Current location - Education and Training Encyclopedia - Education and training - Model essay on substation work summary (5 selected articles)
Model essay on substation work summary (5 selected articles)
Model essay on substation work summary (5 selected articles)

How time flies! A period of work has ended. Looking back on the achievements of this period, what do you think? It's time to write a work summary and analyze the past work. Are you still worried about writing a work summary? The following are the summary essays (5 selected essays) I compiled for you. Welcome to share.

The bell of the New Year has rung, and before people have time to savor its gifts and blessings, it has started a new journey and reincarnation with a brisk and cheerful pace.

Looking back on xx years, I have made great progress in all my work. Besides being conscientious, conscientious, diligent and hard-working, I can also take the initiative to learn and improve myself. At the end of the year and the beginning of the year, I am sorting out my work in the past year, summing up my experience and lessons, and looking forward to a new promotion in my work and study in the new year.

First, actively participate in business training and study, strengthen their own business skills, and raise awareness of safety precautions.

At the beginning of the year, I participated in the simulator training organized by the municipal company, electric shock first aid, and the knowledge adjustment of Safety Regulations. In all previous studies and trainings, I have always been open-minded and eager to learn, and I am not ashamed to ask questions. I actively consulted the instructor, worked hard on my basic skills, and refined my own business, so that my thoughts always centered on "all for safety in production is to be responsible for my personal safety", which also improved my awareness of safety in production and added a safety guarantee for my operation.

Two, actively do their job, to prevent the occurrence of substation production safety accidents.

In the past year's work, in addition to keeping the elegant and comfortable substation environment clean and tidy, I also actively patrol with my colleagues to strengthen the inspection of main equipment in substation operation and strengthen the safety risk management and control activities of "grasping implementation, grasping process and establishing mechanism". During the inspection, I removed the bird's nest on the fan of the main transformer, and the indicator of B-phase lightning arrester in Shoumeng branch line of100 kV was broken, which caused the hidden danger of safety production due to the ultra-high ct oil level. At the same time, under the guidance of the leaders of the work area, the safety hazards of our station were checked: check whether the cooling system is set correctly, whether the fan is blocked by foreign objects, whether it can be started normally, whether the on-load voltage regulating switch is locked, whether there is any danger of gear tripping, and whether the gas relay is full of oil. ...

I deeply realize that safety in production is no small matter. Once there is any negligence in safety work, all the work will be in vain. If you want to do a good job in the safe production of substations, you should not panic, confuse your own thinking, misjudge the fault phenomenon and give your brain a clear and correct understanding under any circumstances! In production work, sometimes experience is more reliable than glib words and rhetoric; However, this is also the accumulation result of constantly learning the knowledge of safety production and improving their own skills. Because of this, whenever I need to operate the equipment in the station, I always meditate on the whole process of operation carefully and quickly before operation, carefully outline the number of operations during operation, and consider the right or wrong of each step for fear of any mistakes in operation, so as not to bear the great trust of leaders at all levels.

Third, actively participate in the company's power supply in winter and summer vacations, and successfully complete the "double inspection" work in autumn.

Hot summer and winter are the busiest times for power supply enterprises every year. The hot weather not only tests the will of power suppliers to serve the society, but also tests the safety and strength of the overloaded power grid under high temperature. As the first line of production, the importance of safety in production is even more abrupt. July is the hottest month since the whole summer. In the critical month when the company repeatedly applied for "Welcome to Summer" to ensure power supply, the sudden change of weather and frequent strong convective weather will always make our team anxious. I clearly remember that every time the equipment signals or moves, we quickly get in touch with the local dispatching center and cut and close the reclosing clamp of the switch according to the dispatcher's command to keep the equipment running in real time. While checking and restoring the equipment signal, help the relevant personnel of the faulty line to analyze and find the cause of action, and at the same time safely handle the capacitor in reactive load inversion after the line trips; Timely improve the reactive power compensation rate of running lines and the reliability of timely power supply to users.

