Current location - Education and Training Encyclopedia - Education and training - Model essay on deeds of advanced departments
Model essay on deeds of advanced departments
The department is responsible for refining various functions, developing and improving the efficiency of functions, and this part of staff is also an important part of the company. The following is the story of the advanced department I shared with you. Welcome to read and study.

Model essay on deeds of advanced departments 1

The Information Control Department is the technical business department of the hospital, which was first established in 1998. With the development of the hospital, it became an independent, unique and modern department integrated with fire monitoring in August 20 12, with 5 existing technicians. Mainly responsible for the construction of hospital information system and network, established a relatively perfect hospital information system and network management security system, completed the construction and management of hospital computer network system, and established emergency management measures, effectively ensuring the safe operation of hospital information system.

The development of information department also reflects the pace of hospital construction. Since 1998, the first information system in our hospital has been officially used, and the hospital has entered the information age. Computers have become working tools for nurses and doctors. With the acceleration of informatization, the second set of HIS management system was replaced in 2004, and the information system of doctor station, nurse station and outpatient service was improved. The informationization process has replaced the manual doctor's advice, which facilitates the work of medical staff and provides convenience for patients to see a doctor. In May of 20 12, the new ward building of our hospital was officially opened, and the information control department began to perform its functions independently in the new working environment, which contributed to the development and construction of the hospital.

Waiting for work. Over the past few years, under the leadership of the leading group, comrades in this department have carried forward team spirit, innovated working methods and improved work efficiency. All work has been fully affirmed by leaders, and certain achievements have been made, which has promoted the further development of departmental work.

First, in business study, be brave to set an example and strive to be an "example"

Highway engineering technology is a highly professional job, especially in recent years, bridge construction technology has made rapid progress. If you don't strengthen your study, you will fall behind and lose your position in the highway construction market. This requires keeping pace with the times and ensuring the timely updating of knowledge. Especially in recent years, all the work of engineering construction needs qualification certification. Through organizing discussions, comrades in the department fully realized the importance of learning and set off an upsurge of learning. No matter in spare time or holidays, everyone is studying, taking an active part in various certification examinations, and has obtained a number of qualification certificates such as first-and second-class construction engineer, inspection engineer, safety engineer, cost engineer and geotechnical engineer, which has increased a lot of available materials for the company's qualification strength.

In terms of ideological and political study, comrades in all departments have always adhered to the guidance of "Theory of Three Represents" theory, earnestly studied the spirit of Comrade Hu Jintao's "1 July" speech, thoroughly implemented Scientific Outlook on Development, and constantly strengthened ideological and political study. Carry out professional ethics training and education by participating in training, holding symposiums, seminars, etc., improve the overall quality, show good working conditions and spiritual outlook, and further improve the professional ethics and work style discipline of department employees.

Second, in the project construction, make suggestions and strive to be an "expert"

Only by doing the project can we create profits, and obtaining the project construction contract is the foundation for the survival of the agency company. In the current fierce market competition, project bidding is particularly important. The Engineering Department actively organized comrades from all departments to collect bidding information and actively participated in project bidding. This year alone, I participated in the bidding work of five projects, and achieved excellent results in winning the bid for Qi Xin River Bridge in Chiping County (the bid price was 654.38+005,000 yuan) and the fifth contract section of Jinan Connecting Line Project of Ji-Guang Expressway (the bid price was 654.38+0707,900 yuan).

During the construction process, the technicians of the engineering department actively put forward suggestions and suggestions for various problems encountered in the construction, which laid a solid foundation for the smooth completion of the construction task.

In the construction quality management, they strictly control the quality of the project, always keep in mind the purpose of "quality first in a hundred years", strictly control the production, thoroughly study every production link, and deal with problems in time when they are found. The technical management of each construction process has been strengthened, and the construction quality of the project has been effectively guaranteed.

Third, in terms of work style, we should work hard and create an "iron army" style.

In order to further improve the work level and efficiency, the engineering department has always adhered to the management by the chapter, and has successively formulated the rules and regulations such as the post responsibilities of the engineering department, the project file management system, and the attendance system of the project department, which provided a strong institutional guarantee for the development of all work and strictly implemented it.

Engineering construction belongs to field work and the conditions are difficult. It's sweaty in sunny days in summer, muddy in rainy days and freezing cold in winter. Living conditions are mostly board houses. However, the comrades in the engineering department carry forward the spirit of taking the construction site as their home and working hard, overcome all kinds of difficult factors, stick to the front line of the construction site and contribute their own strength to the project construction.

