2. Installation of the upper glass trough on the lower side of the embedded iron parts: install the steel parts at the bottom of the trough according to the design drawing size, fix them with expansion bolts, and then install the upper and side steel glass troughs.
Straighten it up and fix it.
Install the bottom belt in the groove, and all non-stainless steel parts should be painted with antirust paint.
3. Installation and positioning of glass bricks: All tempered flat glass is produced by professional manufacturers and transported to the construction site.
Clean the glass tank and glass block first, put the glass block into the installation tank with a glass installation machine or a consignment sucker, plug it with a plastic block, level it vertically and then fix it, install all the same glass walls for leveling, and then start vertical glue injection.
4. Glue injection: First clean the stainless steel glass grooves and glue injection places at the upper and lower sides of the glass seam, and then use white tape to stick the glass and stainless steel plate surfaces on both sides of the glue injection, leaving glue injection seams? According to the national regulations, glue injection is required, and the same seam should be scraped at one time without stopping.
5. Cleaning: Clean the installed glass block with special glass cleaner.