It's raining in autumn, and there is something nameless sadness in the fog. With the end of the activities of "Double Inspection" and "Two Grasps and One Construction" of the supervision company in autumn, the work of welcoming the winter has been quietly carried out in our station. First of all, according to the work arrangement of the work area, actively study the sampling system of safety regulations, understand and master the relevant contents of safety regulations according to the nature of substation work, as the basis and guide for doing a good job, and fully understand the guiding significance of safety regulations in actual production, especially for electrical workers, "they should have the necessary knowledge of safety production, learn emergency rescue methods, and especially learn electric shock first aid." Chapter III Study hard, improve the enforcement of safety rules and regulations, and implement various personal accident prevention measures. At the same time, according to the work plan of "Three Preventions" in the work area, the problems found were reported in time, and the self-inspection of oil-filled inflatable equipment in the station and the sealing, heat preservation and anti-freezing inspection of key parts such as mechanism box, junction box, post insulator, switch and transformer porcelain sleeve were completed.

Fourth, actively study production safety accident cases, organize safety team activities, always alert yourself to nip in the bud.

In the past year, thanks to the kindness of leaders and colleagues at all levels, let me cooperate with the team to carry out and organize safety activities four times a month. In the meantime, there are my efforts and efforts, as well as my experience and happiness in harvesting safe production. In every bloody accident case, the victim of the accident may just disobey the rules and procedures, but he has to pay the price of his own life; Or just fail to inspect the equipment according to the requirements of safety regulations, which may cause the main transformer to trip and lose load; On the one hand, it will affect the company's good reputation, on the other hand, it will also cause inconvenience and psychological panic to the public.

With infinite longing for life, I walked into the 35kv substation in Cai Yun. After the transformation, our station has two main transformers, which are responsible for the power supply of two and a half towns. Many people think that the work of substation operation duty is simply reading meters, patrolling equipment, handling work tickets and switching; But only those who have done it know that as a duty officer with a strong sense of responsibility, it is far from enough to complete the above work to ensure the safe and stable operation of a substation; To ensure the safe operation of the power grid, the most important thing is to be good at analyzing and handling the defects of equipment, so that the defects and hidden dangers can be controlled or eliminated in time. The rainstorm in June brought abundant rain around the high-pressure room of our station. In order to prevent rainwater from invading indoor power distribution equipment and causing undue accidents, our class checked in the rain, dredged the blocked drainage system in time, and installed water baffles to prevent rainwater from invading. Then put waterproof mortar on the indoor walls, and finally strengthen the inspection. Through effective measures, I survived the thunderstorm in June safely.

During the probation period, on the one hand, I strictly abide by the company's rules and regulations, do not be late or leave early, strictly demand myself and consciously abide by various work systems; On the other hand, diligence, initiative and hard work; While completing the work assigned by the leader, actively assist other colleagues to carry out their work, learn modestly in the process of work, and improve their abilities in all aspects; In addition, I am an honorable correspondent. In addition to the monthly newsletter, I am also responsible for the technical training of this site, trying my best to assist the webmaster and enrich my work experience. Through the monthly training, the cohesion of our staff has been improved to a certain extent. In the details of the work, I see that the company is getting bigger and stronger. With the current trend, I can foresee that the company will have a brilliant tomorrow. As a newcomer, what I can do now is to work hard to make myself sweat in an ordinary post and glow with youth and enthusiasm; Let yourself get more exercise at the grassroots level.

Now is the stage where I study hard. Every colleague in the company is my teacher, and their rich experience and work behavior are a valuable asset to me. I remember when I first arrived at the substation, I was surprised at everything in the substation. Because I am not a major in substation operation, I have limited knowledge of equipment operation management, but I have benefited a lot under the careful guidance of the stationmaster and shift supervisor. With full work enthusiasm, I gradually became familiar with the operation of the equipment. Although I am only a beginner, I am as enthusiastic about my work as other young people. In order to improve my knowledge and ability in my job as soon as possible and give full play to my subjective initiative, I use my spare time to find relevant materials for study. In a short period of one year, through the combination of theory and practice, I have a real understanding of the basic equipment of the substation, laying the foundation for future work.

I stayed in the substation for a year, met many colleagues, and also learned what "personnel" is. "Dealing with people" is a profound knowledge for both society and units. For this profound knowledge, I, a layman, can only say, "Be honest and do well!"

Along the way, I participated in the maintenance and defect treatment of 35kv substation. In the process of learning from the person in charge, I deeply felt my lack of technology and the hardships of grassroots work! In order to better adapt to the work, I went to Jiangxi Electric Power Vocational and Technical College to study power system and its automation.

As a young worker, my future career is still very long, and there are still many opportunities to learn. As a Communist Youth League member, it has always been my dream to join the Communist Youth League. To this end, I will strive to develop my work and make achievements. In order to achieve my goal at an early date, I ask myself to work hard, maintain my own advantages, correct my own shortcomings, fully reflect my own life value, and do my part for the bright future of the enterprise. I hope that through the efforts of all the staff of the company, the company can be pushed to another peak.

