What is the acceptance standard for residential decoration in Xi 'an?
A, water supply and drainage pipeline installation should comply with the design requirements, to ensure smooth water intake and drainage. There is no leakage at the joints between pipes and appliances and between pipes. Construction can only be carried out after the original pipeline is confirmed to be unblocked. After installation, the pressurized water was tested and there was no leakage. Feed pipe, galvanized pipe hinge teeth 8, raw materials 6 times tightened, no bar teeth. For plastic pipes or aluminum-plastic composite pipes, pay attention to the installation with special tools and operate in strict accordance with the regulations. Finally, conduct a 24-hour stress test.

Two, electrical, wire set household distribution box, and install the grounding wire. There is a leakage circuit breaker in the distribution box, the leakage current is not more than 30MA, and it has overload and overvoltage protection functions. Separate circuit outgoing lines, respectively controlling lighting, air conditioning, sockets, etc. , and the circuit should ensure normal use under load. In addition to the hollow floor, the electrical circuit can also be discharged through pipes, such as PVC pipes, with a wall thickness of not less than 65438 0.2 mm. Conductors, telephone lines, closed-circuit television lines and communication lines shall not be installed in the same pipe. The total cross-sectional area of the wires in the tube shall not exceed 40% of the cross-sectional area of the inner diameter of the tube, and there shall be no joints and kinks in the tube.

Three, plaster surface should be clean, smooth, straight line Angle, firm bonding, no delamination, no defects such as ash and cracks. Before construction, the wall and top surface should be thoroughly inspected first. If there is any empty drum phenomenon, plastering construction can only be carried out after eradication. Plastering thickness, the top grid is within 10-20mm, the interior wall is within 10-20mm, the surface is smooth, clean, smooth and straight, and the allowable deviation is within 4-5 mm. ..

Four, metope paste firmly, smooth surface, uniform gap, straight around, brick surface without cracks, corner, lack of edge. Tap lightly on the wall, and the empty drum sound should be less than 200 square centimeters.

5. Wooden closets and hanging cabinets: the shape, structure and installation position meet the design requirements. The frame adopts tenon structure, except joinery board. When pasting with veneer materials, it should be smooth and firm, without glue leakage, degumming and warping. The cupboard door is firmly installed and the switch is flexible.

Six, ceiling ceiling installation is firm, the surface is flat, no pollution, cracks, lack of edges and corners, hammer damage and other defects. Stick the fixed cover plate without layering; The shelved cover panel has no leakage, infiltration or warping, and the ceiling position is accurate and firm. When using wooden ceiling and wooden keel, fire prevention treatment should be carried out.

Seven, bathroom equipment sanitary ware appearance clean and undamaged. The installation is firm, not loose, and the drainage is smooth. All joints are sealed without leakage, and the valve switch is flexible and easy to maintain. It is forbidden to fix the toilet seat with cement mortar, and it is advisable to connect and seal it with putty or silicone adhesive.

Eight, need to paint the wall, roof, wooden surface painter, must first embedded putty for the second time, planing, clean up before painting. Pay attention to the color according to the original color sample.

Nine, metal engineering aluminum alloy doors and windows varieties, specifications, opening direction and installation position should comply with the design regulations. Pay attention to the wall thickness of aluminum profile, the window is 1.4 mm, the door is 2 mm, and the expansion joints between the plastic-steel window lining steel and the window frame and the cavity of the hole are filled in layers with wall materials such as foamed plastic (VP) and foamed polyethylene.

X. Determination of construction quality Water supply and drainage pipes, electrical equipment and toilet equipment must all be qualified, and the remaining projects are 90% qualified, so the project quality can be judged to be qualified. (The project that does not meet the acceptance requirements shall be rectified by the construction party until it meets the user's requirements. )

XI。 Decoration quality assurance Within one year from the date of delivery, if there is any decoration quality problem due to improper use, the construction party shall repair it.