Multiple choice questions (40) 1 each question, with a total score of 40 points.
(1) stone with splicing area less than (B )m2 for decoration.
A: 0.0 1 b: 0.0 15.
C: 0.02 d: 0.05
(2) GRC cornice line, the following statement is wrong (C).
Answer: GRC cornice quota is only applicable to the site installation of the construction unit. If the installation fee is included in the GRC component price, it is directly included in the direct fee, and the quota is not applicable.
The steel skeleton and bolts in C:C:GRC cornice quota are not allowed to be adjusted when the quantity is different from the actual situation. D:D:GRC cornice line has no steel skeleton, and 60% of the labor cost is deducted from the installation material cost and mechanical cost of steel skeleton.
(3) Vertical transportation of decoration quota is calculated according to (c).
A: According to the construction area of the unit project B: According to the labor cost of the unit project.
C: Different vertical transportation heights (cornice height of single-story building) are calculated according to fixed working days respectively. D: Different vertical transportation heights (cornice height of single-story building) are calculated according to the sum of labor cost and machinery cost respectively.
(4) The anti-skid strips of stairs and steps shall be calculated according to (c).
A: step width b: the distance between the two ends of the step is reduced by 250 mm.
C: the distance between the two ends of the step is reduced by 300mm D: the distance between the two ends of the step is reduced by 500 mm..
(5) Stairs and steps shall be calculated by subtracting (d) from the distance at both ends of the steps.
A:150mm b: 200mm
C:250 mm D:300 mm
(6) Mechanical excavation of wet soil shall be multiplied by the coefficient (b).
A: 1. 10 b: 1. 15
C: 1. 18 d: 1.2
(7) Exterior wall is insulated and pasted with extruded board, and the benzene thickness is different from that in the specification (d).
A: insulation board content multiplied by 1. 1 coefficient b: all artificial materials can be adjusted.
C: the fixed base price is multiplied by the corresponding coefficient D: the content of insulation board can be converted.
(8) Backhoe excavator is used to dig common soil at the bottom of the pit in the valuation quota of construction projects, and the slope coefficient is calculated according to (b).
A: 0. 15 b: 0.29
C:0.3 mm D:0.5 mm
(9) The preparation object of the construction drawing budget is (c).
A: single project b: divisional project
C: Unit Project D: Project A.
(10) The quantity of comprehensive scaffolding in our province is calculated according to (a).
A: building area b: horizontal projection area
C: according to the enclosed area of the external wall D: calculated separately according to the relevant provisions of the quota.
(1 1) The sand mixture ratio in the quota is compiled according to (a).
A: dry state b: natural water content state
C: saturated water content state D: 18% water content
(12) The height of a multi-storey building refers to (b).
A: clear height b: the height from this floor to the upper floor.
C: the height of the building d: the height.
(13) The engineering quantity of plastic downpipe shall be calculated according to (a).
A: length b: section
C: Deputy D: Duan
(14) When the ceiling height of the full-house scaffold exceeds 5.2m, every additional layer (b) is regarded as an additional layer.
A: 0.6m B:1.2m.
C:1.0m Ding: 3.6m.
(15) Quota the quantity of stair concrete, calculated according to (a).
A: the horizontal projection area of the staircase part (including the middle rest platform) B: the horizontal projection area of the whole staircase.
C: horizontal projection area of steps D: horizontal projection area
(16) means (b) the number of extruded boards and benzene boards pasted on the external wall does not conform to the calculation rules.
A: Calculated in square meters according to the design graphic size B: Calculated in cubic meters according to the design graphic size.
C: Deduct the area occupied by the openings of doors and windows. D: The side wall of the window should be calculated separately.
(17) The method for calculating the center line of the external wall with the external line of the external wall is (a)
A:Lwz =Lww- outer wall thickness B:Lwz =Lww- 4× outer wall thickness.
C:Lwz =Lww- 2× external wall thickness D:Lwz =Lww- 8× external wall thickness.
(18) The calculation length of engineering quantity of ring beam of external wall foundation is calculated according to (b).
A: the outer line of the outer wall b: the center line of the outer wall.
C: external wall axis D: long and clear internal wall.
(19) When calculating the quantities of brick walls, the volume occupied by (c) is not deducted.
A: door and window openings b: inner wallboard head
C: external wall plate head D: concrete column embedded in the wall.
(20) The production, binding and installation of stirrups shall be made of round steel. In the actual use of reinforcement, the artificial and mechanical multiplication coefficient (D).
A: 1.02 b: 1.045
C: 1.06 d: 1. 1
(2 1) In the scaffold comprehensive quota, (d) has been considered and will not be calculated separately.
A: the vertical protective frame of the building B: the construction ramp
C: horizontal protective frame of building D: scaffolding for external wall decoration.
