Current location - Education and Training Encyclopedia - Education and training - General model essay on personal work summary of electric power employees
General model essay on personal work summary of electric power employees
How time flies! A period of work has ended. Looking back on our past work, we have gained a lot. I think you need to write a work summary. How should I write a work summary? The following is a summary of the personal work of electric power employees that I have compiled for you, hoping to help you!

Personal Work Summary of Electric Power Employees 1

Since I joined the work of _ _ _ Electric Power Bureau, I have been serious and responsible for my work, and my ideological quality and ability have been constantly improved and improved. Under the care of the organization, my professional skills have made great progress.

Since 2000, from my job responsibilities, I am very grateful to the correct leadership of the company leaders, as well as the strong support and help of various departments and construction personnel of the company. In terms of safety work, the goal of safety production management has been basically achieved. In particular, there are more than 0/00 items of large and small projects in our company throughout the year, and there is no minor injury or serious injury accident, and the project quality can meet the acceptance standard. These achievements can not be separated from the efforts of all employees in our company.

1. I think the achievements of safe production throughout the year are mainly due to the great attention and correct guidance of leaders at all levels of the company and the active efforts and cooperation of all employees of the company. Here, I think, one decision is very important for our safety work throughout the year, and that is to insist on holding a good pre-shift meeting. At the beginning of this year, manager Niu proposed at the morning meeting that the daily pre-shift meeting of the team must be organized well. Use the activity time of the pre-shift meeting to arrange the work of the day, explain the safety precautions of the work of the day, convey the company's current main attack objectives and strategic deployment, and let every employee have a clear understanding. Because we insist on this work, it has played a good role in the safety work, project progress and project quality of our company and laid a solid ideological foundation. The real effect of this work is also reflected in the actual production activities.

Two, the basic realization of the supervision and inspection of the construction site of key projects. In this way, problems and some hidden dangers can be found in time, handled and solved in time. This year, the company's projects include county reconstruction; Anti-stealing and automatic generation of line loss; A dozen temporary electricity; Military substation, Liaoning Police College and boiler room in relocation area; Substation kiosks and high and low voltage external lines in three relocation areas. Recently, cable projects such as the western suburb trunk line, the southern suburb trunk line Liu Shu Village branch line and the new bifurcation trunk line. The construction site is scattered, the construction period is tight and the progress is slow. Under the leadership of Minister Zhang, I basically inspected the construction site. From the construction process of these projects to the acceptance of power transmission, more than 95% of the projects can meet the acceptance standards and be completed within the prescribed time limit. It has indeed achieved the task of ensuring quality, quantity and safety.

Third, due to the large number of people in the project this year and the lack of free time, the safety study and education work for construction personnel has been reduced accordingly. This year, I used the pre-class meeting and spare time to study and educate the operators four times and organized them to take exams. In his spare time, he organized teams and groups to study and test "Safety Education for Construction Personnel Entering the Site". In addition, all employees of the company were organized to take the safety production laws and regulations examination (Ganjingzi District Examination), and the number of participants reached 98%. The study of safety laws and regulations is the basis of improving the safety technology and prevention skills of our operators, ensuring the engineering quality and preventing man-made accidents. In my opinion, although we don't have much time to study and educate, we can really consolidate and improve the thinking of operators through study and education, and it also plays a certain role in improving the knowledge level of safety production and the understanding level of operating procedures and technologies, and can be seriously implemented in practical work. This is what I must do well and stick to in my future work.

Finally, talk about the shortcomings in my work.

On-site inspection goes through the motions. Insufficient inspection and supervision of the safety activity records of the team. The problems found were not strictly investigated to achieve the effect of educating everyone. There is a gap in organizing workers' safety study and education.

Summary of personal work of electric power employees II

First, the main situation of production safety

This year, our bureau conscientiously implemented the spirit of the 16th National Congress of the Communist Party of China and fully implemented the Law on Work Safety. Since the beginning of this year, under the correct leadership of superiors and the joint efforts of all staff, our bureau has successfully completed various tasks of safety production and maintained a good situation of power production.

Second, the safety work review

This year is a very busy year for power grid transformation and emergency repair. Our bureau always puts safety work in the first place, analyzes and studies the actual situation of power production, power construction and management, grasps the trends of safety production in time, puts forward different safety work priorities according to the tasks and requirements of different periods, and holds meetings at different levels for deployment. This year's safety work of our bureau always adheres to the policy of "safety first, prevention first", strengthens and implements the mechanism construction and various rules and regulations construction with the responsibility system for production safety as the core, strengthens the safety supervision system and safety guarantee system, and ensures the safe, reliable and economic operation of the power grid in our city, and ensures that no major personal and equipment accidents occur in our bureau this year.

