Nowadays, letters of guarantee are not uncommon in our life. A letter of guarantee is generally a bill issued by an individual or unit to a superior organization or collective under the condition of guarantee. Let's refer to how the guarantee is written. The following is the safety operation guarantee I have compiled for you, hoping to help you.

Guarantee letter for safe operation 1 1, compilation basis

1. 1 electric power construction safety work regulations dl5009+0-20xx;

1.2 Construction drawing of Huaneng Daqing 4000m2 cooling tower and staircase building project; 1.3 Approve the construction organization design of cooling tower;

1.4 approved work instruction for cooling tower wall construction. 1.5 national safety and health regulations.

2. It is required that the aerial work personnel, aged 18 to 50 years old, have passed the three-level safety education examination, have no hypertension after physical examination, and have normal heart rate, which is in line with aerial work.

3, the construction steps

Dismantle the addition and subtraction line-remove the tripod connecting crossbar-remove the tripod supporting rod-remove the tripod-remove the template-install the template-install the tripod-install the connecting rod-install the supporting rod-install the addition and subtraction line-remove and install the safety fence-release the bottom safety net-hang the upper hanging basket-hang the upper hanging basket springboard-pull up the safety net-hang the bottom safety net. Repeat the homework.

4. Mode of operation

4. 1 When the mold returns from the inside out, it is a group of four people. Remove and install tripods and templates in four groups clockwise or counterclockwise from four working faces.

4.2 Before dismantling and installing tripods and templates, the operators on the platform should hang their safety belts on the steel bars of the wall next to them, and open the platform walking board at a position that does not affect the operation; One end of the two walking ropes is fixed with an iron hook, and the other end is tied to the upper stable.

4.3 The lower operator goes down to the hanging basket working face at the bottom along the wall template through the open walking platform, and hangs the safety belt on the small cross beam at the upper part of the hanging basket.

4.4 The operator below takes two iron hooks from one end of the walking rope, hangs them on the flat bar of the tripod, removes the fixing bolts of the tripod, lifts the tripod from the opening of the platform to the platform above, and stands against the safety guardrail of the platform to make it stable; Then put down the walking rope and hang it on the reserved hole of the template; The bottom operator began to loosen the template, and the upper operator lifted the template to the top and leaned against the triangle. Repeat the homework.

4.5 When removing the connecting rod and supporting rod, the operator's safety belt should be hung on the tripod. The removed connecting rod, supporting rod, positive and negative wires are transmitted to the upper cooperation operator through the reserved opening of the platform, and the upper operator hangs the safety belt on the steel bar on the cylinder wall behind him.

4.6 When returning to the safety fence and safety net, the operator's safety belt shall be hung on the first tripod, and the upper operator shall hook the sideline of the safety net with a steel hook, and the lower operator shall cooperate with it.

4.7 Before returning to the hanging basket, the operator shall stand at both ends of the hanging basket, hang the safety belt on the upper tripod, loosen the safety net at the bottom, take out the first empty springboard, dismantle the hanging basket and hang it to the next floor. The operator on one side of the springboard stands on the upper hanging basket and hangs it on the upper tripod, and hangs the bottom safety net after returning from the upper safety net. Repeat the homework.

5, safety protection measures

5. 1 In order to ensure the safety of the operators on the upper platform and prevent falling from high places, a round steel column with a height of 10~ 15mm is welded at the outer end of each tripod flat steel on the upper platform as the fixing point of the safety protective railing with a mounting height of 120mm, and three iron ring fixing chains are welded on one side of each column.

5.2 In order to ensure the safety of workers in the process of formwork removal and installation, a bottom safety net is hung 30mm from the outer end of the upper platform to the inside of the hanging basket. The bottom of the outer basket is closely connected with the cylinder wall, and the inner basket is hung at the root of the flat bar of the tripod, keeping the minimum distance from the cylinder wall.

5.3 Operators working inside and outside the hanging basket should hang their safety belts on the hanging basket. When moving forward to the middle of two hanging baskets, after standing firm, turn around and take off the seat belt hook, change hands and hang the seat belt on the hanging basket in the forward direction, continue to move forward and repeat the action.

