When the work reaches a certain stage or comes to an end, it is necessary to go back and carefully analyze the work done by the research institute, affirm the achievements, find out the problems, sum up the experiences and lessons, raise awareness, make clear the direction, and express these in words, which is called work summary. The following is a three-point summary of the work on duty, please refer to it!
Summary of duty work 1 I study and implement relevant rules and regulations in combination with my own reality. By studying business knowledge hard, consulting modestly, strictly abiding by various operating procedures, integrating theoretical knowledge into practical work and successfully completing various tasks.
First, seriously study the instructions, documents and meeting minutes of superiors about safety production, keep abreast of the situation of safety production, observe the rules and discipline, and improve safety awareness. Take safety in production as the core, actively participate in the training with the theme of improving safety operation level and practical operation ability, learn from colleagues around you with an open mind, and quickly master the work requirements of the personnel on duty.
Second, the implementation of various rules and regulations, clear personnel on duty. Strictly implement the general policy of "uninterrupted, high-quality, economical and safe" operation and maintenance, improve safety awareness, and fundamentally put an end to human accidents such as misoperation. Arrive at the post on time, stick to the post during the duty, never leave the post without reason, and do a good job in equipment inspection and maintenance.
Third, actively participate in the safety meeting in Taiwan, carefully study the important instructions, briefings and notices about safety from superiors, and assist the squad leader to conduct safety self-inspection in combination with daily safety inspection and safety production month activities in summer, autumn and New Year's Day, and rectify the problems in time when found.
During the one-year work of the personnel on duty, I have a clearer understanding of radio and television wireless transmission through in-depth study of the operating rules and regulations of radio and television transmission, and have mastered the duties, daily inspections, operation records and general accident handling of the personnel on duty. I am determined to adhere to the premise of safe production in my future work, start from my own work and daily work, keep a bold and persistent style, start from me, start from the little things around me and persevere. Work hard on safety production, complete all tasks in a down-to-earth manner, and ensure safe broadcasting.
Summary of duty work 2 Since I took up my job, I have been constantly strengthening my self-cultivation and striving to improve my ideological and moral level.
Level, earnestly deepen the study of various cultures and professional knowledge, constantly explore new knowledge, forge ahead, actively carry out all work within the scope of intelligence, fully perform their duties, and play an exemplary role. Taking an active part in technical exchanges and scientific and technological innovation activities, Dida has done a good job of passing on, helping and leading, and fully completed various tasks and indicators assigned by superiors, which has played its due role in the company's production development. I will summarize my professional and technical work since I took office as follows:
First, consciously strengthen theoretical study and strive to improve personal quality.
Without a firm and true political direction, there will be no positive guiding ideology. In order to constantly improve their own politics
In the past few years, I have been very concerned about national affairs, concerned about the situation at home and abroad, analyzed the impact of changes in the situation on enterprises, and implemented this idea in the production process to ensure that I always keep consistent with the party and enterprises in my thoughts and actions. At the same time, I also bring this idea into my work and study, and constantly pursue my own progress. Some people say that if a person wants to become a talent, he must be a man first, which makes sense. In other words: if a person wants to succeed in his career, he must first learn how to be a man! Especially those who do our highly technical work, we should look at things attentively, concentrate on things and learn with an open mind. There is no room for carelessness and mistakes. First of all, we should have a correct working attitude, good professional quality, be serious and responsible for our work, obey the arrangement of leaders, listen to others' opinions and suggestions with an open mind, unite colleagues, be polite to others and serve warmly.
Second, correct working attitude and play a leading role.
Since I joined the company, I have been engaged in all electrical affairs, including safety and security during all capital construction periods.
