a serious violation occurred. When dealing with the displacement of cement beam on the track in the second electrolysis workshop, two employees fought on the track and their safety belts were not fastened, which reflected that the person in charge of the work did not pay attention to the safety monitoring work, and his safety thought was paralyzed, and the regulations on the management of aerial work tickets were not strictly implemented. At the same time, problems such as lax requirements, poor management and inadequate supervision in the implementation of the work ticket system are exposed in the workshop, which leads to weak sense of responsibility and safety of individual employees. There are still loopholes in the safety management of the workshop. This workshop has an unshirkable responsibility and is also the top priority of workshop management in the future.

(4) Strengthen on-site management and investigation of potential safety hazards. Let employees establish the concept of "hidden dangers are controllable and accidents can be prevented". Any accident has signs and symptoms, and it has to go through a process of germination and development. Heine's Law states: "Behind every serious accident, there must be 29 minor accidents, 300 near misses and 1000 hidden dangers". Any accident can be prevented if we can attach great importance to it, prevent it in advance, move forward in management, shift the focus, work hard at the source, find all kinds of signs and symptoms in time, and deal with all kinds of hidden dangers in time. Therefore, the workshop strengthened on-site safety inspection and hidden danger management. The workshop organizes management personnel to conduct four comprehensive inspections on equipment, site and safety every month, and four special inspections on special equipment, cranes and electric welding machines; 44 comprehensive inspections, 40 special inspections and 4 seasonal inspections throughout the year; In the whole year, 28 hidden dangers of equipment and 228 defects of site management were investigated, which have been rectified in time, avoiding the occurrence of serious accidents and bringing benefits to the company invisibly. Check 92 violations. In every inspection, the safety inspection of the system should be done horizontally to the edge, leaving no dead ends vertically. Never go with the flow, dare to grasp, dare to manage, check violations, find hidden dangers, and eliminate them early. Never give trouble to the company, and ensure the safety of the maintenance party.

(5) In the overhaul workshop, 36 hidden dangers issued by superiors were rectified on time, with good quality and quantity * * * throughout the year, and the rectification, review and timely feedback to the Safety and Environmental Protection Department 100%. Evaluation methods have also been developed.

(6) In the aspect of "5S" site management, combined with the requirements of "5S" content, the maintenance workshop has undergone a thorough reform. Unused or temporarily unused steel and equipment under the maintenance work platform, workshop secondary warehouse, machining station, air compressor station, purification station and square front should be rectified, returned to the warehouse, and the fixed storage area of the workshop should be refreshed again.

(7), double base construction is a solid backing to ensure safety work, is a solid foundation for safe production, workshop targeted to strengthen the on-site safety management of aerial work; Check the storage, transportation and use of oxygen and acetylene; Summarize the investigation and management of potential safety hazards in the past 100 days; Organize safety knowledge training for all types of work in the workshop, strengthen 5s on-site management, improve the domestic capital of double-base construction in the workshop, and make a summary of double-base assessment.

Three, _ _ _ _ year work deployment:

1. The maintenance workshop continues to focus on the principle of high quality and efficient service to ensure that there are no accidents throughout the year; Ensure the safe and efficient operation of the equipment; Ensure that the purification and feeding system is smooth; Ensure that the pneumatic air supply system is unimpeded; Ensure that the bus voltage drop is minimized; Ensure that the processed parts are completed on time and with high quality.

2. Strengthen ideological guidance through in-depth internal marketization, enhance implementation awareness, set an example for advanced learning, carry out criticism and self-criticism, constantly improve themselves, and pay close attention to employees' ideological trends; Really consciously accept the task unconditionally and without excuses.

3, strengthen business skills training, through lectures and seminars, continue to do a good job of mentoring, put an end to rework, so that the efficacy can achieve high efficiency and high quality.

4. Strengthen communication among employees, teams and workshops, and effectively improve execution.

5. Strengthen the implementation of execution, carefully make plans, define responsibilities, control time limits, and regularly or irregularly check the work progress and quality at the work site. Good experience should be summarized and popularized in time, and bad experience should be corrected and improved in time.