(22) The calculation length of the quantity of the moistureproof layer of the external wall foundation shall be calculated according to (a).
A: the outer line of the outer wall b: the center line of the outer wall.
C: external wall axis D: long and clear internal wall.
(23) When the ceiling height of the full-house scaffold exceeds (a), the additional layer fee shall be calculated.
A: 5.2 meters B: 3.6 meters
C: 1.0 Metre: 0.6 m.
(24) Regarding the slope coefficient of excavation, the following statement is wrong (B).
Answer: The groove is calculated according to the slope coefficient of the construction organization design or construction scheme approved by the unit project. B: The groove is not calculated according to the actual slope, and the constant slope coefficient is adopted.
C: Large excavation is calculated according to the slope coefficient of the construction organization design or construction scheme approved by the unit project. D: If there is no agreement on slope release for large excavation, the slope release coefficient can be calculated according to the quota.
(25) When the height of the comprehensive scaffold building exceeds 6m, every additional layer (c) is regarded as an additional layer.
A: 0.6m B:1.8m.
C: 1.0 meter: 1.2 meter
(26) What is the composition of the unit project? The following statement is true ()
A: single project b: sectional project
C: Division Project D: Construction Project
(27) The building area can be calculated according to the natural layer (d).
A: pipe well pier b: outdoor stairs
C: terrace d: elevator room
(28) The calculation length of internal wall foundation masonry quantity is calculated according to (c).
A: net length of interior wall foundation groove b: net length of interior wall foundation
C: net length of interior wall D: centerline of exterior wall
(29) Cast-in-place reinforced concrete ring beam and lintel shall be calculated according to (d).
A: ring beam b: press special-shaped beam
C: Calculated by single beam D: ring beam and lintel respectively.
(30) For concrete with columns, beams and awnings, the quantities shall be calculated according to (d).
A: Pick out the horizontal projection area outside the wall B: According to the horizontal projection area of the outer edge of the beam.
C: the actual horizontal area of concrete pouring D: the sum of the volumes of beams and slabs (including beams in walls), in cubic meters.
(3 1) (B) is not included in the quota consumption of coiled material roof.
A: brush cold primer b: additional layer
C: expansion joint d: joint
(32) Single-storey buildings with eaves height within (b) shall not calculate the machine-shift fee of vertical transportation machinery.
A: 3.2 meters B: 3.6 meters
C: 5.6m Ding: 6.0m.
(33) The total height of a single-storey industrial workshop is five floors of an ordinary house. The corner area of the external wall is 152 1.6 m2, and the horizontal area of the structure above the corner of the external wall is1519.2m2.. There are some two-story office buildings, and the horizontal area of the external wall of each floor is 300 m2. Its construction area should be (d).
A: 152 1.6 m2 b: 15 19.2 m2.
C: 18 19.2 m2 D: 21210.6 m2.
(34) carport, carport, platform, gas station, toll station, etc. There is a permanent roof and no enclosure structure, (c) construction area.
A: calculate the area enclosed by the outer contour of the column B: the horizontal projection area of the top cover.
C: calculated as 1/2 of the horizontal projection area of the top cover; D: not really.
(35) The additional layer of the comprehensive support takes (b) as the additional layer.
A:0.6m B: 1m
C: 2m Ding:1.2m.
(36) According to the Cost Quota of Construction Projects in Heilongjiang Province (20 10), the basic salary refers to the basic salary paid to (d).
A: Manager B: Koster.
C: Driver D: Production worker.
(37) According to the Cost Quota for Construction Projects in Heilongjiang Province (20 10), the contractor shall hold (b) obtained in accordance with the law, undertake the project within the business scope permitted by his qualification level, and calculate all expenses according to the standards specified in this cost quota. The text number of the current construction contract in Heilongjiang Province is.
A: Business License B: Qualification Certificate
C: Code Certificate D: Construction Permit
(38) According to the Construction Engineering Cost Quota of Heilongjiang Province (20 10), the regular repair cost refers to all levels (D) and temporary troubleshooting cost of construction machinery except overhaul.
A: maintenance b: maintenance
C: maintenance d: maintenance
(39) () is a clause drawn up by the parties in advance for reuse, and they did not negotiate with each other when concluding the contract.
A: model contract text b: agreement
C: format clause d: contract confirmation
(40) If the tenderee adopts the method of inviting tenders, it shall issue an invitation to bid to the above-mentioned designated legal person or other organization ().
Two B: Three.
C: Four Ding: Five Ding.
Multiple-choice questions (20) have 2 points for each question, totaling 40 points.
(1) plastering area of interior wall (dado), the following statement is correct ().
Answer: The area occupied by openings, empty rings and holes of doors and windows outside 0.3m2 should be deducted. B: The area occupied by skirting board, mirror hanging line, 0.3m2 inner hole, and the junction of wall and components will not be deducted.
