Letter of Commitment on Construction Fire Safety 1 In order to seriously implement the Fire Protection Law of People's Republic of China (PRC), the Fire Protection Regulations of Guizhou Province and the Technical Specification for Fire Safety in Construction Sites, implement the fire safety responsibility system of the unit and ensure fire safety, our unit solemnly promises to the construction unit as follows:
First, strictly implement the fire safety system on the construction site of construction projects, clarify the responsibilities of fire control organizations at all levels, implement fire safety responsibilities step by step, and formulate fire safety management documents on the construction site;
Two, fire control institutions of public security organs at all levels found in the fire supervision and inspection and unit self-examination, to ensure that personnel, measures and funds "three in place", in strict accordance with the prescribed time limit timely rectification;
Three, in strict accordance with the provisions of the configuration of fire fighting equipment, set up temporary fire fighting facilities, clear personnel maintenance and management, to ensure that fire fighting facilities, equipment and fire safety signs are in good condition and effective, to ensure that the fire spacing between temporary houses and temporary facilities, temporary fire rescue places, fire water sources meets the requirements, temporary fire lanes, temporary evacuation routes and safety exits are unblocked, and to ensure that the burning performance of building components of temporary houses with high fire risk is Grade A;
Four, strengthen the fire inspection on the construction site, determine the fire inspection personnel, inspection content, location and frequency, and fill in the inspection records. Implement 24-hour key monitoring on the parts prone to fire accidents;
5. Regularly organize employees to receive training on fire fighting knowledge and fire fighting skills, so as to improve employees' fire safety awareness and self-prevention and self-rescue ability, and ensure that every employee is familiar with the "three understandings and six skills" (that is, knowing the danger of fire, the methods of fire fighting and the measures to prevent fire; Can call the police, use fire extinguishers, and escape from fire) and the common sense of fire safety in this position, and the fire training and education rate of employees reaches 100%. Organize relevant personnel on a regular basis for temporary housing on the construction site,
Fire inspection of temporary facilities, and timely rectification of fire hazards found;
Six, to ensure that all personnel engaged in electric welding, gas welding and other operations with fire hazards hold relevant certificates, and strictly implement the on-site monitoring and safety measures before hot work construction, and go through the formalities for examination and approval of hot work in accordance with relevant regulations;
Seven, according to the actual situation of the construction site, strictly formulate fire fighting and emergency evacuation plans, and carry out targeted fire drills at least 1 time every month;
Eight, my unit voluntarily accept the supervision of the public, in strict accordance with the relevant fire laws and regulations and technical specifications for fire safety on the construction site, if there is any violation, according to the relevant provisions of the Fire Protection Law of People's Republic of China (PRC) and the Fire Protection Regulations of Hebei Province, my unit will bear relevant legal responsibilities;
Nine, my unit solemnly promises that in the process of engineering construction, especially during the summer vacation and the 18th National Congress, we will strictly abide by the fire laws and regulations, seriously carry out safety self-inspection, eliminate hidden dangers, be responsible for ourselves, accept supervision, and resolutely avoid influential fire accidents.
Commitment unit and fire controller:
date month year
Letter of Commitment on Building Fire Safety to the Tenderee 2:
In order to ensure the smooth bidding of this project and ensure high quality, efficient and civilized construction at the same time, we will strictly implement the Regulations on the Management of Construction Projects, fully accept the entire contents of the bidding documents of xx project with the project number of xx, and make the following commitments:
1. According to the enterprise's own situation, we will bid rationally and will not bid at a price lower than the cost. The total bid price is xx million yuan, including xx million yuan for safety and civilized measures (including: xx million yuan for temporary facilities, xx million yuan for civilized measures and xx million yuan for safety measures). ), otherwise we are willing to take any risks. (to be filled in by the bidder)
2. The original bid bond certificate (□ bid guarantee □ annual bid bond certificate) is submitted with the bid, and the amount of the guarantee is xx million yuan (in words). (to be filled in by the bidder)
3. Once we win the bid, we promise to sign a construction contract with you within xx days after receiving the bid-winning notice according to the contents in the bidding documents and the bid-winning notice, otherwise it will be deemed that we voluntarily give up the bid-winning qualification.