(1) Establish and improve the responsibility system for production safety at different levels.

(2) Do a good job in the construction safety of power grid construction and transformation.

(three) do a good job in the rectification of hidden dangers of power lines and equipment to ensure the safety, reliability and stability of power supply.

(four) set up a special rectification leading group to do a good job in safety rectification.

(five) to strengthen safety publicity and training education, improve the safety quality of employees and the safety awareness of the masses.

(six) adhere to the regular meeting system of production safety, and constantly improve the level of production safety work to ensure the realization of safety objectives.

(seven) adhere to the accident "four pass".

Three, the main problems existing in the work of production safety

Although the safety work of our bureau has made some achievements this year, and no major personal and equipment accidents have occurred, equipment obstacles, illegal phenomena and attempted accidents have occurred from time to time. The safety situation is not optimistic, and the work of safety production has a long way to go.

Summary of personal work of electric power employees 3

First: production work

During the period of 65438+ 10 to 20 _ _-June, the automation class mainly carried out the following large-scale work:

1.500 kv Guiyang substation automation system monitoring program upgrade and debugging operation, 220 kv east Jiangxi second loop, 500 kv 5013,5021,503 1, 5032,5043 circuit breaker and 500 kv Guifu line, Feng.

2. The dispatching automation systems of Luodian Electric Power Company, Changshun Electric Power Company, Longli Power Supply Bureau, Qingzhen Power Supply Bureau, Xiaohe Power Supply Bureau, Huaxi Power Supply Bureau and urban dispatching center have reached the standard.

3. The automation system of Luodian Power Company's 35kV Mao Jing Substation was put into operation;

4. The telecontrol signals of 35kV Guang Shun Substation, 35kV Pendulum Substation, 35kV Power Generation Substation and 35kV Yao Substation of Changshun Electric Power Company are connected to the county dispatching automation system to work;

5. Huishui Power Supply Bureau 1 10kV Longgang Substation remote control equipment dismantling and new monitoring system debugging; 1 10kV Huishui substation remote control equipment demolition work;

6. The telecontrol signal of the 35kV Maochang substation automation system of Longli Power Supply Bureau is connected to the county dispatching automation system to work;

7. The telecontrol signal of Qingzhen Power Supply Bureau 1 10kV Acropolis substation automation system is connected to the county dispatching automation system;

8. Commissioning, acceptance and trial operation of automation system of Qingzhen Power Supply Bureau 1 10kV Hanpoling Substation;

9. Integration of the dispatching automation system of the former North and South Bureau, including transferring the substation channel of the former SCADA system of the South Bureau to the North Bureau system, and establishing reports, charts and databases;

10. The dispatching automation system, remote viewing system and dehumidification system of the former Nanju city centralized control center were relocated;

1 1. The backup account of substation equipment and dispatching system is partially completed.

Periodic inspection of circuit breaker measurement and control device in 12. 220kV Zhudong Substation, Zhan Jie Substation and 500kV Guiyang Substation.

13. Daily maintenance and fault handling of integrated automation equipment in substations under its jurisdiction;

14. Automatic debugging and trial operation of new substation lines under its jurisdiction, as well as data modification and maintenance of relevant county dispatching terminals;

Our bank overcame the difficulties of heavy tasks and few personnel and successfully completed the above tasks. Moreover, in view of the situation that there are more integrated work and telecontrol signal work in newly connected substations, efforts are made to ensure quality and strive for zero-defect operation through the implementation of perfect standardization system and anti-accident measures; Improve the closed-loop operation system of defective teams to ensure zero-defect operation of operation equipment;

Second: work safely.

While carrying out the production work, the safety work of the automation class has not been relaxed, and the principle of paying equal attention to production and safety has always been adhered to, and both hands should be hard. Complete the daily safety work of the team on time and in quality, such as weekly safety meeting, work ticket statistics, safety summary, etc. , actively carry out spring, autumn and winter safety inspections and various special safety inspections, actively respond to the instructions of our bureau to carry out safety evaluation work in combination with daily safety evaluation, and actively carry out safety evaluation work, further consolidating the safety foundation of our class.

Looking back on the safety work of our class in the first half of 20__, we have made some achievements, but there are also some problems:

1: In the past spring safety inspection and safety evaluation, our class actively participated in various safety activities in the bureau and workshop, but the written records of safety management were not standardized and comprehensive enough to truly reflect the activities of the safety team. Under the care and guidance of workshop leaders and safety officers, the safety activities and safety records of our class are gradually standardized, the previous safety management work is systematically rectified, and the safety management of the team is strengthened.