6. In order to embody the distribution principle of "getting more for more work, according to one's ability", break the original mode of equal pay for the same post, use internal market-oriented economic leverage to mobilize the enthusiasm of employees, regard employees as a resource, integrate the advantages of all employees' labor force through internal market-oriented operation, and make the management process scientific, thus standardizing team building.

2008 is a year for our company to seek development and growth under the weak market competition, and challenges and opportunities coexist. Under the new situation, the burden on our shoulders will increase. We should help each other in the same boat, share the same fate with enterprises, think less about how bad the outside world is, and think more about how to do it ourselves! At the beginning of the new year, we will carry forward our advantages, make persistent efforts, overcome our shortcomings and bravely break through difficulties. Learn from the advanced experience of other workshops with an open mind and make greater achievements in the work of 20 13.

Summary of Workshop Work Part II: In, under the correct leadership of the station leader, with the cooperation of all departments and the joint efforts of all maintenance workers, the workshop implemented planned maintenance, vigorously strengthened the maintenance and technical transformation of mechanical and electrical equipment, successfully completed more than 20 planned maintenance, eliminated 242 defects and made 8 technical transformations.

I. Completion of equipment maintenance and overhaul tasks

We need to deal with the shortage of equipment in advance and solve it as soon as possible. Equipment maintenance, advocate "repairing the old and using the waste". In addition to careful inspection, maintenance personnel also need to keep in touch with the workshop regularly to understand the operation of the equipment and be on standby when dealing with emergencies. By the middle of February, there were 257 equipment defects in 65438+. Except for some cases requiring power failure or water stoppage for maintenance, 242 items were eliminated by * * * meter, and the defect elimination rate was 94%. 62 electrical work tickets and 48 hydraulic turbine work tickets were completed, with the qualification rate of 100%.

1, planned maintenance and equipment maintenance. At the beginning of the year, under the leadership of the station leader, all employees in the maintenance workshop had a late Spring Festival holiday and left work early. Repair welding the runner of three units in one workshop; Since the establishment of the station, the defects that the tailrace inlet valves of three turbines have never been opened have been overhauled, and the bottom valves of drainage pumps have been overhauled and improved. The No.2 exciter in a workshop was overhauled, and the commutator and slip ring were rotated to adjust the concentricity of the exciter rotor. The activation experiment of workshop battery was carried out. According to the device display

The maintenance cycle table has carried out many repairs on the governor, butterfly valve oil pressure device, air compressor, water pump, traveling crane and other equipment; Maintenance of secondary terminals and relays in the whole station; The spare guide shoes in stock were re-marked, cleaned and rusted. The safety passage between each iron gate and 35KV in the workshop has been rusted. Replace the switch insulating oil on the 10KV column in the second workshop before the rainy season.

2. The handcart isolation plug of the outlet switch of generator 2 in a workshop was burnt out.

3. Participate in the reconstruction project of 10KV manganese plant line, 10KV living area line and 10KV dam area line, and process a large number of fittings for them.

4. Replaced the excitation air switch of 2# and 3# generators in Workshop 2, and adjusted the brush holding position of 2# and 3# generators.

5. Adjust the transformer oil level and oil switch 13 times.

6. Overhaul Dongba 10KV flood control transformer and flood control standby transformer by hanging core.

7. Adjust the position of the fan control cabinet in the fan room.

8. Repair and replace the domestic water supervisor of the living quarters crossing the highway section.

9. Convenient small doors were installed in the second workshop.

10. Before winter comes, we cooperate with the office to repair the heating boiler pipeline.

1 1. Three iron gates were made and installed in the high voltage room and office of the substation.

12. As for the maintenance cost of the old building, the first workshop, the second workshop and the substation have processed four duty watches, a blackboard in the classroom and two bookshelves in the first workshop.