5.4 After every formwork withdrawal, formwork removal and installation, the safety fence should be repaired and replaced immediately after routine inspection. If the safety net is damaged, the hole should be repaired and mended immediately.

Guarantee of safe operation. The shareholders' meeting does not discuss major actions of the enterprise; No enterprise has formed new arrears on social insurance such as employee pension and medical care; No enterprise does not give benefits to employees on major festivals; There is no enterprise that does not offer condolences to employees who are ill and hospitalized; There is not a business that is not in employees' homes. When there are important activities, the main leaders do not come to the door to express their condolences.

(3) The urgent needs of some employees have been solved: the public commitment of "doing practical things, doing good things and solving difficult problems" for employees has been concretized, which has greatly mobilized the enthusiasm of the branch team and party member cadres to serve employees. The most important sign of success is: employees who have admitted their children to key universities have already handled various student financial assistance; A total of units have increased the welfare benefits of employees; Some units have made it a system to maintain a good working and living environment for their employees.

(d) Stimulated the motivation of tapping potential and increasing efficiency: some specific contents of public commitments need economic backing, prompting most units to make great efforts to tap potential, find projects and solidly promote project implementation. Its most remarkable achievements are as follows: last year, the whole system set up three projects in five categories, with an annual increase of X million yuan, and was rated as "advanced enterprise in project activities" by the operating company; There are X more projects this year, and it is estimated that the new benefits will be X million yuan each year.

(V) Promoting the improvement of the team's combat effectiveness: Public commitment has greatly promoted the Party branch and party member cadres to demand themselves according to the principle of "stressing party spirit, morality and setting an example", and greatly promoted the improvement of the combat effectiveness of the grassroots branch team. Its most prominent sign is that in the "three comments", many branches were put forward more or less in previous years, but this year there is only "hope".

Fifth, the biggest experience

Through public commitment, we have gained a lot of experience, but the biggest experience is that as long as we can fundamentally mobilize cadres and workers to pay maximum attention to any activity, we can not only carry out the activity vividly, but also make the effect of the activity more solid to the maximum extent.

The third guarantee of safe operation is to strengthen mechanical safety management, eliminate hidden dangers from the source, control and reduce the occurrence of mechanical safety accidents, and improve the quality of mechanical operation. The operator (hereinafter referred to as Party B) must promise to the Project Department (hereinafter referred to as Party A) to abide by the following provisions:

1, all kinds of cranes should be equipped with mechanical performance indicators, limiters, load controllers, interlocking switches, etc. The track crane shall be equipped with walking limiter and track clamp. Before use, check the trial crane and go through the visa formalities.

2, the steel wire on the drum must be neatly arranged, the tail has a card, at least three times in the work.

3. When lifting two or more machines, there must be unified command, coordinated actions and reasonable distribution of lifting weight, and the lifting weight shall not exceed 80% of the allowable lifting weight of a single machine.

4, listen to the commander's signal in the operation, the signal is unknown or may cause an accident, should suspend operation.

5, lifting, no one is allowed to stay and walk under the derrick, derrick, objects must keep a safe distance with overhead lines.

6, lifting objects should pull the rope, the speed should be uniform, it is forbidden to suddenly brake and change direction, translation should be more than 0.5m higher than the obstacles, falling should be low-speed light, to prevent dumping.

7. When lifting objects, it is forbidden to stand on them or handle them. When it is necessary to process, put down the backing plate and install the lifting arm, hook and rotary brake. Drivers and commanders are not allowed to leave their posts.

8. When lifting at or near full load, it is forbidden to drop the arm or move twice at the same time.

9, lifting heavy objects are strictly forbidden to fall freely, falling action should be slow.

10. Oblique hoisting and hoisting are strictly prohibited. Objects buried underground or condensed on the ground and equipment.

1 1. When the crane stops working, put down the lifting object, step on the brake, put the joystick in neutral, cut off the power supply, close the door and lock it.

12, all operators must abide by the corresponding crane safety operation procedures.

13, it is forbidden to drive with things attached. After the work is completed, the legs shall not be rotated at the same time.

