Summary of measurement work
Selected 4 Summaries of Surveying Work

Inadvertently, a piece of work is over. Looking back on this period, the results are hard-won. Should I write a work summary record? But how to write a work summary to make a difference? The following are four summaries of measurement work I have compiled for you, for reference only. Welcome to reading.

Summary of measurement work 1 one year of contract measurement work. From a structural supervisor, he was temporarily appointed as the person in charge of contract measurement and started the contract work with trepidation. Faced with a project amount of more than 654.38+0.3 billion, he felt that he had a heavy responsibility on his shoulders. At first, he actually doubted whether he was qualified for the job and whether he would betray the trust of the leaders. In this year's work, I encountered many setbacks. By consulting Mr. Li and Mr. Wang, I will answer my doubts one by one, and gradually gain some gains and suggestions on the measurement of supervision contracts. Let's talk about it from several specific aspects.

1. First of all, from a personal subjective point of view, because you used to be a structural supervisor, your working face is relatively single, and the possibility of problems is relatively concentrated. As a contract surveyor, you are faced with the work objects of nine project departments in the whole C bid section, and there are many problems. At the same time, you are facing a new field. How to carry out, how to carry out, how to implement specific problems, how to implement. Without a benchmark, it was really difficult for me at that time. For example, it is necessary to make an actual bill of quantities according to the drawings of each tender section, but it is really difficult because there are too many tender sections and too much workload, and there are three road signs that I am completely unfamiliar with. One person will review the number of drawings and make a list. Secondly, for the monthly regulatory report, the review time is too concentrated. Basically, the monthly report of 15-22 is audited every month, and basically one bid section is audited every day. Relatively speaking, the workload is too large, and there is less time to solve the problem after the audit, which leads to a hurry and some confusion; At the same time, many bidding projects and negotiations are often reported in the monthly report of express measurement, which leads to little time for on-the-spot investigation.

2. As for the report on the project negotiation table, we don't know much about the site, especially the three street signs. We can only judge the content of the report through the attached drawings and the site supervision opinions, and we can't form our own opinions. On the one hand, we have subjective reasons for not doing well, on the other hand, it is also caused by the time lag of reporting content, so we may not know when the site was done or the construction of the site when we report it.

Thirdly, from the perspective of combining measurement with on-site quality control, in the preliminary work, measurement did not cooperate with on-site quality work. I feel that in most cases, the survey work is going forward in a single line, and there is not much combination with on-site control, which fails to achieve the purpose of supervising and managing the project department through my survey work and on-site structure.

In view of the above problems, I have some ideas of my own:

1. In view of the problem that the engineering quantity is too large, in the preparation of this project or the next project, in addition to getting the bidding documents in time and being familiar with the engineering quantity of each bid section in time, the contract department of each bid section can be required to cooperate with the engineering department in advance to give me the engineering quantity of a drawing. I am mainly responsible for reviewing those places that are different from the contract quantities, so that the quantities will be relatively reduced, and at the same time, I have a general grasp of the quantities of each bid section.

2. For the problem that it is difficult to decide whether to bid for the project and negotiate, first of all, I can attend the weekly site meeting, and selectively record the key points that need to be understood by listening to the report of each bid section. At the same time, I will learn more about the contents of the report project and negotiate. After the meeting, I will find relevant department personnel to understand special problems.

3. How to organically combine the two-way control of monthly on-site quality control of contract measurement? I think we can start with the project on the one hand, and if there is a project, we can directly find the signing supervisor to understand the specific situation. On the other hand, from the aspect of reviewing the monthly report, the person in charge of each bid section should also review the monthly report, where it can be reported, where it needs to be deducted, and why. The bid section is responsible for giving opinions.

4. Personally, I feel that the knowledge I learned in the construction site is too scattered. Because there is little training, no systematic study, no overall planning of knowledge points and no clear context, I think this will be solved in the preparation work of the supervision engineer of the Ministry of Communications who participated this year. Through the opportunity of taking the vocational skills examination, we can fully mobilize the subjective initiative, change the pressure responsibility into motivation, and systematize and summarize the theoretical knowledge.

These are my views on some problems and solutions in this year's work. I think we have been talking about integrating theory with practice. Specifically, at work, I should read more books, watch more on the spot, ask more questions, and ask more questions. With a goal, I will work hard.

Summary of Measurement Work In the first half of 20xx, the measurement department of the customer service center earnestly implemented all the decisions and arrangements made by Yichang Company and the Party Committee of the customer service center, accelerated the "two transformations", continuously strengthened the "three constructions" and carried out the "striving for excellence" activities in depth, which effectively promoted the reform and scientific development of the measurement department. The situation of safe production is stable, the main indicators are well completed, the reform and development of enterprises are smooth, and the mental outlook of employees is well coordinated.