Second, the technical transformation of equipment

In order to improve the automatic operation level of equipment, reduce the labor intensity, and carry out technical transformation on energy-consuming equipment and equipment with hidden dangers on the premise of saving raw materials, the workshop put forward 25 rationalization suggestions, which were adopted by the station as 12.

1, improvement of spindle seal of No.2 machine in No.1 workshop. At the beginning of this year, based on the improvement of the main shaft seal of No.2 machine in 2004, the sealing device was improved and lubricating water was added, which has achieved good results so far.

2. Renovation of water pipes and drainage pipes of three machines in one workshop. The original three water-guiding cooling pipes leading to the collecting well are changed into the dual-purpose of collecting well and tail water. During normal operation, the cooling water is discharged into the tail water, the water inflow of the collecting well is greatly reduced, and the drainage of the collecting well is changed to self-flow, which greatly saves the auxiliary power and reduces the labor intensity of the operators.

3. Participated in feasibility analysis, preparation and operation of phase modulation of Unit 4. The phase modulation operation of No.4 generator opens up a new way to improve the power factor of Shitouhe power system.

4. Renovation of the control circuit of 3# governor oil pump in Workshop 1.

5. The accident signal circuit of each guide bearing on the side screen of Unit 2 in Workshop 1 is separated from the fault signal circuit.

6. The switch position and handcart position signals of the "Shi-bian" line in the first workshop are led to the analog circuit screen.

7. Automatically control and restore the main transformer fan in workshop 1, and add a second cooling fan.

8. Modification of secondary plug of oil switch on low voltage side of main transformer in workshop 1.

9. Modification of the connection mode of the guide end cover and oil slinger of No.2 and No.3 machines in No.2 workshop.

10 the neutral point of 3# generator in workshop 2 is equipped with automatic grounding device. When the 3# generator runs with the factory 400-volt bus, the device will automatically ground the neutral point of the 3# generator to ensure the working voltage of 220-volt electrical equipment.

Third, the learning situation of employees.

At the beginning of the year, the workshop made a detailed and feasible study plan, and each employee also made a personal study plan and goals to be achieved. For comrades who have participated in the maintenance for a short time, the relationship between mentoring and mentoring has been clarified, and the mentoring and mentoring should be arranged as much as possible to work together to create learning opportunities. Through unremitting efforts, four hydraulic engineers passed the welder's technical examination and obtained the welding certificate, and 1 electrician obtained the electrician operation certificate.

Maintenance work will continue to implement the "Maintenance Work Schedule", requiring each team to organize and learn relevant knowledge and discuss the maintenance plan together before the maintenance starts. After the maintenance work, each employee must summarize the maintenance work. Held technical seminars 10 times, collective study 19 times, technical questions and answers 12 times, and business assessment twice. Each employee's business study notes and ideological and political notes exceed 5000 words respectively.

Four. Carry out the "Excellence Evaluation" and "ankang cup" competitions.

In order to institutionalize and standardize all the work in the maintenance workshop, while paying close attention to the safety work, the workshop has improved the assessment method of "creating excellence and evaluating inferiority" and continued to implement the "sign-in system", basically putting an end to the phenomenon of being late for work and leaving early.

In the "ankang cup" competition, the workshop organized two collective inspections and found more than 20 defects. Participated in the security signature activity organized by 1 secondary station. For a whole year, I watched safety videos twice and learned lessons from two accidents. Organize 6 accident drills. Hold two motorcycle driver safety meetings.

In the activity of "creating excellence and evaluating difference", five people won the station prize.

Looking back on the past and looking forward to the future, the maintenance technology of maintenance personnel is constantly improving, and the awareness of loving their posts and dedication is constantly increasing. At the same time, the maintenance work can timely and objectively sum up the experience and lessons, so that our maintenance work will gradually become professional and standardized. In order to better accomplish our future work, we should guard against arrogance and rashness, unite and cooperate, and create greater glories in the new year.