Quality supervision and inspection. I am well aware of the importance of electrical management during construction, especially the electrical infrastructure and most of the invisible projects. It is necessary to supervise and inspect at any time, solve problems when found, and never rush into it, otherwise the future trouble will be endless and can never be eradicated. This is a test and responsibility for our electrical management. As the monitor of an electrician class, I am duty-bound to bear the responsibility and burden. So in my usual work, I not only ask my team members to be careful in supervision and inspection, but also know that it is necessary to be hard while the iron is hot. I made some strict demands on myself. First, when I encounter dirty, tired and dangerous work, I will walk in front of the workers and do more and more effectively than the workers. Second, when encountering technical difficulties, we should stand up and try our best to overcome them; I always insist on doing everything well and putting the interests of the company first. Including after the completion of the production process, sometimes it is a race against time to deal with large and small electrical equipment failures, winning valuable production time for the company and laying a solid foundation for the company's development. I think that since I want to take the test as a technician, I will be better than ordinary workers in many aspects such as business level. When the company assigns tasks, when it is difficult for ordinary workers to complete them, they should take the initiative and not shirk with the workers. They should bravely shoulder the heavy burden like technicians. Usually, I not only ask myself this way, but also do it according to these requirements in practice. So I want to play the role of a technician in the company and establish a good image of a technician.
Three. Safe production to ensure the safety and quality of the company's electricity consumption.
1. With the long-term operation and the increase of load, problems such as aging, measurement error and insufficient capacity are becoming increasingly prominent, resulting in serious resource loss (power loss) and security risks. At the beginning of the year, the center invested a lot of money to update the electricity meters in all the company's business stores (including relevant units in the company), and replaced and reformed the internal irregular lines. The renewal of electric meters began on April 4th, 2009/KLOC-0, and was completed on April 6th, 5438+08. Replace electricity
According to the capacity distribution of each store, the models of electric meters are: electronic single-phase DDS438 type 5-20A, 10-40A, 20-80A, and electronic three-phase four-wire electronic meter 20-80A. Total: 2,200; Assist the construction team to rectify 1572 indoor irregular lines.
2. Due to the rapid development of business households, the demand for electricity is increasing year by year, and the center has invested huge sums of money to ensure the power supply safety of power grid lines, trunk lines and indoor lines. In May, all groups of power lines were evaluated, and the overloaded lines were expanded: 50MM2 copper core cable was newly installed. Install more than 80 air conditioning lines during high temperature; Replace underground cables for four inclined cement poles in the market. Relieved the pressure of power supply line and passed the peak period of power consumption smoothly.
3. The power supply from West Power Distribution Room to Guanghua Footwear Base is a problem left over from history. On February 27 this year, the company's footwear base had a double-channel power supply reverse power transmission accident, which caused great security risks to the market power supply. The leaders of the center attached great importance to it, and the department timely replaced four DW 16-2000A intelligent circuit breakers in the east-west distribution room. Under the mediation of the three parties, the department arranged the electrician team to cooperate with the power supply company, and completed the power distribution project of the shoe base perfectly.
Fourth, implement the responsibility for production safety.
1, the company leaders put safety in production first, and the section chief of each morning meeting will give each member a high altitude before attending the work.
Maintain your own safety repeatedly. In particular, the section chief and Ye engineer of each production tool personally inspected and supervised, and the tools found to be seriously defective and damaged were destroyed in time, and no accidents such as personal injury, power grid, equipment and fire occurred throughout the year.
During the period from February to September, in order to ensure the safety and quality of electricity consumption during the peak period of high temperature, the company arranged for the east.
The West Transformer Room and the Box Transformer Room shall be assigned special personnel to be on duty, and the equipment failures shall be eliminated in time, and the equipment operation records shall be kept every hour to ensure the reliable operation of each circuit.
3. Conduct routine water and electricity inspection for the company and Guanghua Footwear Base every day, and handle the situation in time if found. Also cooperate with the company's monthly safety inspection. Timely rectification of matters with hidden dangers of hydropower.
4. Regularly check the planned power outage control system, street lamps and broadcast monitoring system every Friday, and make inspection records. More than 50 street lamps/kloc-0 were replaced this year. If any abnormal situation is found, it should be adjusted at any time and reported to the company leaders in time.