Under the correct leadership of the factory leaders, guided by the "seven consciousnesses" and "six steadfastness" put forward by the director XXX, the operation department in 20xx aims at increasing production and income, reducing expenditure, improving production management level and economic operation quality, strictly implementing the "three strictness and one opposition" and "two votes and three systems", strengthening staff skills training and accident case study, and striving to improve the anti-accident ability of operators. It overcomes the difficulties of long-term operation of the unit such as many equipment defects, unstable coal quality and shortage of personnel. We in Qi Xin made concerted efforts to overcome difficulties, and achieved accident-free production throughout the year. In terms of economic operation, the amount of coal slime, washing and other low calorific value fuels is greatly increased compared with previous years, the cost of power generation is greatly reduced, and the comprehensive economic benefits of coal-fired power generation are significantly improved, thus achieving the goal of improving the management level of power generation and the quality of economic operation.

I. Safety management:

Adhere to the policy of "safety first, prevention first", establish the awareness of intrinsic safety, implement "comprehensive, all-staff, whole-process and all-round" safety management, strengthen the implementation of accident prevention measures, prevent personal injury and major equipment accidents, prevent personnel from misoperation, and improve the controllable, controllable and controlled level of safety production.

(a), strengthen the organization and leadership of safety work, strengthen the responsibility system for production safety, implement the target management of production safety, improve the execution of production safety, strengthen safety supervision and assessment.

In 20xx, we earnestly implemented the responsibility system for production safety, improved various safety production systems, and built a sound three-level safety system, that is, in terms of safety work, individual teams, teams, departments and departments guaranteed factories, decomposed safety tasks item by item, and assigned safety responsibilities to specific responsible persons, and made clear the safety objectives, responsibilities and assessment standards of each team, so as to make safety objectives clear and responsibilities clear. All departments signed safety objective responsibility letters with teams and individuals in time, effectively ensuring the whole.

(2), change the concept, unswervingly adhere to the "three strict and one anti", put an end to production safety accidents.

Since the beginning of this year, managers at all levels in the Operation Department have firmly established the idea that "grasping safety means doing good deeds and accumulating virtues", unswervingly adhered to "three strictness and one rebellion", constantly strengthened on-site supervision and management, strictly implemented the production responsibility investigation and various safety assessment systems, and dealt with the three violations strictly, quickly and severely. In the whole year, the power generation operation team issued 85 on-site inspection notices, and punished 308 people for three violations, including 7 serious violations, with a total fine of 30,800 yuan. The effect of "three violations" is remarkable, which effectively promotes safe production throughout the year and puts an end to minor personal injuries and major equipment damage accidents.

(3) Strictly implement the "two-vote system". Managers should strengthen the supervision and inspection of the code of conduct of field staff, strengthen the inspection and assessment of the implementation of the "two-vote" system, promptly correct and rectify the violations of the "two-vote" system, and put an end to misoperation and other man-made accidents.

Operators have the following problems in implementing the "two votes": First, operators do not have a deep understanding of safety regulations, do not really grasp post regulations, can not be combined with practical applications, and the implementation of safety measures is not perfect. Second, some operators have a weak sense of safety, try to save trouble, take chances, lack self-protection awareness, and the implementation of "two votes" is a mere formality. Third, grass-roots managers, especially squad leaders and team leaders, pay insufficient attention to the "two votes", and some teams and groups have no votes. In view of the above shortcomings, the department manager went deep into the site to give more guidance and guidance, corrected the problems in time when found, reported and assessed the problems in time, and the effect was good, which made the operators form the habit of consciously and conscientiously implementing the "two votes" system and correctly established the sense of responsibility for production safety.

(4) Carry out case studies of typical accidents, improve the cognitive level of operators, broaden their horizons, formulate and implement anti-accident measures in combination with the actual situation of our factory, organize operators to conduct anti-accident drills, and strive to improve the accident handling ability of operators.