Fourth, in terms of work innovation, Qi Xin works together and strives to be an "expert"

In the engineering construction, they extensively carried out "QC" group activities, which effectively promoted the technical progress. While improving the project schedule and reducing the project cost, it also ensures the smooth progress of safe production. In the construction of various projects, the use of causal analysis and other methods to encourage technicians to broaden their thinking, broaden their horizons and innovate their working modes. At the same time, the idea of safe production and double increase is integrated into the construction, which promotes the technical progress, ensures the construction period and improves the production efficiency.

Five, establish a reward and punishment mechanism to improve work efficiency.

In order to do a good job in engineering construction in a standardized, high-quality and efficient way, the engineering department has focused on the following aspects. The first is to implement the target management responsibility system. According to the characteristics of each work, make clear the work objectives and tasks of each comrade. Regular reporting and year-end assessment have aroused the enthusiasm of general practitioners. The second is to improve the reward and punishment incentive mechanism. The section chief is responsible for the mid-year and year-end evaluation, and evaluates the employees of all departments in accordance with the principles of openness, fairness and impartiality. The evaluation results should be combined with the annual evaluation first, and the completed tasks should be notified and praised. Those who have not completed the tasks should be criticized and not allowed to participate in the evaluation activities. These measures have greatly improved the enthusiasm, initiative and creativity of department employees.

Since the beginning of this year, under the correct leadership of the superior leaders, the engineering department has earnestly performed its post responsibilities with a high sense of responsibility and responsibility. Study hard, study hard and arm your mind with knowledge. Establish the concept of sustainable development, give full play to the role of experts, adhere to the discipline of the iron army, innovate working methods, and set a model benchmark. With determination and confidence, we will certainly go further and higher on the road of highway construction.

Model essay on deeds of advanced departments II

Looking back on the coming 20 1 1 year, under the premise of ensuring product quality, the second phase cellulose workshop of our company actively overcame many unfavorable factors, constantly improved and strengthened the basic management of the workshop, paid close attention to the implementation of production process control, strengthened product quality, earnestly implemented various production indicators, continuously optimized production technology and continuously improved the quality of the team. With the joint efforts of company leaders and all employees,

I. Achievements made

1, production

In view of the 20 1 1 annual production task issued by the group company, the leading group of the second phase of cellulose in our company carefully studied and planned the workshop production as a whole. Summarize and analyze past experience and possible problems in this year's production, remove obstacles in production, and pave the way for ensuring normal production in the workshop and the smooth completion of production tasks throughout the year. Generally speaking, we have basically achieved all the indicators of the company's annual production tasks and met the product sales supply and demand of the company's sales department. This year, a single batch of HPMC produced * * * tons, and the finished products were put into storage * * * tons. This set of data just shows that under the correct leadership of the company's leaders, with the concerted efforts of all employees in the second phase of cellulose, Qi Xin will certainly create brilliant achievements.

While completing the above output, our workshop also attaches great importance to product quality, strictly controls every quality link in the production process, uses the pre-shift meeting and the production process to instill the quality concept in the workshop staff in time, and insists that the operator is the first quality inspector. We always believe that product quality is produced. As long as every employee in the workshop has a high sense of quality and puts himself into every link of production and operation, the product quality will be steadily improved to meet the quality requirements of customers.

2. Safety management

Over the past year, our workshop has incorporated safety production into daily management work, conducted relevant safety education and training for employees on time, and eliminated unfavorable factors in safety production in time. The training content should be easy to understand. Through the development of training activities, the operators' knowledge of safety production, self-protection awareness and fire safety knowledge will be further improved, and the principle of "safety is more important than Mount Tai" will be adhered to. Make all the staff in the workshop firmly establish the safety consciousness of "safety first, prevention first", and lay a solid foundation for the safety management of the workshop in the future. The orderly operation of the production workshop was ensured, and no serious personal injury and equipment damage occurred throughout the year.

3. Production site management.

In order to standardize the arrangement of employees on the production site, realize balanced, safe and civilized production, improve professional quality, improve economic benefits and achieve high quality, high efficiency and low consumption. In September, the group company issued instructions on strengthening on-site management, and studied the 6S management of the workshop according to the company's requirements. 6S management is the basis of site management. The level of 6S management represents the level of managers' understanding of site management, and then determines the level of site management. The employees in our workshop have aroused great concern. Our workshop has made detailed regulations on health management, safety management, quality management, process management, equipment management, tool management and labor discipline, which greatly improved the overall quality of employees and the working environment and order of the workshop.