Company Name Project Department

14 when the truck crane is running, the boom should be placed on the bracket, the hook should be hung on the hook of the bumper, and the wire rope should be tightened.

15 truck-type full hydraulic crane must also comply with the following provisions:

(1) Before operation, the ground should be flat, the legs should be put away, and the frame should be flat. Do not operate when the legs are not fully extended.

(2) When there is a load, it is forbidden to extend and retract the boom. When approaching full load, check the deflection of the boom. Do not slam the brakes when rotating, and the landing boom should be slow.

(3) When operating, lock the clutch lever to prevent the clutch from suddenly loosening.

This Responsibility Letter is made in duplicate, one for the responsible person (Party B), the project department (Party A), the work area or the team. It will take effect after being signed by both parties, and will automatically become invalid after leaving the project.

Party A (seal):

Signature of Party A's representative: Signature of Party B:

Year, month, sun, moon, sun.

Safety production guarantee In order to strictly implement the rules and regulations of safety production, do a good job in safety production, improve the self-protection consciousness of all employees, and prevent and put an end to accidents and violations, this safety responsibility guarantee is formulated and strictly implemented.

Specific content

Rule number one. Strictly abide by the national laws, regulations, rules, standards and technical specifications related to the safety production of dairy industry.

Article 2. Establish and improve the post responsibility system for safety production in each post, establish and improve the safety target management system, safety reward and punishment system and safety inspection system. And strictly implement, supervise and implement the theme of "100-day Battle" quality and safety month.

Article 3. Organize employees to study and train safety business knowledge on a regular basis, and special operators shall be trained in accordance with relevant state regulations and obtain operation qualification certificates.

Fourth, resolutely implement the on-site physical examination system and the milk station personnel counting system.

Fifth, according to the working standards and quality standards formulated by the dairy industry, organize the milk source work. Coordinate the work of all districts, and strictly implement the operating rules and safety systems for milking and cleaning.

Article 6, organize the briefing, reasonable and timely arrangement of related work, pass.

Meet the requirements of safety production regulations, notices and meetings.

Seventh, organize regular safety meetings to study and solve problems encountered in production in time.

Eighth, rationally allocate all kinds of workers and organize production.

Article 9. Organize safety and quality inspection in time, and investigate and deal with the problems and hidden dangers existing in the site.

Tenth, attend the safety production office meeting and put forward leading rectification opinions on specific problems at the milk station site.

Eleventh, each class at least once hidden trouble investigation, timely investigation of hidden dangers in production safety, and organizational governance.

Twelfth responsible for the supervision and management of the special operations personnel of the unit.

Thirteenth, organize accident analysis and "three violations" analysis to effectively improve employees' awareness of doing things according to the rules.

Fourteenth, truthfully and timely report safety accidents, assist and actively cooperate with accident investigation and handling, and implement accident prevention measures.

Guarantor: XXX

XXXX,XXXX,XX,XX

Safety operation guarantee 5 In order to ensure the implementation of safety production responsibility and the personal safety of each operator, the Project Management Department of Construction Co., Ltd. signed a post responsibility letter for each constructor during the construction of this project with the person in charge of this project department and all the workers. The contents are as follows:

1. Abide by national laws, regulations and industry standards, abide by operating procedures, abide by various safety production management systems, agreements, disclosures and regulations of the company and the project department, obey safety guidance, and abide by the workers' responsibility system for safety production.

2, enter the site must comply with the following safety ban of the project department:

2. 1, enter the site must wear safety helmet correctly, it is forbidden to disheveled, bare chest and wear backless slippers;

2.2. It is strictly forbidden to dismantle or change safety protection facilities, equipment and warning signs without permission;

2.3, smoking is strictly prohibited in the construction site, it is forbidden to use fire control facilities and equipment without open flame;

2.4. It is forbidden to connect electrical facilities, equipment, lines, devices, etc. In any case and anywhere in private;

2.5, high homework must correctly fasten your seat belt and wear non-slip shoes in accordance with the provisions;

2.6. Without approval, it is forbidden to enter my work scope and area for any reason:

2.7, I operate the type of work, machinery and equipment, tools are prohibited;