In order to draw lessons from the explosion of # 1 boiler and the belt burning accident of #2 boiler e coal feeder in the first half of 20xx, and improve the accident handling ability of operators, the power generation operation group organized all employees to carry out typical accident case learning activities in April, and formulated anti-accident measures in combination with the actual situation of our factory, such as organizing to learn two cases of personal injury caused by electrical misoperation in Nanjing Jinling Power Plant. In order to prevent the occurrence of electrical misoperation accidents, we should seriously learn the lessons of various accidents, so as to draw inferences from others and prevent problems before they happen. Referring to the new version of "Electric Power Safety Work Regulations" (the electrical part of power plants and substations), the technical measures to prevent electrical misoperation were revised and improved, and the operation contents of "Operation Card for Stop Power Transmission of High and Low Voltage Equipment" were refined and supplemented, and the operation tasks were readjusted and classified, and distributed to each team for execution. Organize and study the accident that the water inflow of No.5 steam turbine in Huaneng Dezhou Power Plant caused the damage of the moving blades of the medium-pressure rotor, and formulate anti-accident technical measures to prevent water impact in combination with the actual situation of the steam turbine system in our plant. In the whole year, more than 20 production accident cases in thermal power plants were studied 120, 8 accident cases were reviewed, 95 accident forecasts were compiled according to the abnormal state of equipment, and anti-accident drills were organized for boiler tube explosion, single circulating pump operation and line switch tripping, 1 # anti-accident drills for mechanical overspeed protection failure of units 1 times, and fire drills 1 times. More than 50 other anti-accident drills (desktop drills) have been conducted. After more than 8 months' efforts, the workers' awareness of safety in production and their ability to deal with accidents have been obviously improved. In the second half of 20xx, unplanned shutdowns of two units were eliminated, and the number of unplanned shutdowns of two units (three times) decreased by 40% compared with last year. The unit operation cycle and unplanned shutdown have reached a good level in China.

(five), according to the seasonal characteristics, actively carry out special safety inspection.

In 20xx, according to the seasonal characteristics, the power generation operation team organized safety inspection activities such as spring safety inspection, four precautions in rainy season, autumn safety inspection, five precautions in winter, safety month and major festivals 12 times, and * * * investigated and reported more than 220 hidden dangers and defects (boiler 124, turbine 58, utility system/kloc-).

Second, the completion of production and operation indicators

In 20xx years, the cumulative power generation of the power plant is137015.418000 kwh, the on-grid power consumption is 12 1697955 kwh, the comprehensive auxiliary power consumption rate is 9.35%, and the standard coal consumption for power generation is 338.79 grams.

3. Operation management: Strictly implement various rules and regulations, adhere to the principle of "diligent guidance, diligent supervision and strict assessment", continuously improve the economic operation level of the unit, comprehensively improve the control and control ability of operators in the operation and production work, pre-control, find and deal with equipment defects and hidden dangers in advance, promote the institutionalization, standardization and standardization of operation management, and realize the long-term sustained safe, stable and economic operation of the unit.

(1) Operation system management: ensure that all management work is planned, arranged, implemented, inspected, assessed and fed back, so as to gradually standardize, institutionalize and refine the department management work.

1. Establish and improve various rules and regulations. According to the actual situation of field equipment change and technical transformation (steam soot blowing transformation, increasing oil-fired boilers, reducing warm water at high pressure side, etc.). ), timely revision of various professional procedures, to ensure the correctness of rules and regulations and technical measures. According to the seasonal characteristics, equipment characteristics and operation mode, timely formulate "20xx Spring Festival electricity security measures" and "welcome summer vacation"

20xx years have passed, and 20xx years are coming. On the occasion of the handover of the old and the new, we should review the safety work in the past year, sum up the achievements, analyze the problems, find out the gaps, and put forward measures, so as to carry forward the advantages and overcome the shortcomings in the new year, so that the safety work can be improved and the thinking can be changed. According to the contents and methods of 20xx safety work summary arranged by the leaders of Biotechnology Department, our station will concentrate all staff.

In 20xx, with the correct leadership and help of the company leaders and the production technology department, and with the joint efforts of all brothers and comrades in the whole station, our station has always regarded ensuring the safe and economic operation of the power system as the main task of substation management, actively participated in the enterprise safety evaluation and pioneering work in 20xx, constantly supplemented and standardized the safety evaluation and pioneering work, and insisted on safety first. Strictly implement the principle of "Electric Power Safety Regulations" and strictly "manage" electricity. The specific safety work is summarized as follows:

(1) The station always puts safety work in the first place and the most important work, and plans, arranges, inspects, evaluates and summarizes safety work and production work at the same time. Give full play to the safety ideological education of the Party, the Communist Youth League, workers and youths, publicize and encourage, compete and compare, and make concerted efforts.