4. Complete the whole contents of the scope of the construction contract (consistent with the bidding scope) according to the regulations, the quality meets the requirements of the qualified standards, and the quality objectives are qualified.
5. Establish a perfect quality and safety assurance system, and provide project management institutions and project management personnel consistent with the bidding documents and meeting the construction scale, technical requirements and safety requirements, and ensure that they are resident at the site. We are equipped with project management institutions and project management personnel in this project. For details, please refer to the Equipment List of Project Management Team. Before replacing the above-mentioned personnel, you and the construction administrative department must obtain approval. (to be filled in by the bidder)
6, all construction personnel through the "safety card" training, and go through the formalities of industrial injury insurance and accidental injury insurance.
7. See Annex Table of Main Machinery and Equipment for the main machinery and equipment we put into this project. (to be filled in by the bidder)
8. Make sure to submit the performance guarantee approved by you within the day after receiving the letter of acceptance, and the amount of the performance guarantee is 10,000 yuan, otherwise, you can cancel our bid-winning qualification. (to be filled in by the bidder)
9. If the technical tender is not required for this project. We guarantee to complete the preparation of the construction organization design for the implementation of this project within the day after winning the bid, and get your approval.
10, in order to ensure the construction safety, our company promises to submit the municipal infrastructure pipeline protection measures within the construction scope after signing the construction contract.
1 1. We guarantee to complete and hand over the project within (or before) days (except for the delay caused by us). (to be filled in by the bidder)
12. The engineering changes during the project implementation shall be measured and priced in strict accordance with the relevant provisions of the contract between the two parties, and guarantee to accept the engineering contents that you require to complete the changes.
13. According to the warranty scope and corresponding warranty period of quality defects agreed in the construction contract, we will send someone to carry out maintenance within the day after receiving the warranty notice until it reaches the qualified quality standard.
14. Other major commitments stipulated in the tender documents:
15, we did not commit fraud in this bid, nor did we collude with other bidders, tenderers and bid evaluation experts. Otherwise, it will be subject to cancellation of bidding qualification, cancellation of bid-winning qualification, termination of contract, red warning of bad behavior records, and clearing the list of pre-selected contractors.
16. In case of violation of any clause in this commitment, we are willing to accept:
(1) is regarded as our unilateral breach of contract, and we will pay you liquidated damages or terminate the contract as agreed in the contract;
(2) The performance evaluation is good or below;
(3) The tenderee of this project may refuse our participation in bidding in the future;
3. Letter of Commitment on Building Fire Safety of Construction Engineering Safety Supervision Station:
For the project supervised by the contractor, it is promised that the combustion performance grade of the building components of all temporary facilities built on the site is Grade A, and the combustion performance grade of the sandwich panel core material is Grade A, and the inspection report is obtained through the on-site inspection of the inspection organization; Promise that all safety nets entering the construction site are qualified flame-retardant dense mesh safety nets, and provide inspection reports. Strictly abide by the Technical Specification for Fire Safety in Construction Sites (GB50720-20xx) and earnestly fulfill the responsibility of fire safety management in construction sites.
Project manager of construction unit
(Seal) (Signature):
Director of supervision unit
(Seal) (Signature):
Project leader of the construction unit
(Seal) (Signature):
Letter of Commitment on Building Fire Safety 4 Our company was honored to participate in the project bidding of (project name), and hereby made the following commitments:
1. project quality: if our company wins the bid, it will ensure that the project quality meets the engineering standards. Can not meet the engineering standards, according to the total project cost punishment.
2. Time limit: If our company wins the bid, we will ensure that the project will be completed within days. If it can't be completed on time, it is willing to bear a fine of RMB yuan for each day of delay until it reaches the total project cost.
3. Quality service: From the date of completion acceptance, our company will provide quality tracking service for the project according to the relevant provisions of the contract. If the project has construction quality problems, our company is willing to repair it unconditionally.