4. Reduce costs and consumption.

An enterprise, under the condition of market economy, must strive to improve its management level, reduce its operating costs, pay attention to saving expenses and reduce consumption, so that its competitiveness will be stronger and more conducive to development. The focus of cost reduction is to reduce the production cost, which is a concentrated reflection of the quality of enterprise economic operation, and the cost level reflects the comprehensive performance of enterprise management quality and overall quality. According to the actual situation, the corresponding reasonable reward and punishment measures and ideological education of energy saving and consumption reduction are implemented to make the whole production process interlocking and avoid management vacuum. So that people in these functional positions can always maintain a high sense of responsibility and ownership, and gradually develop good savings habits of operators. The slogan of saving every inch of material, every drop of oil and every piece of paper advocated by the company will not become an empty talk.

To this end, I formulated corresponding measures in the second phase of cellulose to reduce production costs and improve economic benefits: ①. Implement unified management and standardization of production projects to reduce unnecessary waste. For example, finished bags and packaging supplies should be approved according to the production quantity requirements; Maintain equipment in time and collect accessories as needed. (2) Summarize the operation experience, find a balance point by combining product quality, raw material consumption and production cost, and reduce raw material consumption and cost without affecting quality. For example, in the use of acetic acid, the original solvent bottom solution is changed to soft water preparation, which greatly reduces the use of acetic acid and thus reduces the cost. ③ Enhance employees' awareness of energy conservation in water, electricity and steam use. (4) improve the one-time qualified rate of single batch and finished products, and reduce the situation of repeated feeding and mixing.

5. Personnel management

20 1 1 year, due to the change of management personnel in the company's production workshop, as well as a large number of newly recruited employees and other workshops to study and train employees, and a large part of them are temporarily recruited from the society, the general cultural quality is low and the work attitude is lax, which leads to the employees' weak sense of responsibility, team spirit and obedience to management, and often appears the phenomenon of being late, leaving early and slacking off, lacking the concept of quality and cost. In this respect, our workshop has timely rectified education and formulated detailed rules and regulations and training plans in all aspects. Cooperate with the quality inspection department to make a detailed statistical analysis of the production process and the bad information fed back by customers, conduct targeted training and education for employees with problems, and then conduct a series of inspection and supervision, establish and improve corresponding rules and regulations and reward and punishment measures, and continuously improve the overall quality of employees to meet the requirements of the future development of enterprises.

Second, the annual workshop management summary

1, strengthen team management and improve workshop management level.

① Strengthen team management. In daily work, workshop leaders regularly organize managers to hold regular work meetings to keep abreast of the practical difficulties and problems existing in the team, and promote the good practices of some teams to other teams, thus improving the overall level of the team.

② Create a learning team. Through the establishment of "learning team", the workshop combined the special work of team basic management with the current learning practice in Scientific Outlook on Development, established an effective communication mechanism, improved the assessment and reward and punishment system of team construction, made new progress in strengthening team assessment, on-site management and improving quality and safety management, created a good learning atmosphere, and gradually realized the change of employees from "I want to learn" to "I want to learn".

2. Strengthen product quality management in the workshop.

In order to ensure the normal operation of the workshop, successfully complete the production plan, and determine the working policy of "improving quality, reducing consumption and increasing efficiency", the quality management work should be as follows:

(1) Formulate quality management rules and regulations and quality control methods.

(2) Only total quality management can effectively guarantee product quality. The workshop strengthens employees' quality awareness through mandatory management system and organizational learning, and promotes the gradual implementation of "everyone is a quality inspector".

③ Based on the principle of "equipment is the foundation", strengthen equipment maintenance, ensure that the equipment in use is in good condition, and ensure product quality with efficient equipment.

④ Implement quality defect analysis system and rectification system within a time limit. Through the analysis of quality defects, the shortcomings of quality control in the production process are constantly found and corrective measures are put forward, which effectively promotes the quality management of all employees.

Model essay on deeds of advanced departments 3

The comrades in the department carried forward team spirit, strengthened service consciousness, innovated working methods and improved work efficiency, and all the work was fully affirmed by the leaders. The following are the advanced deeds of this department:

I. Business learning

Planning and construction involves a wide range of knowledge, most of which are beyond the reach of schools. We should explore and learn by ourselves in our work practice, especially the policies and documents of land and planning are constantly changing, which requires us to keep pace with the times and ensure the timely updating of knowledge. The Ministry 10 comrades are fully aware of the importance of learning, and the enthusiasm for learning from cadres to general staff is extremely high. As long as it comes to study, none of them has missed classes, and none of them has taken leave, even on holidays. Over the years, comrades in the discipline inspection and supervision office of the traffic police detachment have adhered to the guidance of Theory of Three Represents Theory, thoroughly implemented Scientific Outlook on Development, and constantly strengthened ideological and political study and professional knowledge study. Regularly or irregularly to participate in training, seminars, seminars and other forms to carry out professional ethics training and education, broaden the field of knowledge. By studying self-pressure, improving comprehensive quality and showing good working condition and mental outlook, the professional ethics of staff and the style and discipline of cadres have been significantly improved. Comrades in all departments made the same decision, thought the same, kept pace with one heart and one mind, and completed the scheduled tasks. There has never been any violation of laws and regulations such as abuse of power for personal gain, career for personal gain, and post for personal gain.

Second, the project service

After the signing of the project, the procedures involving land, planning, construction, development and reform commission, economic and trade commission, industry and commerce and many other departments are trivial and numerous, and sometimes one procedure has to go through many times. Nevertheless, they work hard, complain and never complain. As long as investors put forward reasonable requirements, they always try their best to ensure customers' expected goals through warm and thoughtful service. In the whole year, * * * helped the project subject to handle 52 construction project planning permits, 79 site selection red lines, 19 red lines and key points, 10 land use certificates and 5 land use certificates. Through solid and effective work results, it has won unanimous praise and recognition from enterprises. Especially in the process of examination and approval of the land planning procedures of the Four Seasons New Town project, I communicated with the city functional departments many times, so that the work that originally took five months to complete was successfully completed in just over two months, and the project got the construction permit three months in advance.

Third, the system implementation

Xinyang Economic Zone is an economic development zone. In recent years, the advanced deeds of the Committee of Maternal and Child Health Hospital have developed rapidly, with a large amount of demolition and relocation compensation in place in time. Many villagers are driven by interests and try to implement illegal construction. In view of this situation, the Planning and Construction Department selected four comrades from the staff to be responsible for the planning and supervision of the park. They not only established a relatively complete planning and management network, but also formulated more practical management assessment rules. Give full play to the style of iron army in punishing illegal construction. Since the beginning of this year, * * * has investigated and dealt with illegal construction 130, of which 5 were forcibly demolished, with an area of 480.8 square meters, 84 were demolished by themselves, with an area of 1.360 square meters, and 39 were stopped at the scene, with an area of 1.2 1.6. Through solid and effective measures, the momentum of illegal construction has been effectively curbed, and economic losses of 1 10,000 yuan have been directly recovered for the economic zone.

Fourth, work innovation.

Seeking large-scale development projects in the economic zone is the source of development, and project construction needs land planning. Under the situation that the national macro-policy controls and tightens the land plan, how to obtain the land plan from the advanced deeds of the measurement department is a big problem in the work. In order to overcome this problem, they actively communicated with the leaders of relevant departments to study national policies, and strived for land schemes through independent site selection, point supply and urban-rural linkage. Through hard work, 22 new cases of land were requisitioned, with an area of 1 4 15.5 mu and listed land of 16, including 3 cases of industrial land, 2 cases of market land 1 case and listed land of 1 case. You are really experts in land.

Verb (abbreviation of verb) work style spirit

At the beginning of the establishment of the economic zone, the urban roads were only two vertical and one horizontal, and the advanced collective deeds of women passed *** 14.5 km. Five years' efforts have now grown to 40 kilometers in five verticals and nine horizontals. In addition, there are 15 kilometers of rural roads, with 65,438 hectares of new greening and nearly 65,438 street lamps. In the past five years, the "construction" and "demolition" of the economic zone have cost nearly10.50 billion yuan through their hands. But in the face of money and temptation, their faith has never wavered. In the past five years, there has not been an incident of violating the law and discipline, not even a letter of complaint from the people. This is truly a model of party member. The secret of success on the road of development lies in perseverance, and the lesson of failure lies in exhaustion and grasping tightly. Planning and construction work is like an endless bowl of rice noodles. It is necessary to establish the concept of sustainable development, continue to carry forward the exemplary demeanor, give full play to the role of experts, adhere to the discipline of the iron army, innovate working methods, and set an exemplary benchmark. They are determined and confident that the top ten advanced deeds of the service sector will surely go further and higher on the road of new ocean development.

People who read the model essay on deeds of advanced departments also read:

1. Model essay on advanced deeds of the department

2. Model essay on advanced deeds of doctors' work

3. 3 reports on self-advancement.

4.6. Proceedings of the Report on Personal Advanced Deeds

5.20 16 advanced deeds of doctors