Summary of Workshop Work Part III: Since the first half of _ _ _ _, under the correct and effective leadership of the company leaders and with the help of other brother units, our electromechanical maintenance workshop has paid close attention to safety production, constantly strengthened the self-construction of employees, improved their learning enthusiasm and innovation ability, and better served the company and production, laying a solid foundation for the company to build a safe and healthy mine. _ _ _ _ The work in the first half of the year and the work arrangement in the second half are summarized as follows: Work in the first half of the year

I. Work completion

1, safety in production, promotion of standards.

Safe production is the unity of safety and production, and its purpose is to promote production safely, and production must be safe. Doing a good job in safety and improving working conditions can arouse employees' enthusiasm for production; Can reduce the loss of labor; Reducing property losses can increase workshop income and undoubtedly promote the development of production; And production must be safe, because safety is the premise of production. Without safety, production cannot be carried out. In order to meet the quality standards and ensure safe production, the workshop has carried out a series of rectification. Each type of work has also been specially typeset, clearly pointing out the post responsibility system and operating procedures. The workshop is divided into two main workshops: one is the machining workshop, and the other is the mechanical riveting workshop.

2. Staff training and skills.

The long-term quality of the workforce and unremitting efforts to cultivate a workforce with both ability and political integrity have always been one of the priorities of the electromechanical maintenance workshop. To this end, the workshop always puts the training of employees in the first place and makes unremitting efforts. As early as the beginning of the year, the workshop made an annual employee training plan, striving to

Work methodically. In order to master the electrical knowledge, motor maintenance knowledge and lathe skills involved in the workshop as soon as possible, under the arrangement of the mine leaders, old masters were specially seconded from other brother units, and people were specially deployed to guide new workers in the workshop when they were busy. Three masters, Wang Lixin, Li and Li Shizi, were seconded from the First Electromechanical Team as apprentices. When processing large equipment, Master Zhang Hongbin was transferred from the workshop for technical guidance.

3, team building, strict supervision

In the practice of strengthening and improving the construction of security team, the workshop deeply realized that strengthening the management of three links before, during and after work is the basis of promoting the construction of security team. Pay close attention to the production tasks undertaken by the team before shift, pay special attention to safety precautions, implement the production tasks on duty, standardize the operation responsibilities of post types, make employees clear the tasks on duty and safety management requirements, and consciously do a good job in safety self-protection and standardized operation from the psychological state. At the same time, the monitor is responsible for the evaluation and investigation of the psychological safety status of the employees before the shift, so as to ensure that all the team members have a good safety lesson in the best mental state. In the class, give full play to the advantages of workshop leaders, strengthen on-site inspection, urge rectification, implement production tasks and safety management responsibilities to posts, promptly investigate potential safety hazards in each workplace and link, and effectively prevent unsafe production. After the work, the team leader is responsible for the acceptance and confirmation of the work. Implement the joint responsibility of "who operates, who is responsible, who checks and who implements" on site, and do not miss the problems and hidden dangers identified.

4. Repair the old and recycle the waste, and reduce the cost.

At the beginning of the year, the workshop responded to the company's call. On the one hand, the situation education and publicity have been strengthened, and the cost consciousness has been strengthened. On the other hand, actively guide all employees in the workshop to vigorously carry out the activities of repairing the old and recycling the waste according to the actual situation of the unit, and form a saving atmosphere of saving costs for everyone and saving everything, which has made positive contributions to the company's material saving. Through continuous efforts, all kinds of motors 109 were repaired in the first half of the year; 179 sets of various electrical switches; 54 maintenance pumps and 3 1 winch; Assemble 22 belt conveyors; Maintenance roller 8882 is suspended; In addition, it also cooperated with other units to process several parts; The workshop also put the work of turning waste into treasure into practice, recycling useful waste from the waste collection station and reusing it in the work. In the first half of the year, * * * saved a total of 6.5438+0.2 million yuan in material expenses, which contributed to the company's safe development.