C: Deduct the skirting board, the mirror hanging line, the area of the hole within 0.3m2 and the junction between the wall and the component D: The side wall and the top surface of the hole will not be increased (when doors and windows are opened, the width of the side wall and the top surface should be increased if it exceeds 120mm).
E: the side wall areas of battlements and chimneys with walls are included in the wall plastering calculation f;
g:
(2) The following items belong to sporadic items of wall hanging materials ().
A: Tank B: Window sill
C: Side wall of doors and windows D: step side (side height ≤ 1.5m)
E: flat balcony railing f:
g:
(3) According to the decoration quota, the following statement is correct ().
A: The quota of stone processing and glass processing is only applicable to the processing on the construction site. B: The inverted 45o angle quota of wall masonry is only applicable to the construction site processing.
C: If the installation cost is included in the price of finished doors and windows, it will be directly included in the direct cost, and the door and window installation project will not be taken. D:GRC cornice quota is only applicable to the site installation of the construction unit. If the installation cost is included in the price of GRC components, it is directly included in the direct cost, and the quota is not applicable.
E: The vertical transportation quota is only applicable to the decoration works carried out separately. Female:
g:
(4) About steel bar connection, the following statement is correct ().
A: When electroslag pressure welding is used to connect steel bar joints, the joint cost shall be calculated separately, and the number of lap joints shall not be calculated. B: When the steel bar joints are welded, the corresponding connection quota items shall be implemented according to the number of steel bars shown in the figure, and the number of steel bars in the overlapping part shall be calculated as 2.5%, which shall be incorporated into the engineering quantity.
C: When the welded joints of steel bars are connected, the corresponding connection quota items shall be implemented according to the number of steel bars shown in the figure, and the number of steel bars in the overlapping part of steel bars has been included in the quota items, so it is not calculated. D: When the rebar joints are connected by binding, it is impossible to calculate the number of rebar joints for concrete members (except negative moment rebar and stirrup), and the rebar overlap can be calculated as 2.5% and incorporated into the rebar quantity.
English: France:
g:
(5) When calculating the quantities of brick walls, which of the following items are not calculated separately ()?
A: Waist line above three skin bricks B: coping line.
C: door and window cover d: window sill turn around.
English: France:
g:
(6) the quota list consists of ().
A: quota number b: project name
C: unit price d: consumption
English: France:
g:
(7) The chapters on doors and wood structures in the valuation quota of construction projects can be converted into ().
Answer: When the amount of steel skeleton at the entrance of the factory warehouse is different from the design, it should be adjusted according to the design. B: When the filling materials in thermal insulation door are different from the quota, they can be converted.
C: When the quality of iron parts in the wooden frame quota is different from the design, it can be converted. D: The thickness of the roof panel of the wooden roof is calculated according to the wool. If the design is different, the board can be converted.
English: France:
g:
(8) The calculation rules of "Valuation Quota of Building Engineering" include that the foundation has a cushion, and there is a wrong expression when calculating the depth of mechanical excavation ().
A: According to the actual excavation elevation B: Calculate to the bottom elevation of cushion.
C: design bottom elevation d: calculated to the bottom elevation of foundation.
English: France:
g:
(9) The cost of using ready-mixed concrete in construction is directly listed as the material cost, which should include ().
A: centralized mixing station fee b: ex-factory price of ready-mixed concrete
C: Off-site transportation fee D: additives (impermeability and antifreeze)
English: France:
g:
(10) Which of the following expenses belong to other project expenses priced by bill of quantities ()?
A: Project cost of measures B: Provisional amount
C: daywork d: general contracting service fee
English: France:
g:
(1 1) The horizontal transportation distance of concrete pumping is composed of ().
A: the distance from the center of the concrete pump to the external wall of the building. B: the distance from the center of the concrete pump to the vertical fixed center of the pumping pipeline of the building (structure).
C: the horizontal length of the long side of the concrete pumping area of the building (structure) (according to the approved construction plan and relevant materials). D: The horizontal length of the long and short sides of concrete pumping for buildings (structures) (according to the approved construction plan and relevant data).
English: France:
g:
(12) When digging, the correct term for digging between piles is ().
A: It is suitable for pile groups. B: It is suitable for multi-pile caps.
C: It is applicable to all pile foundation projects D: It is applicable to pile cap beam projects.
English: France:
g:
(13) The main items of the metal structure manufacturing project are ().
A: steel roof truss and steel grid B: steel support and steel purlin.
C: steel truss and steel wall frame D: steel crane beam and steel crane track.
English: France:
g:
(14) () should be considered when calculating earthwork slope in "Valuation Quota of Building Engineering".
A: soil type b: manual excavation or mechanical excavation.
