1, in order to strengthen the power production site management, standardize the behavior of all kinds of staff, and ensure the safety (personal, power grid and equipment), this regulation is formulated in accordance with relevant national laws and regulations and combined with the actual power production.
2. Workplaces and construction vehicles where people often work should be equipped with (first-aid kits) to store (first-aid) supplies, and designated persons should be regularly inspected, supplemented or replaced.
3, all kinds of workers should (inform) their workplaces and jobs (risk factors), (preventive measures) and (emergency measures).
4. One work ticket should be submitted to (the person in charge of the work), and one copy should be kept in (the work ticket issuer) or (the work permit holder). The working ticket should be given to (the person in charge of the work) in advance.
5, working ticket, working ticket (issuer) and working ticket (work permit) are not responsible for the work at the same time. The person in charge of the work can fill in the working ticket.
6. The work list should specify (work tasks), (power outage range), (work place) and supplement safety errors. The work task is made in duplicate, signed by (the work issuer) or (the person in charge of the work), one copy is kept, and one copy is handed over to the person in charge of the team for execution. After the work is finished, the team leader will return the work task list and go through the work completion formalities.
7. If the first work permit needs to be extended, the person in charge of the work shall apply to (the work permit holder) before the end of (the effective time) and handle it after approval.
8. If the power outage lines also involve lines coordinated by other units, the person in charge of the work can only start work after the management unit coordinating the power outage operation designates a contact person to inform these lines that they have been (blacked out) and (grounded) and fulfill the written procedures (work permit).
9. After going through the work permit formalities, the working director and full-time guardian shall explain (work content), (division of labor), (live parts), (on-site safety measures) and (dangerous points) to the members of the working class, and the working class can only start working after performing the confirmation procedures. The person in charge of the work and the full-time guardian are always at (the work site), carefully monitoring the safety of the working class personnel and correcting unsafe behaviors in time.
10, when the line is out of power, (the person in charge of the work) can take part in the work of the working class without the danger of electric shock.
1 1. Before installing the grounding wire in the working area of the power outage line, check whether there is voltage on the line. The qualified (contact) electroscope with corresponding voltage level should be used for electricity inspection. For lines of 380V and below, qualified (insulating rod) or special (insulating rope) can be used to check the electricity.
12, the grounding wire (short circuit for three times) shall be installed immediately after the line experience proves that there is no voltage.
13 when the grounding wire is hung on a multilayer power line erected on the same pole, it should be hung first (low voltage), then (high voltage), then (lower layer), then (upper layer), then (near side) and then (far side). The order of demolition is just the opposite.
14. Connect the grounding wire first, and then connect the conductor end. The grounding wire has good contact and reliable connection. The removal sequence of grounding wire is the same (opposite). When installing and removing the grounding wire, an insulating rod or a special insulating rope should be used, and (the human body must not touch the grounding wire) or an ungrounded wire.
15. If there are (near), (parallel), (crossing) and (erected on the same pole) lines in the work area, in order to prevent the induced voltage on the power-off lines from hurting people, (personal safety line) must be used when working in contact with or near conductors.
16. Before conducting (contacting) or (approaching) conductor operation on the tower, hang up the personal safety line and take it off after the operation. When installing, the personal safety line should be connected first (grounding end) and then (line end), with good contact and reliable connection. The order of removing the personal safety line is reversed.
17, once the circuit breaker (switch) and breaker (disconnector) are closed, they can be sent to the operation site of the work site. "(Not closed, the line is occupied! ) "or" (the door is not closed, someone is working! ) "signature.
18, when patrolling in thunderstorm, windy weather or accident, the patrol personnel should wear (insulating shoes) or (insulating boots); Patrol lines in summer and mountainous areas should be equipped with necessary protective tools and medicines; Take enough (lighting tools) when patrolling at night.
19, patrol at night along the line (outside); The windy patrol line should go along the line (on the Phoenix side) to avoid encountering broken wires when an accident occurs; Special inspections should pay attention to the selection of routes to prevent people from being hurt by floods, landslides and bad weather. Accident patrol should always consider the line (live). Even if you know that the line has been out of power, you should think that the line is possible at any time.
20, line patrol personnel found wires and cables off the ground or hanging in the air, should try to prevent pedestrians near the location of the wire off (8 meters), so as to avoid step voltage cuts, and timely report to the dispatcher and superiors, waiting for processing.
2 1, (accident emergency treatment) and (closing circuit breaker (switch)) can be omitted.
22, operation ticket application pen or ballpoint pen to fill in item by item. The operation ticket issued by (computer) should be consistent with the handwritten format. The face of the operation ticket shall be clear and tidy, and shall not be altered at will. The operation ticket shall be filled with the dual names of the equipment, namely (equipment name) and (number). Operators and supervisors should check the filled operation items according to (simulation diagram) or (wiring diagram) and sign them respectively.
23, pour brake operation must be carried out by two people, (one),