2. There is a lot of on-site work in the automation class, and it is found that the on-site safety awareness of the staff in our class is still not up to the standard. If the issuance and execution of the working ticket on site are not careful enough, the safety measures on site are not perfect, which will affect the safe operation of personnel and automation equipment. In view of the weekly safety study and the monthly safety team operation analysis meeting in our class, organize the whole class to discuss the safety situation and analyze the safety shortage and preventive measures in our class. Seriously urge the class members of our class to analyze and expose the causes and phenomena of the three major security enemies of "habitual violation of regulations, carelessness and irresponsibility". Especially in the case of comprehensive self-transformation and new construction of substations and rapid upgrading of automation technology, the status of automation equipment in power grid operation equipment is becoming more and more important. The operation of automation equipment is directly related to the safety of power grid operation. Always tighten the string of safety and resolutely implement the safety regulations for power production and the new standards of China Southern Power Grid.

Summary of personal work of electric power employees 4

Looking back on my work experience in _ _ _ years, I feel a lot, which can be summarized in sixteen words:

First, be good at learning.

The university has given us some basic theoretical knowledge, but it is still far from practice. I'm not a power major, so everything is new to me after I joined the power industry. Having good political quality and professional quality is the prerequisite and necessary condition for doing a good job. In order to improve their own quality and adapt to the enterprise environment and jobs quickly, everything should be learned from scratch. Although many times, what I have learned is useless, I have a good habit of self-study. From the initial accounting cleaning and daily accounting treatment, to the later accounting of power supply station, I humbly learned from the host accountant and others at that time and got the accounting qualification certificate as soon as possible. I am also diligent and conscientious in my work, and I haven't made any mistakes in my work for several years. After working as a secretary, I actively study secretarial knowledge at work and try my best to learn the business knowledge of all departments of the company. After learning, the knowledge level has been further enriched, and the political theory literacy and post knowledge level have also been greatly improved. Seriously studied all kinds of documents and conference spirit related to mass work, and became familiar with the party's mass work line and policies; Seriously studied the trade union law, labor law, electricity law and other laws and regulations, laid a solid theoretical foundation for daily handling of mass affairs, and did a good job in letters and visits, mediation, legal affairs and contract management; In addition, I also actively studied power system knowledge, enterprise management, computer knowledge, official document writing and other knowledge, which greatly enriched my mind. Learning is a great event in a person's life and also a kind of enjoyment. Through learning, I feel and gain a lot of new knowledge, and since then I have opened a door to a new knowledge world. Because of my good habit of self-study and so much knowledge accumulation, I am better at analogy in my work, my working ability is constantly enhanced, and I am more and more confident.

Second, be sensitive in thinking.

Thinking is a kind of strength, which reflects people's psychological activities and knowledge richness. While constantly strengthening learning, I also actively think about the problems existing in my work and industry, and I am good at going deep into the grassroots and conducting investigation and research in combination with my work practice. In view of accounting business, multi-industry reform, electricity fee recovery, line loss management, quality service and other issues, I have a keen mind, improved communication with my colleagues, and mastered a lot of first-hand information. He has carefully written many papers, such as Insider Control and Enterprise Reform, Quality Service Should Have a Degree, Assumption of Reconstructing Enterprise Employment System, Five Problems of Refined Assessment in Taiwan Province, Discussion on Problems and Countermeasures in the Promotion of Prepaid ic Card Electric Energy Metering Device, Prospect of Development Trend of Rural Power Company, Discussion on Problems and Countermeasures in the Promotion of Postal Deduction Business of Rural Electricity Fee, and so on, and published them publicly at all levels. It is also because I am diligent and witty. I have made many writers, editors and writers with the same hobbies online and in reality, learned from each other, forged a deep friendship and became a mentor and friend in my life. It is meaningful to put the results of thinking into action. I made an in-depth investigation into the current situation of salary assessment for agricultural electricians. In view of the fact that there is no feasible assessment method at present, I successfully designed a set of agricultural electrician salary assessment template based on the company's actual and documentary guidance, and applied it to this day.

Third, the result of hard work and study is reflected in work performance. Since I was transferred to the office, my work ability and performance have been continuously improved.