5. Before each typhoon comes, conduct a comprehensive inspection on the internal power supply network, light poles and cables, outdoor billboards, electric shutter doors and drainage pipes. In order to plan ahead.
Fourth, fully cooperate with equipment maintenance and strengthen equipment maintenance.
Combined with the opportunity of low power consumption, overcoming difficulties and diverting power, all equipment was overhauled, pre-checked and eliminated in turn in mid-June165438+1October. The equipment maintenance of the East-West Power Distribution Room cooperated closely with the construction personnel, and completed the switching operation, safety measures arrangement and on-site safety supervision and management of the power transmission equipment. During the maintenance, oil leakage and discharge of the high-voltage cable in the west distribution room were found in time, and the original 70MM2 copper-core high-voltage cable was replaced with 120MM2 copper-core high-voltage cable. Replace 2 sets of disconnectors (2000a), 3 sets of DW 15 circuit breakers (630a), 44 self-healing capacitors and 5 sporadic accessories in the east-west distribution room. At the same time, the base, pull rod and box surface of some corrosion equipment in high pressure chamber were treated with anticorrosion. Operation of single equipment, power switching, cleaning and maintenance, and equipment acceptance after maintenance.
Five, do a good job in the work of the whole group, the establishment of water and electricity, radio, monitoring files.
1. This year, the electric meter will be replaced, the data of the electric meter will be improved, the construction records of the electric meter update will be kept, and the old meters removed will be marked and put into storage according to each household in the group. List the electricity consumption reading of the old electric meter and the meter number and capacity of the new electric meter.
2. Make a monthly report on the planned water consumption of the company 13 water meter (now 10) and send it to the Municipal Water Saving Office; Dongxipei
Power room, interval transformer active and reactive power meter copy, each data registration archive.
3, completes the power supply equipment maintenance, annual inspection report. Establish a special account for major equipment, and record the maintenance items, models and quantities of replaced equipment and materials, and the operation of the equipment after maintenance.
4. Manage the electrician warehouse. Regularly declare the material consumption and list the materials in and out of the warehouse, ensure a certain inventory of commonly used spare parts, and register the materials in the place of use.
Six, strengthen business learning, improve the technical level.
It's never too old to learn this sentence is my motto. Today, with the continuous development of science and technology, you will fall behind if you don't study for a day. Especially electrical automation, no one can fully grasp everything. It is constantly developing and updating, just like computer software, it is updated every day and has been developing. Maybe you knew it yesterday, but it will be different in two days, and more advanced things will be put in. So I usually read more professional books as long as I have time. Over the past few years, I have collected a large number of new professional books and materials, constantly enriching myself and constantly mastering new knowledge. For example, electrical design and drawing, electronic technology, modern frequency conversion technology, DC application in industry and so on. In the process of learning this knowledge, I learned a lot of new knowledge, such as PLC programming control principle, ABB inverter setting and control principle, SIPMOS high-power bidirectional thyristor control principle and so on, which really benefited me a lot! Not only did I broaden my knowledge, but also greatly improved my technical level, which also made me interested in learning higher-level theoretical and technical knowledge.
Summary of duty work 3 I. Overall work of the school
This week, due to Tomb-Sweeping Day's one-day holiday, the actual working day was four days, and two classes were held on Thursday and Friday, which brought a sense of repetition to some teachers' work. Fortunately, going to work in two sections before and after the festival also dispelled some discomfort, and the school as a whole was in good working condition. This week's key work mainly includes the following aspects:
1. The Academic Affairs Office has completed the collection of senior high school entrance examination information and submitted it.
2. The intensive training of the physical education and scientific experimental operation examination for the senior high school entrance examination is in full swing, and the teachers and class teachers of all subjects cooperate with each other to strive for the best results.
3. This year, the collective selection of advanced classes at the city and county levels was successfully completed, and the list of outstanding students commended at the city and county levels has been determined and reported to the Basic Education Section of the County Education Bureau.
