1. Before entering the construction site, the construction personnel must carry out education and assessment on construction safety and fire control knowledge. Those who fail the examination are prohibited from entering the construction site to participate in the construction.
2. Strictly implement the operation procedures, do not give illegal instructions, have the right to refuse the instructions of illegal operations, and have the responsibility to stop others from doing illegal operations.
3. Personal protective equipment must be worn during construction, and safety helmet must be worn when entering the construction site. Don't use fire without permission, and don't operate after drinking.
4, engaged in aerial work personnel should experience regularly. People suffering from hypertension, heart disease, anemia, epilepsy and some people who are not suitable for aerial work are not allowed to engage in aerial work.
5. When working high above the ground, steel bars, structures, etc. Be sure to wear non-slip shoes.
6, the scene of the electricity, must be managed by personnel, set up a special distribution box it is forbidden to pick up disorderly pull, implement the system of electricity listing, put an end to illegal operation, to prevent personal, line and equipment accidents.
7, electric drills, hammers, welding machines and other electrical appliances, distribution boxes should have leakage protection devices and good grounding protection ground wire, electrical appliances and cables must be regularly checked to ensure good insulation, and insulating shoes and gloves should be worn when using the motor.
8. The lighting of the construction site must use safe voltage below 36V. When all electrical appliances are not in use, the power supply must be cut off at any time to prevent the equipment from burning out.
9, in the use of blowtorch, electric welding machine and the necessary place to make a fire, to fill in the registration application, guardianship by designated personnel, equipped with fire equipment, etc. , to ensure the implementation of fire control measures. When welding, special attention should be paid to check whether there are flammable materials below and make corresponding protection. After use, check that there is no fire before leaving.
10, high altitude and construction site operations, such as pipeline wiring, equipment installation and debugging, etc., must strictly implement safety technical regulations, and it is forbidden to operate smoothly, causing accidents that should not occur.
1 1, in the whole construction process, we must strictly implement the national, provincial, municipal and ministerial regulations and relevant regulations on engineering fire protection.
12, always complete and maintain the fire fighting equipment, so that it can be maintained and used. Seriously implement the fire responsibility system step by step and do a good job in fire control.
Extended data:
Design change and project visa are very important contents in construction management, because of their extensive contents, complicated reasons, poor regularity and long time to determine the cost.
Generally, the project cost adjusted due to design change and project visa accounts for nearly 20% of the total settlement of unit project completion, at least about 6%, and accounts for a larger proportion in technical transformation and technical measures, mostly above 20%, and sometimes even up to 40%.
Paying attention to and doing this work well is a major event for the construction unit, and understanding the significance and content of design changes and engineering visas is the first major event to avoid dangerous accidents.