First, constantly strengthen the writing skills and strive to improve the level of writing and meeting. The writing of materials should be as detailed and accurate as possible, actively learn from leaders and other departments, carefully analyze the materials of higher authorities, think from the perspective of others, and strive to improve the writing level. Keep reading books, newspapers and news. Insist on thinking, practicing and revising frequently, and strive to improve the quality of articles. Exchange writing experience with colleagues with an open mind and learn useful experience. Over the past few years, with the care, support and help of office leaders and colleagues, I have undertaken various written materials, mainly including: drafting the company's annual work report; Write the annual and semi-annual work summary of the office, speeches, summaries and reports of company leaders, etc. Do a good job in writing and reporting monthly information, and write and report monthly information in time. Attend general manager's office meetings and other special meetings, keep meeting minutes and draft relevant meeting minutes. Responsible for organizing the training of information officers in the company's secondary units, which improved the quality of information submission at the grassroots level. In addition, he is diligent in writing, and has a keen thinking about the development and present situation of the power industry. He has written nearly 60 articles, which have been seen in online media, magazines and newspapers at all levels.

The second is to firmly establish a sense of service and work creatively. At work, I always remind myself to firmly establish a sense of service, constantly improve the quality of service for leaders, and strive to be leaders' assistants. I resolutely obey the arrangement and deployment of company leaders and office directors in my work; Meticulous, slow and steady; Quickly understand the leadership intention, quickly implement and do gymnastics quickly; Familiar with the operation and use of modern office equipment such as computers. Carefully proofread and verify the leaders' speeches, work reports and notices. I carefully checked and proofread the documents to be printed, especially the first half, and finally sent them to the office director for review, which reduced the chance of mistakes and ensured the accurate and timely issuance of documents. Strictly keep secrets, persist in doing things in a down-to-earth manner, and strive to implement every work assigned by the company leaders and office directors. Over the past few years, I have actively assisted the director of the office to do a good job in word checking and comprehensive business, assisted the director in making arrangements for large-scale meetings such as the annual workers' congress and the work meeting at the beginning of the year, assisted the director in doing a good job in the company's birth management, and improved various systems and materials in the office, laying a foundation for standardized management, labor competition and standardization construction of the office. While completing my own work, I can conscientiously and responsibly do other work assigned by the leaders and organizations, and strive to do urgent things at once, important things as soon as possible, and ordinary things as soon as possible. Over the past few years, due to my excellent work, I have become the backbone of the office, and I am _ _ _ _ _ _ _ _ _

Third, constantly strengthen internal and external coordination to safeguard the legitimate rights and interests of enterprises and employees and social stability.

As a public welfare enterprise serving thousands of households, the legal affairs of power supply companies also show the unique characteristics of the industry, that is, unpredictability and suddenness. In view of this feature, on the one hand, I strengthen the study of legal knowledge and strive to improve my legal level and legal affairs handling ability, on the other hand, I strengthen communication and contact with the company's perennial legal consultants. For users who maliciously make things difficult or use electricity irregularly, contact the legal adviser and the power police office in time, actively strengthen contact with the government power facilities protection department, and further strengthen the protection of power facilities. The company strengthened contract management and performed the contract signing procedures in strict accordance with the contract signing procedures. Drafting, preliminary examination, revision, retrial, signing and other links have been well controlled. The content of the contract is strictly controlled, the written expression is accurate and logical, and it is finally examined and approved by the company's perennial legal adviser. We have strengthened the standardized management of corporate official seals, formulated methods for the use of official seals, tightened the approval authority for the use of official seals, and strengthened the implementation of the registration system for the use of official seals.

Stability is the first priority, and the operation of enterprises must have a good and harmonious internal and external environment. In order to maintain the stability of enterprises and the rights and interests of the masses, in the face of the heavy task of maintaining stability, I have further deepened my understanding of the importance of letters and visits and made them the focus of my work. Report the petition work to the leaders regularly every month, further improve the petition information network, always focus on curbing collective petitions and repeated petitions, effectively solve and reflect the problems reflected by the masses' petitions to the leaders, and do practical things for the masses. In recent years, the ideological dynamics of workers in grass-roots units have remained stable, and there have been no petitions and leapfrog petitions; Timely handling and responding to the proposals of the National People's Congress and the Chinese People's Political Consultative Conference (CPPCC) made everything settled and was affirmed by government departments. Regularly report the legal stability report and contract management report to the municipal company every quarter. In recent years, the company is harmonious and stable inside and outside, showing a good development trend.

Fourth, be willing to be plain.