4. Vigorously promote teachers to carry out research projects and cultivate scientific research talents in schools, draft school incentive plans, lead teachers' professional development, and build a team of famous teachers in xx middle schools.
5. Strengthen the education of students' behavior habits, focus on the special rectification activities of "prohibiting students' snacks from entering the teaching area", ensure students' food safety, strengthen the management of administrative duty personnel on campus public places, strengthen the management of class teachers on the interior of the classroom, and implement the comprehensive management of "no outside and no inside".
6. The General Affairs Department will carry out campus environmental improvement activities, clean up the building dregs on the top of the old teaching building, dredge waterways, prevent water leakage, remove weeds on campus and mow the lawn.
7, security office to carry out a comprehensive investigation of campus security risks, administrative staff full participation, division of labor and cooperation, in-depth inspection in groups, forming written materials, security risks to implement the responsible person, rectification within a time limit, the school can not solve the major security risks written report step by step for the record.
8, the full implementation of the school livelihood project, the establishment of organizations, division of responsibilities for the corresponding tasks, the formation of special work "road map" and timetable, summarized by the office for the school livelihood project implementation plan.
9. Organize some class teachers to participate in the "Anqing Primary and Secondary School Class Teachers' Work and Middle School Students' Career Planning Seminar" arranged by the Municipal Education Bureau this weekend, and accept the award of "Primary School for Class Teachers' Work Innovation Research" awarded by the Teaching and Research Section of the Municipal Education Bureau.
10, other routine work is carefully prepared and carried out in an orderly manner.
This week, the overall work of the school needs to be improved in the following aspects: First, the functional departments do not think systematically about the block work, and the research is not deep enough to find problems; Second, some class teachers do not have enough on-site management of student activities; Third, the administrative division of labor is slow and inefficient, and the management of transactional work is improper, and it is not handled according to "priorities"; Fourth, how to manage students in an orderly and educational way? Insufficient ideological and methodological preparation, need to think deeply, properly solve, nip in the bud.
Second, the safety work
This week, the overall security situation of the school is good. In addition to daily management, the main worksheet now includes the following aspects:
1. Implement the normalization requirement of closing the school gate on sunny days, and reiterate at the faculty meeting on April 5 that safety work is an important topic of this meeting, emphasizing the relevant requirements of earthquake prevention and disaster relief.
2. The staff on duty and some administrative personnel were able to coordinate and cooperate, and stopped an incident in which foreign youths came to the school at noon on April 5 in time, and asked the police of the town police station to go to the school for proper handling. However, the student management personnel should attach great importance to this matter, and they should do a good job of prevention (the education of the class teacher, the timely response of the personnel on duty, and the security officer on duty).
3. This week, the education of students' food safety and good eating habits was strengthened through the rectification activity of "prohibiting students' snacks from entering the teaching area". However, there are still students' snack bags scattered in public places on campus, which can be seen in the trash can in class, which shows that it is not completely prohibited. It is required to implement both "rule of law" and "rule of virtue" in student management. While putting forward strict requirements, it is more important to be rational. All student administrators should also fully realize the significance of this work and the necessity of joint management.
4. This week, "Re-implementation of School Safety Work" has been launched. Administrative personnel comprehensively investigate the hidden dangers of campus safety and the construction of safety materials, determine the responsible person and make rectification within a time limit, and clean up the workers arranged on the roof of the old teaching building to prevent water leakage from endangering the safety of the building.
5. Make full use of the assembly time of practice between classes to educate students about safety, focusing on the safety requirements of students in discipline, diet, transportation and drowning prevention.
This week, school safety needs to be strengthened: first, chasing and shoving students in the corridor between classes is easy to fall; Second, students are crowded by car, because the problem of vehicle capacity cannot be solved; Third, students' snacks and cold drinks after school will bring security risks; Fourth, the last class in the last afternoon, the teacher can't make a safe one-minute reminder before school. As for the serious security risks caused by the suspension of school infrastructure construction, this cannot be solved by the school itself, and it is only up to the school staff to strengthen education and supervision.
;