Test before filing.
Information required for tower crane installation: After the tower crane installation is completed, it needs to be tested by the safety inspection department before it can be used.
Materials required for tower crane filing: 1, qualification certificate of tower crane installation team, and special operation certificate of installation personnel. 2, tower crane certificate, manufacturer's safety production license, special equipment production license. 3, tower crane test report. Some places need the title certificate of tower crane. That's all. I hope it helps you.
How long does it take to install the tower crane?
Before installing the tower crane, apply for installation notice at the security office. After the security checkpoint agrees to install tower crane, install it. After the tower crane is installed and accepted, apply for a notice of use at the security checkpoint. Use it after the security checkpoint agrees to use it. It takes 30 days to register.
Information required for filing of tower crane
1, tower crane installation team qualification certificate, installation personnel special operation certificate.
2, tower crane certificate, manufacturer's safety production license, special equipment production license.
3, tower crane test report. Some places need the title certificate of tower crane.
Tower crane manufacturer for record
Information to be submitted
1, a copy of the business license of the legal person of the property right unit;
2, special equipment manufacturing license;
3. Product certificate;
4, manufacturing supervision and inspection certificate;
5, construction lifting equipment purchase and sale contracts, invoices or related valid documents;
Note: All copies must be stamped with the official seal of the property right unit.
What does it mean to put on record the certificate of tower crane?
It is necessary to record the certificate of tower crane. Because everyone has a file in the enterprise, he can master the type of work at any time, which is very special. Convenient for work needs.
What information should be reported before tower crane installation?
Before the installation of tower crane, it is necessary to submit the certificate of degradation, then the installation certificate and quality inspection certificate, and then to formulate the safety certificate, and the installation certificate also needs to check the intermediary. These are some materials before the installation of the tower crane, because he has learned a lot of safety equipment. Of course, if an individual is not suitable for these public places and is only used by one person, only a few are needed, but it is generally necessary.
How to deal with the tower crane without filing?
The installation notice shall be notified by the installation unit. Inform the conditions that need to be met;
1, record certificate of construction hoisting machinery and equipment 2, copy of qualification certificate and safety production license of installation unit 3, list and certificate of special operators of installation unit 4, list and certificate of full-time safety officers and technicians of installation unit 5, construction plan for dismantling hoisting machinery and equipment 6, emergency plan for dismantling hoisting equipment 7, contract for entrusted dismantling of hoisting equipment 8, tower crane foundation concrete strength test report and foundation acceptance report 9, and accident caused by technical disclosure of installation safety in violation of the above provisions shall be handled according to national laws.