4. Civilized construction: Our unit promises to carry out civilized construction in accordance with the requirements of construction specifications during the construction process, to ensure that the civilized construction of this project reaches the qualified standard, and strive to become an environment-friendly high-quality project. After the completion of the project, the construction site environment is pollution-free.
5. Safe production: If our company wins the bid, bamboo scaffolding will not be used to ensure safe construction. Ensure that the construction safety of this project reaches the qualified standard, and ensure that there is no fatal safety accident in this project.
6. Project Coordination: If our unit wins the bid, our unit promises to communicate and cooperate with all construction units and maintain friendly relations with local residents (villages) under the leadership of the headquarters.
7. Wages of migrant workers: If our company wins the bid, our company promises to ensure that the wages of migrant workers are paid on time.
8. Industry management: If our company wins the bid, we promise to consciously abide by industry management.
Bidder: (Seal)
Legal representative: (signature or seal)
5 the unit building fire safety commitment (unit name)
In order to further strengthen our own fire safety management, create a good and orderly fire safety environment, and better abide by national and municipal fire laws, regulations, rules and technical standards, we solemnly make the following commitments:
First, in accordance with the "Regulations of Beijing Municipality on Fire Safety Management in Construction Sites" (Decree No.84 of the municipal government) and other laws, regulations and rules, strengthen the fire safety management in construction sites to ensure fire safety in construction sites.
The second is to implement the fire safety responsibility system and post fire safety responsibility system step by step, clarify the fire safety responsibility system and post step by step, formulate various fire safety systems, patrol inspection systems, night duty systems and fire emergency plans, conduct fire safety education and training for all construction personnel, and conduct fire fighting and evacuation drills, so that the tasks are clear and the responsibilities are implemented to people.
Three, in accordance with the requirements of relevant laws and regulations, before the start of the construction project, the construction organization design, fire safety measures on the construction site and security plan shall be submitted to the public security fire control institutions.
Fourth, ensure that the safety net, purse seine and thermal insulation materials used in temporary buildings and construction sites meet fire safety standards, and do not use flammable or combustible materials.
Five, according to the warehouse fire safety management regulations to store and keep the construction materials.
Six, do not store flammable and explosive chemical dangerous goods and flammable and combustible materials in construction projects. For inflammable and explosive dangerous chemicals and compressed flammable gas containers, special warehouses should be set up according to their properties and stored in different categories.
Seven, the use of flammable and explosive dangerous chemicals in the construction, formulate fire safety management measures; No repackaging and seasoning in the workplace; Construction projects shall not use liquefied petroleum gas; Discarded inflammable and explosive hazardous chemicals after use shall be removed in time.
Eight, establish and improve the fire management system. When fire is used in construction, it shall be examined and approved by the person in charge of fire prevention on the construction site. After obtaining the hot work certificate, the operation shall be carried out at the designated place and time, and the operation shall not be left until there is no fire hazard.
Nine, establish and improve the electricity management system, and take fire prevention measures. The installation of electrical equipment and electric welding and gas welding operations must be operated by trained and qualified professional and technical personnel.
Ten, do not set up a dormitory in the construction project. If the dormitory is set outside the construction project, combustible materials are not used for separation and electrical appliances are not used. The set emergency lighting and evacuation signs meet the relevant fire safety requirements.
Eleven, set up temporary fire lanes in the construction site, and ensure the smooth flow of temporary fire lanes. Do not pile up, pile up or occupy temporary fire lanes.
Twelve, in the construction site configuration fire equipment, set up temporary fire water supply system, to ensure sensitive, effective and easy to use.
The above is the guarantee made by our company, and we will keep our promise. In case of violation of the above guarantees, our unit will bear the relevant legal responsibilities stipulated in the Fire Protection Law of People's Republic of China (PRC), the Regulations of Beijing Municipality on Fire Protection and the Regulations of Beijing Municipality on Fire Safety Management of Construction Sites.
Name of unit (official seal):
Unit address:
Signature of legal representative (or project manager):