Aerial work personnel are not allowed to wear slippers and hard-soled shoes to enter the construction site;
Its small working tools should be put into the tool bag, and it is forbidden to throw them when passing them up and down;
The operation time should be chosen during the day, and it is forbidden to carry out construction in strong winds, thunderstorms and at night;
Aerial work personnel must wear safety belts and hang them in a stable place at any time;
Hoist operators must be operated by qualified personnel in strict accordance with the operating procedures of the hoist;
Lifting equipment must be commanded by a special person, and illegal operation is not allowed. The spreader must be inspected regularly, with a safety factor of 7 times.
Matters needing attention in the operation stage of cableway trestle
After the installation and erection of the cableway trestle bridge is completed, it can be put into use only after it is accepted by the relevant units and departments;
Personnel passing through the cableway bridge are limited to construction management and operation personnel, and all irrelevant personnel are strictly prohibited;
It is strictly forbidden for people suffering from hypertension, heart disease and acrophobia to pass;
When the constructors pass through the cableway bridge, the distance between the front and rear personnel must be 1m, and they should advance at a normal pace in the gap. It is forbidden to frolic, stop, run, walk side by side or unilaterally on the trestle.
It is forbidden for construction personnel to walk on the cableway bridge in a positive step, March in a hurry or swing from side to side;
In bad weather such as strong wind and heavy rain, the cableway bridge must be stopped;
When crossing the cableway bridge, the concrete conveying pipe or cable must be laid in the middle and fixed firmly;
The cableway bridge should be equipped with full-time management personnel to stop illegal traffic during peak hours.