2.8. No drinking is allowed during work, and no drinking or making trouble at other times:

2.9, upper and lower operation layer, must take a dedicated channel or ladder, it is forbidden to climb the shelves, structures and other non-channel parts of the upper and lower equipment, facilities,

2. 10, it is strictly prohibited to use hot work without permission, and a hot work permit must be issued if you want to work with naked flame, and it is strictly forbidden to violate the regulations of the project department;

2. 1 1, special type of work, mechanical operators must hold relevant certificates, and it is forbidden to work without a license;

2. 12. Fighting, fighting, gambling, pornography and disobedience to proper management are strictly prohibited;

2. 13, it is forbidden to run, jump, play, throw materials, tools, waste, and throw objects into the air.

3, unity and cooperation, do no accidents around. Illegal operation and violation of labor discipline are strictly prohibited.

4. If the safety facilities are not complete and the foreman of a single project fails to make safety technical disclosure and safety education before shift, he shall have the right to refuse the construction for the illegal command and report the situation to the safety management personnel of the project department for processing.

5. Report any potential safety hazard in time, and evacuate the site immediately if any danger is found, and report to the leader for handling.

6, efforts to improve safety awareness, not to hurt yourself, not to hurt others, not to be hurt by others.

7. Laborers must obey the traffic rules when going to and from work, so as to "stop at the red light and go at the green light". When crossing the road, people must take the zebra crossing. It is forbidden to cross the road or climb over the railing.

The above provisions must be conveyed by the person in charge of Party B and signed by everyone, and the operators must sign for approval and guarantee the implementation. The project department will file the record part as the content of safety education for future reference. This responsibility letter shall take effect from the date of signing until the date of withdrawal. If there is any violation, it shall be handled according to the system of the company and the project department.

Guarantor: XXX

XXXX,XXXX,XX,XX

Safe operation guarantee 6 cooling tower safety operation procedures:

1. Purpose: In order to use the cooling tower more safely, this regulation is formulated.

2. Scope of application: suitable for the operation of cooling towers.

3. Contents:

3. 1 installation

A. During hoisting and installation, ensure that the equipment will not be damaged.

B the vertical axis of the cooling tower shall be ensured during installation, and the tower body shall be stable and reliable.

C. the water inlet and outlet pipes are unobstructed. The pipe diameter used should match the design water quantity of the cooling tower.

D before normal operation after installation and debugging, the circulating system should be replaced with clean water twice. Discharge rust water and sewage, ensure the normal use of the whole circulation system equipment and prolong the service life.

3.2 Check before starting operation

A. Clean the air inlet and outlet of the cooling tower and the foreign bodies in the bottom basin, rinse the bottom basin with clean water, and then discharge it from the sewage pipe.

B. Turn the metering system slowly with your fingers, and adjust the outlet angle of the metering tube (the angle between the outlet angle and the vertical plane is 15 degrees) to ensure the smooth and flexible operation of the metering tube.

C. Start the water pump intermittently to remove the air in the pipeline until the pipeline and chassis are filled with water.

D. Check whether there is enough clearance between the end of the fan and the inner wall of the ram. The clearance should be uniform and the angle of the fan blades should be consistent to avoid damage during operation.

E. Check whether the circuit is normal, and confirm whether the specifications of the circuit switch, safety device and wiring conform to the specifications of the motor, so as to avoid single operation and avoid burning the motor.

F. Check whether the running parts rotate flexibly, and solve the problems in time if found, so as to avoid serious consequences.

3.3 Start and run

A. Start the motor and fan when the empty tower is running at no load (without adding water), and check whether the motor and fan are running normally. At this time, the fan should rotate clockwise (looking down), and the no-load running time should not exceed 10- 15 minutes. After normal operation, turn off the motor.

B. Open the water inlet valve, spray water, check whether the spray pipe rotates normally, whether the water distribution is uniform, and whether the water inlet and outlet are unblocked. Adjust the float valve to make the water level reach a proper position, and control the water level in the bottom basin to ensure that there is no "evacuation" phenomenon. The rotation direction of the seeding tube should be clockwise (top view).

C. detect the actual current value of the motor, which cannot be greater than the rated current value of the motor. High-power motors should be equipped with overload protection devices.

