Exit E (that is, the exit of Everbright Road Mayflower Square) is relatively close to Beijing Road and diagonally opposite to Mayflower Square.
Extended data
Guangzhou Metro is the urban rail transit system of Guangzhou, the third largest city in Chinese mainland, and is one of the members of Comet 14. On June 28th, the first line was opened, 1997, and Guangzhou became the fourth city in Chinese mainland to operate the subway.
By April 26th, 20 18, Guangzhou Metro had three lines 13, with a total length of 39 1.6km and 207 stations, with the operating mileage ranking third in China and fourth in the world. By July 24, 20 18, the whole network of Guangzhou Metro had safely transported passengers. The daily maximum passenger flow is 1.00257 million, of which 1 line, line 2, line 3 and line 5 all exceed 1.2 million. In addition, the passenger flow of Line 3 (including the northern extension) is 2.44 million, Line 4 is 508,000, Line 61053,000 and Guangzhou-Foshan Line is 400,000, all of which are the highest in history. The reliability of operation service ranks first, the incidence of station crime is the lowest for three consecutive years, and the utilization rate of transportation capacity and the punctuality rate of driving rank third.
Official website information of Guangzhou Metro in September 20 18 shows that there are 15 lines under construction. They are the east extension of Line 3, the east extension of Line 5, the second phase of Line 7, the west extension of Line 7, the north extension of Line 8, 1 1 line, 13 line, 13 line, 14 line,/kloc-. ?
Guangzhou Metro Network is operated and managed by Guangzhou Metro Corporation, and it is also the actual construction and operator of Guangfo Metro, so the service scope of Guangzhou Metro also extends to Foshan.
References:
Guangzhou Metro-Baidu Encyclopedia