5. Technological innovation ensures development.

If there is no innovation, the work will become a stagnant pool without any waves. Scientific and technological innovation is particularly important for people who repair all kinds of mechanical and electrical equipment. If we don't innovate and follow the old path, we can't keep up with the increasingly advanced science and technology, let alone develop. Since the first half of the year, our workshop has strengthened employees' technical innovation, extensively carried out job training and "five small" innovation activities, and guided employees to base themselves on their posts, use their brains diligently, produce more "golden ideas" and effectively apply them to their work. Column hydraulic press is the result of "five small" innovations. It is convenient and quick to use, which not only reduces the labor intensity of employees, but also greatly improves the work efficiency. In addition, the workshop also designed and manufactured wheel puller and lathe connecting plate. In the continuous innovation, the workshop has vitality, which can better serve all units of the company and jointly build our harmonious home.

Second, the problems existing in the work

1. It is also necessary to enhance employees' awareness of independent safety.

2, due to strong professionalism, it is necessary to strengthen the skills training and professional ethics of employees.

3. With the increase of various tasks, it is necessary to further strengthen team building and on-site supervision.

4. It is necessary to further strengthen economy and improve efficiency.

5. Employees' subjective initiative was not brought into full play, and scientific and technological innovation was encouraged.

In short, there were achievements and shortcomings in the first half of the year, joy and bitterness, but harvest was the theme. Although no earth-shattering events have been done, the significance of workers' work and the value of life are reflected in every little thing. In the future work, the mechanical and electrical maintenance workshop will keep in mind the "three noes and four haves", firmly adhere to the "three zeros" goal, continue to promote the "three basics, three grasps and one inspection", develop safely, strive for progress steadily, meet the quality standards, fully complete various production tasks, and make new contributions to the company's mine construction.

_ _ _ _ Work arrangements for the second half of the year

In order to make quality standardization reach a new level in the second half of _ _ _ _ _ _, our electromechanical maintenance workshop is a half-year with both opportunities and challenges. After analyzing the external environment and internal facts, the mechanical and electrical maintenance workshop made the following arrangements for the work in the second half of the year:

1, to ensure safety in production, according to the arrangement of the mine monthly work plan, do a good job of mechanical and electrical equipment maintenance in the second half of the year; Processing and manufacturing of all parts.

2. Continue to strengthen study and training, comprehensively improve the safety quality and technical quality of all employees, and establish a maintenance and processing team with high quality and high fighting capacity to meet the needs of modern mine construction.

3. Continue to improve the management mechanism and strengthen safety management. Strengthen basic management, improve organizational structure and responsibilities, improve emergency prevention and response capabilities, master necessary knowledge and skills, and improve the self-help and mutual rescue capabilities of workshop workers.

4, actively promote the workshop safety and quality standardization construction, do a good job of standardization, every time a job is completed, standardization will reach the standard, strictly implement the integrity standards of mechanical and electrical equipment, put an end to explosion, and ensure the integrity of equipment. For the processed parts, the equipment ensures that all technical indexes meet the requirements of drawings and production.

_ _ _ _ In the second half of the year, the workers in the machine shop will work harder. In the second half of this year, the electromechanical maintenance workshop will be refreshed and condensed into the company's team. * * * will meet greater challenges, and * * * will enjoy greater joy, because each of us is not just a monotonous note. Only when every note is tightly condensed together can it become a magnificent music and make its own music.

Three related articles are summarized in the Workshop Work Summary:

★ Personal summary of teaching in three rural areas in summer

★ ? Personal summary of ideology and politics

★ ? Six papers on college students' personal summary in the semester

★ ? Six annual personal summaries of lawyers

★ ? Annual Youth League Education Review Personal Summary

★ Model essay on summary of workshop maintenance work in factory

★ 4 short articles summarizing personal maintenance work.

★ There are 3 model articles summarizing the work in the production workshop.

★ Model essay on annual maintenance work summary

★ Fan Wenxuan's five workshop work summary reports.