D normal operating procedure: when the cooling tower is running, start the water pump first, and then start the motor. 3.4 downtime

A normal operating procedure: when the cooling tower stops, turn off the fan first, and then turn off the water pump.

3.5 Maintenance and maintenance

A. To keep the tower clean, clean the inside of the tower, open the sewage outlet and drain until there is no residue.

B. Check whether the bolt is loose, whether the belt is tight and tighten it in time.

Guarantee for safe operation 7 1. Employees must wear labor protection articles correctly, lesbians should have curly hair, and it is strictly forbidden to go to work sick or drunk.

2. The personnel on duty should be familiar with the working principle, technological process, operating procedures and operating parameters of this part of the equipment.

3. When the packing layer and nozzle are blocked by scale and sludge, it must be confirmed that the switch has been cut off and listed before cleaning.

4. When the cooling water temperature at the outlet of the cooling tower exceeds 50℃, it shall be stopped immediately for inspection and treatment.

5. The water in the cooling water tank of the cooling tower should be completely replaced every 2 months of operation or when the kiln is stopped for maintenance, and the water tank should be cleaned to prevent the cooling water from concentrating due to the long-term operation of the cooling tower, so as to prevent the cooling part of the cooling tower and equipment from corrosion and scaling.

6. Before running the fan, please carefully check whether there are any foreign objects inside the cooling tower and on the fan blades. If the blades can be moved flexibly by hand (especially after the fan is overhauled and snowed), if this happens, they need to be removed and the lubricating oil level should be confirmed to be above the normal oil level before starting. During the operation of the fan, personnel are prohibited from entering the cooling tower.

7 When the reducer or motor is found to have abnormal vibration or sound during operation, it should be stopped immediately for inspection and treatment, and normal operation can be started only after the trial operation is normal.

8. In the process of operation, if the oil level is abnormally low, and the oil level gauge takes into account the oil leakage in the pipeline and the oil level drops abnormally, it should immediately stop the machine for inspection and handling.

9. Before starting the cooling water pump, confirm the water level in the cold water tank, the open and close state of the import and export valves, and open the exhaust hole at the upper part of the pump for exhaust. Only after completing the above procedures can the cooling water pump be started.

10. During the operation of the cooling water pump, closely monitor the water leakage at the root of the front and rear axle disks, the vibration of the unit and the outlet pressure. If there is any abnormality, you should contact all professionals to stop the machine (it can be switched when running alone) for inspection and handling;

1 1. When the water pump stops in winter, the inlet and outlet valves of the water pump should be closed and the upper drain of the water pump should be opened for drainage.

Guarantee of safety in production 8 In order to ensure the implementation of the responsibility for safety in production, the safety of on-site operators and the personal safety of construction workers, put an end to fatal accidents, reduce general accidents and ensure the realization of the management objectives of safety in production throughout the year, the project management department of MCC Construction Hi-Tech Engineering Technology Co., Ltd. and BAIC (Guangzhou) Co., Ltd. signed a personal safety operation guarantee with the employees of Guangzhou Company for the 20xx annual technical transformation project, the contents of which are as follows:

1, be sure to fasten your seat belt for aerial work;

2, enter the construction site must wear safety helmet correctly;

3, special type of work must hold relevant certificates, mechanical operation must hold relevant certificates;

4, abide by the responsibility system for production safety, abide by the operating rules, abide by the safety production management system, obey the safety guidance;

5, safety measures are not complete, single project foreman did not do safety technical disclosure, the illegal command has the right to refuse the construction, report the situation to the project safety officer;

6. Report potential safety hazards in time, and report to the leader for handling in case of distress;

7. Smoking, drunken operation and wearing slippers are prohibited on site. Non-professionals are prohibited from operating machines and electrical equipment. Safety facilities are not allowed to be dismantled and changed at will, and fire control facilities are not allowed to be moved at will.

8, unity and cooperation, and strive to improve the awareness of production safety, do not hurt yourself, don't hurt others, don't hurt by others.

Strictly abide by the site management regulations and operating procedures during construction, and obey the management of site management personnel. Otherwise, you will be fined or dismissed, and you will be responsible for personal violations.