2. Ship service record: ship number, name, port of registry, date of appointment and resignation.
3. Ship information: ship name, ship number, ship call sign, gross registered ton, net registered ton, deadweight tonnage, full load displacement, cargo, total length, total width, summer load draft, running speed, shaft power, propeller, working speed, fuel tank capacity, daily fuel consumption, fuel type and viscosity, number and displacement of lifeboats, number and displacement of life rafts and fire pumps.
4. Engine room duty record: ship number, ship name, port of registry, start and end dates of duty, and days of duty in engine room.
Verb (abbreviation of verb) Check the training plan of the training instructor on board: name of the ship, remarks, signature of the engineer (instructor), signature and date.
Six, the chief engineer inspection training records: the name of the ship, comments, the chief engineer's signature, date, ship seal.
Seven. Inspection and training record of training supervisor of shipping company: name and remarks of shipping company, name, signature and date of training supervisor of shipping company.
Eight, familiar with ship safety knowledge
Nine, familiar with the responsibilities of the ship
The third part, the technical details and operation of the turbine. Including: main engine power, cylinder number, size, maximum and minimum speed, fuel type, compression pressure, etc. Main turbine model, manufacturer, output power, inlet steam temperature, etc. Manufacturer, reduction ratio and tooth profile of reduction gear device. Manufacturer of main boiler, evaporation capacity, steam pressure, etc. Types of thrust devices. Shafting components, maximum speed, model, etc. Propulsion manufacturer, fixed/variable pitch/counter rotation, number of blades, etc. Number, position and driving mode of side thrusters, etc. Number, speed and fuel type of diesel engines of Tuoji. Turbine model, stage, speed, etc. Output power and starting mode of emergency diesel generator. Storage and settlement of oil tanks, etc. Model and quantity of water separator in fuel purification system, etc. Refrigeration room compressor Cold box freezer. Lubricating oil separator daily air compressor. Oil-fired steam boilers and systems. Hot oil heater. Hydraulic system. Cooling water system. Generator. Shaft generator. Emergency generator. Transformers. Battery extension device. Fire pump. Emergency fire pump. Install fire extinguishing devices. Sewage pumps, incinerators, etc ... Part IV, training objects. There are more than one hundred items, namely, the fifth part of the training content and attached pages for machines. This part describes the training content of the fourth part in detail in words, and writes out the main points and precautions of the training. This is a sample.