C: mechanical operation position d: soil quantity
English: France:
g:
(15) The correct expression of the concept of bill of quantities is ().
A: The bill of quantities is a detailed list including the engineering quantity. B: The bill of quantities also includes the corresponding unit price of quantities.
C: The bill of quantities also includes expenses D: The bill of quantities is the total cost of the project.
English: France:
g:
(16) There are () projects whose quantities are calculated by m3.
A: number of reinforced concrete strip foundations b: number of reinforced concrete columns
C: The number of tie bars for brick masonry is D: the number of reinforced concrete piles.
English: France:
g:
(17) Digging warm soil under frozen soil shall be calculated according to the following provisions ().
Answer: Digging depth and slope coefficient: This part of digging is not limited by quota. B: The excavation width under the foundation shall be carried out according to the quota.
C: The excavation width of the upper mouth of the foundation is calculated according to the width of the lower mouth of the excavated frozen soil. D: Digging depth: calculated according to the actual digging depth.
English: France:
g:
(18) According to the Cost Quota of Construction Projects in Heilongjiang Province (20 10), the salary of managers refers to () of managers.
A: basic salary b: salary subsidy
C: auxiliary salary d: employee welfare expenses
E: labor protection fee for production workers f:
g:
(19) According to the Construction Engineering Cost Quota of Heilongjiang Province (20 10), the night construction cost refers to the normal operation () and lighting electricity cost according to the specifications and procedures.
A: Night shift subsidy B: Night construction reduces efficiency
C: amortization of lighting equipment for night construction D: overtime pay
E: labor protection fee for production workers f:
g:
(20) the role of contract in the market economy ().
A: Develop and improve the market economy B: Promote enterprises to strengthen accounting and improve management.
C: Realizing specialization and cooperation and Promoting National Economic Development D: Ensuring the interests of all parties in the market.
E: promoting the construction of market legal system;
g:
True or false (20) 65438+ 0 for each question, a total of 20 points.
(1) The canopy whose surface layer is at the same elevation is a plane canopy, and the canopy whose surface layer is not at the same elevation is a degraded canopy. ( )
No matter how
(2) Stairs do not include skirting board, side and bottom plastering, and steps do not include edges and sides, which shall be calculated according to the corresponding quota. ( )
No matter how
(3) The height of the cement mortar skirting line shall be compiled according to 150 mm, and the materials can be adjusted at different heights, with the labor and machinery unchanged. No matter whether you kick openly or secretly, you must play according to the quota. ( )
No matter how
(4) In actual construction, no matter whether the double-cone reverse 350L concrete mixer or 500L concrete mixer is used, it shall be calculated according to the quota and shall not be adjusted. ( )
No matter how
(5) Engineering construction project procedures, and the economic documents prepared in the construction drawing design stage are the construction drawing budget. ( )
No matter how
(6) The construction project valuation quota lists the one-time amortization amount according to different construction methods and different materials. ( )
No matter how
(7) The length of waterproof and moistureproof layer and external wall of building wall foundation is calculated according to the center line, and the number of internal walls is calculated according to the net length. ( )
No matter how
(8) The "within" in the quota includes this number. ( )
No matter how
(9) The quantities of coiled material roofing shall not be deducted from the area occupied by chimneys on the house. ( )
No matter how
(10) The economic document compiled in the feasibility study stage of the procedure and proposal of the engineering construction project is an investment estimate. ( )
No matter how
(1 1) Structure scaffold height: from the designed outdoor terrace to the top elevation. ( )
No matter how
(12) The economic document prepared in the design stage of the construction drawing is the design budget estimate. ( )
No matter how
(13) If the height of the single-storey building is 2.20m or more, it shall be calculated according to the total area. ( )
No matter how
(14) On-site vibrating maintenance fee is calculated for ready-mixed concrete, but not for now-mixed pumped concrete. ( )
No matter how
(15) The unit project refers to the project that can't bring benefits into play after completion. ( )
No matter how
(16) ceiling plastering benzene board carries out the quota project of wall plastering benzene board, and the artificial multiplication coefficient is 1.25. ( )
No matter how
(17) The plate head and beam head extending into the masonry are combined into the plate volume for calculation. ( )
No matter how
(18) The Cost Quota for Construction Projects in Heilongjiang Province (20 10) stipulates that the direct cost consists of direct engineering cost and fixed measures cost. ( )
No matter how
(19) Heilongjiang Province Construction Engineering Cost Quota (20 10) stipulates that the depreciation expense of construction machinery refers to the time value of funds purchased by construction machinery within the specified service life. ( )
No matter how
(20) If the completion date agreed in the agreement or the extended time limit agreed by the engineer cannot be completed due to the reasons of the contractor, the contractor shall be liable for breach of contract. ( )
No matter how