(2) Carry out safety education on a regular basis, improve every employee's understanding of safety production, and make it clear that without safety, there will be no modern power production, and there will be no economic and social benefits of the power industry. This site regularly carries out various forms of ideological education activities on safety production throughout the year, such as: safety day activities, operation analysis meetings, after-work meetings, study reports, briefings, briefings, and learning from other units' accident experiences and lessons to inspire everyone. In the past, leaders often talked about safety, but now everyone should be safe, from passive to active. The safety day activities of the whole station reached more than 60 times throughout the year, and the word "strict" was meticulously implemented in accordance with the relevant requirements and regulations of the higher authorities.

(3) I stand on people-oriented, working hard from the herringbone, and the quality of personnel is the foundation. Insist on making a fuss about the quality of personnel, take the old and new as teachers, teach and learn from each other, regularly carry out monthly technical training, hold blackboard newspaper and question-and-answer activities, and carry out anti-accident exercises in combination with the actual situation in the station. In order to make progress from the shortcomings, due to the above measures, the professional quality of the station staff has been improved to varying degrees, and they are familiar with the equipment performance, operation mode, operation, general accident handling and analysis, equipment, performance and rules and regulations of this post. Due to the high technology content of the equipment, on-site training is often carried out to ensure the safe operation of the equipment.

(4) Various systems are complete, responsibilities are clear, and there is no violation. The handover system operates in an orderly manner according to industry norms and company requirements. There were no unclear handover, lax handover and untimely handover. Labor discipline is strengthened, and there is no phenomenon of leaving the post and leaving the post. Wear a work permit at work, dress neatly, have nothing to do with work, and always maintain a full mental state.

(5) Equipment management should ensure that equipment, personnel, equipment and people have a ledger. Everyone has a responsibility, and everyone has pressure. The equipment patrol was carried out on time, and there was no omission. In case of operation mode change, heavy load, abnormal equipment failure, bad weather, etc., the number of inspections is increased as required, so that the equipment of our station is always in good condition, and once the equipment has problems, it can be reported and handled in time.

(6) All kinds of records are neat, standardized, complete, error-free and inconsistent in time, especially the two tickets. Our station has sent personnel to Gao 'an substation for many times to learn from the scriptures, and now the two votes are gradually moving towards the standardized track.

(7) The safety work of Xiangfu Substation shall be carried out as planned, so as to check the project to people, set the completion time, set the results and requirements, check the measures to prevent small animals once a month, block the holes in time when they are found, close the doors and windows in time, check the fire control facilities once a month, record the time, check the air pressure, and replace them in time if they fail to pass the inspection, or replenish the air. Safety tools must be inspected before use, and they must be tried after expiration. It is forbidden to use expired or unqualified tools. Because the safety work of our station is carried out in accordance with the above contents, there are no minor injuries and obstacles in 20xx, and attempts and anomalies are strictly controlled, so there will be no equipment accidents caused by inadequate inspection equipment. These achievements are inseparable from the correct leadership of the company leaders, safety supervision departments and the headquarters office, and from the joint efforts of all station personnel.

In order to fully implement the spirit of the Notice of Northwest Power Grid Corporation on Launching Inter-station Labor Competition in 330kv Substations, our station actively responded to the call of superiors, and further strengthened and improved the team building and operation management level of our station through the good platform of labor competition to ensure the safe and economic operation of equipment. According to the requirements of the notice, under the correct guidance of leaders at all levels, all the staff of our station have earnestly and solidly carried out labor competition activities, and now the activities are reported to the leaders as follows:

I. Overall arrangement of competition activities:

This competition is mainly divided into six stages.

1, MM DD YY-MM DD YY publicity and mobilization stage

Earnestly organize and study the notice of the superior about carrying out labor competition activities, so that the staff of the whole station can fully realize the importance of the competition to the station, make mental preparations, strengthen the sense of competition, establish confidence in winning, and at the same time do a good job in the production preparation, acceptance and debugging of the second phase expansion, and work out the overall arrangement of the labor competition activities of the station.

2, year month day-year month day self-inspection report stage.

Decomposition of quantitative competition rules, from the aspects of safety management, equipment management, technology management, civilized production and so on. According to the requirements, formulate implementation standards according to the problems found, determine the rectification items according to the competition standards and rectification methods, and put forward specific rectification plans to superiors.

3, year month day-year month day rectification implementation stage.