Over the years, I have been working in the background and rarely face customers directly; Even if it is directly facing the customer's copying work, it is also rushing between urban and rural areas, and more is dealing with electricity meters. Years of accounting, dispatching, operation duty, rural power management and secretarial work are doomed to be boring. Especially in duty and secretarial work, they are often busy alone in front of the lights when there are thousands of lights. They are lonely. The nature of work determines that workers must endure loneliness and be willing to be dull. Although I am more lonely, I also have happy times. I am very happy when I look at the lights outside the window when I am lonely; When my first draft was approved by the leader, I was very relaxed; When the manuscript was published in the newspaper, I was very comfortable. Although my job has changed again and again, I have always maintained this good mood and left him alone in the world. Looking back on my 13 years of work and life, I have both joys and sorrows, but everything is over. A journey of a thousand miles begins with a single step.

The road ahead is still long, and there will be more new tasks and challenges, but I am confident and capable of accepting the challenges. I will make unremitting efforts from now on, from the side, from scratch, to improve myself in all directions and strive to make greater contributions in my work.

Summary of personal work of electric power employees 5

Since I joined the work, I am serious and responsible for my work, and my ideological quality and ability are constantly improving and perfecting. Under the care of the organization, my professional skills have made great progress.

Since this year, from my job responsibilities, I am very grateful to the correct leadership of the company's leaders, as well as the strong support and help of various departments and construction personnel of the company. In terms of safety work, the purpose of safety production management has basically been achieved.

Standards, especially our company's annual large and small projects 100, without a light or heavy accident, the project quality can meet the acceptance standards. These achievements can not be separated from the efforts of all employees in our company.

1. I think the achievements of safe production throughout the year are mainly due to the great attention and correct guidance of leaders at all levels of the company and the active efforts and cooperation of all employees of the company. Here, I think, one decision is very important for our safety work throughout the year, and that is to insist on holding a good pre-shift meeting. At the beginning of this year, manager Niu proposed at the morning meeting that the daily pre-shift meeting of the team must be organized well. Use the activity time of the pre-shift meeting to arrange the work of the day, explain the safety precautions of the work of the day, convey the company's current main attack objectives and strategic deployment, and let every employee have a clear understanding. Because we insist on this work, it has played a good role in the safety work, project progress and project quality of our company and laid a solid ideological foundation. The real effect of this work is also reflected in the actual production activities.

2. Since the beginning of this year, the supervision, inspection and guidance on the construction sites of key projects have been basically realized. In this way, problems and some hidden dangers can be found in time, handled and solved in time. This year, the company's projects include county reconstruction; Anti-stealing and automatic generation of line loss; A dozen temporary electricity; Military substation, Liaoning Police College and boiler room in relocation area; Substation kiosks and high and low voltage external lines in three relocation areas. Recently, cable projects such as the western suburb trunk line, the southern suburb trunk line Liu Shu Village branch line and the new bifurcation trunk line. The construction site is scattered, the construction period is tight and the progress is slow. Under the leadership of Minister Zhang, I basically inspected the construction site. From the construction process of these projects to the acceptance of power transmission, more than 95% of the projects can meet the acceptance standards and be completed within the prescribed time limit. It has indeed achieved the task of ensuring quality, quantity and safety.

Third, due to the large number of people in the project this year and the lack of free time, the safety study and education work for construction personnel has been reduced accordingly. This year, I used the pre-class meeting and spare time to study and educate the operators four times and organized them to take exams. In his spare time, he organized teams and groups to study and test "Safety Education for Construction Personnel Entering the Site". In addition, all employees of the company were organized to take the safety production laws and regulations examination (Ganjingzi District Examination), and the number of participants reached 98%. The study of safety laws and regulations is the basis of improving the safety technology and prevention skills of our operators, ensuring the engineering quality and preventing man-made accidents. In my opinion, although we have less time to study and educate, we can really consolidate and improve the thinking of operators and improve the knowledge of safe production through study and education.

Level, the level of understanding of operating procedures and technology, whether it can be seriously implemented in practical work also played a certain role. This is what I must do well and stick to in my future work.

Finally, talk about the shortcomings in my work.

1. On-site inspection goes through the motions.

2. The team's safety activity records are not checked and urged enough.

3. The problems found were not strictly investigated to achieve the effect of educating everyone.

4. There is a gap in organizing workers' safety study and education.

Articles related to the summary of personal work of electric power employees;

★ Summary of personal work of electric power employees

★ Model essay on personal work summary of electric power

★ Model essay on personal work summary of power plant employees

★ Model essay on personal annual work summary of electric power in 2020

★ Personal Work Summary of Power Company

★ 202 1 personal work summary of electric power employees

★ Personal summary report of electric power employees

★ Personal annual work summary essay in electric power business hall: 3 articles.

★ The latest excellent model essay on work summary of electric power employees.

★ Five selected works of the latest electric power employees.