According to the plans made in the early stage and the rectification projects put forward, carefully organize and accurately implement the competition activities, list monthly plans, weekly plans and daily plans, strengthen on-site safety management, rectify while working, ensure the quality of the competition, and focus on system construction, personnel training, equipment management and environmental governance.

4. welcome the inspection of the bureau and department from the date of the year to the date of the year.

Meet the inspection of the bureau and the competition leading group, and rectify the problems raised. Through the steps of inspection-rectification-re-inspection-re-rectification, the management level is continuously improved and improved.

5. Year, month, day-year, month, day to meet the inspection of provincial companies.

6. Meet the inspection of network companies after the year, month and day.

Second, the competition activities:

First, the work has been completed:

1, complete the statistics, production and layout of primary equipment signs in the whole station;

2. The inspection and statistics of secondary equipment identification in the whole station have been completed, and 95% of secondary equipment identification has been supplemented and improved;

3. Completed the statistical work of cable sign inspection in the whole station;

4. Complete the statistical summary of equipment defects and equipment rectification in the whole station;

5. Cooperate with the company to complete the software upgrade and data entry of microcomputer integrated information management system, which meets the actual needs of the site after the second phase expansion;

6. Complete the supplement, improvement and revision of the substation site operation procedures, typical operation tickets, one or two typical working tickets and accident handling plans;

7. Completed the planning and statistics of safety facilities standardization;

8. Completed the compilation and revision of standardized operation execution card, standardization of safety facilities, typical accident handling plan, dangerous point analysis and precontrol standardization of substation standardized management instruction;

9. The simulation pictures of main transformer fire fighting system and station system are made.

10, the whole station staff participated in the microcomputer training class organized by the provincial company in batches;

1 1. After the second phase expansion, the civil planning and rectification of most outdoor areas were completed, and the production and living environment was greatly improved.

B, ongoing work:

1. The environmental management of the outdoor area of the whole station has reached the final closing stage;

2. The locking device of high-voltage equipment is replaced by microcomputer locking, and the manufacturer (company) is producing, which can be installed and debugged in the station in the near future;

3. The rest of the standardized management instruction of substation is being compiled and revised;

4. According to State Grid Corporation's Substation Operation Management Specification, the substation operation management specification is being compiled;

5. The manufacturers of phase II air compression system simulation screen and 220v DC system simulation screen are producing;

6. The data of the whole station shall be sorted according to the requirements of file management, and the basic data shall be prepared for the next step of realizing electronic version management;

7. The primary equipment structure layout drawing of the whole station is in progress;

8. The rules and regulations and daily operation management of this website are constantly revised and improved;

C, the next work plan

1. Make use of winter leisure time to further strengthen the training work of our station, change the training methods and improve the training quality;

2. Complete the rectification and elimination of equipment in the whole station;

3. Complete the lighting transformation of the whole station;

4. Complete the leakage treatment of the internal and external roofs of the whole station;

5. Complete the greening planning of the whole station;

6. Complete the development and implementation of remote transmission system of working ticket.

Three. Features of this competition:

1, leaders at all levels of provincial companies and bureaus attach great importance to it, and party and government workers pay great attention to it, creating a very strong competitive atmosphere. Wang, manager of the provincial company, Chen Shuqiang, director of our bureau, Lian, production director, Wu, chairman of the trade union, and deputy chief engineer have visited our station many times to guide the work.

2. Functional departments coordinate with each other. Bureau of biotechnology, safety supervision department often go deep into the scene to solve specific problems in the process of guiding the competition. The substation operation department carefully organizes and accurately implements it. The director, deputy director and working team often give up their rest time, work overtime, and actively participate in the competition activities of our station with full enthusiasm and solid style.

3. The staff of the whole station are active and enterprising, carry forward the fine traditions, brainstorm in the competition, all staff participate in management, strive to be ahead, pay attention to system construction, personnel training, data management and equipment maintenance, and strive to be people-oriented;

4. Pay attention to the investment in science and technology and improve the level of modern management. In this competition, we upgraded the comprehensive management information system of substation, trained the operators of the whole station with microcomputer, added the local monitoring system and improved the operation management level.

Since the beginning of the labor competition, all the staff of the substation have been enthusiastic and full of energy, and the whole substation has been twisted into a rope. Everyone is full of confidence and vitality. We should take the labor competition as an opportunity to further improve the equipment management and operation management level of our institute through competition, and serve the overall situation of safe, stable and economic operation.