First, the main work highlights

1. Conduct on-site appraisal of excellent projects with quality assessment once a month, effectively promoting the safety and standardization of on-site work.

2. Formulated a detailed technical training plan for all staff, which improved their post ability and professional quality. Textbooks were distributed, and all employees with professional knowledge in metrology were trained, which set off a craze for metrology departments to learn technology, business, ability and performance.

3. The Youth League Branch of Metrology Department was awarded "May 4th Red Flag Youth League Branch" by State Grid Corporation.

Second, the first half of the work review

(a) the completion of the main objectives and tasks

—— Safety production objective: no serious injury or personal injury; General power grid, equipment and fire accidents without personal responsibility.

-Power grid construction goal: successfully complete the milestone task of power grid construction; Complete the assessment task of measurement gateway in an all-round way.

—— Marketing target: The periodic inspection rate and weekly inspection qualified rate of standard metering devices and in-use metering devices will reach 100%. —— Production technical goal: complete the key work of technical supervision in an all-round way; Complete the annual task of informatization in an all-round way; Complete the key work of scientific and technological innovation in an all-round way

—— Business objective: control the cost, controllable expenses and capital expenditure within the budget; Regulations on the administration of labor wages and social security funds.

-Harmony and stability goal: There have been no incidents that affect the stability of enterprises, such as leapfrog petitions and collective petitions. -The "three constructions" goal: to realize the goal of party building responsibility system; Standardize the selection and appointment of cadres; There are no negative publicity events that affect the image of the center.

(II) Implementation of key tasks

The security situation remains stable. Based on the "Safety Day" learning activities, combined with the actual situation, we carried out "strong awareness" safety activities, carried out monthly "excellent job site evaluation" activities, and implemented the system of mutual inspection and evaluation of monthly work tickets, which effectively promoted employees' awareness of implementing the regulations through review, evaluation and cash. Strictly assess the safety performance of personnel at all levels, strengthen on-site safety management, strengthen the implementation of on-site safety inspection, comprehensively inspect safety instruments and vehicles, carry out on-site safety inspection in a planned way, and resolutely control and eliminate various unstable factors affecting safety. As of June 30th, the metrology department has carried out 506 work tickets and conducted 303 on-site inspections. No violations were found, and no company inspection fees were deducted. Continuous safe operation for 2 130 days.

The quality of work has been effectively improved. First, strictly implement the measurement standard verification plan and smoothly carry out the transfer of measurement standard verification value. All standard devices and standard instruments are submitted for inspection as planned. In the first half of the year, the verification of 6 standard electric energy meters, 8 electric energy meter verification devices, 13 three-phase electric energy meter field calibrator, 2 current transformers, 5 transformer calibrators and 5 pt voltage drop testers was completed, and all standard devices and standard instruments are within the validity period. Second, a series of activities such as the installation technology and work quality competition of electric energy metering devices were carried out, and the monthly appraisal was conducted in the form of combining work and training, which inspired the center staff to think positively and work hard, improved the quality of installation technology, put an end to quality errors in metering work, and ensured the safe, accurate and reliable operation of electric energy metering devices. Third, strengthen the inspection and on-site calibration of metering devices, and timely replace and deal with the pressure loss faults of Jiaoyun Group, Min 'an Jiayuan and "Qinyuan Community Phase II" in * * East Village found in the inspection to avoid losses. Fourth, according to the work plan of cleaning and warehousing old electric energy meters in Hubei Electric Power Company, the old electric energy meters that have been dismantled and have not been installed in the company's assets are cleaned up, and the waste materials are disposed of in strict accordance with the requirements, and the procedures are made public, with the participation of the Disciplinary Committee, and filed for future reference. By May 3 1 day, the previous inventory cleaning work was basically completed, and the * * * 2942 1 meter was cleaned and dismantled, but the old model was not installed.

1 1533 watt-hour meter.

The service level has been effectively improved. First, the installation registration work is efficient and high-quality, which speeds up the verification of metering schemes and the installation progress of new installation projects, completes the verification of metering schemes for customers in 10kv urban area and customers within the scope of 35kv and above in a timely manner, scientifically and reasonably arranges the construction, completes the installation, commissioning, completion acceptance and power transmission of the installation registration projects in time, and completes the new installation of 99 electric energy metering devices with high quality, which provides a guarantee for the company to actively explore the power market. Second, regularly check customers' electric energy metering devices, and irregularly arrange inspections for major customers such as Yichang Sanxin Silicon Industry to ensure the safe and stable operation of metering devices. Iii. Verified the complaint form 1 1 copy, and repaired 6 cases of various faults, with a user satisfaction of 100%. Fourth, further intensify the publicity of the performance and advantages of smart meters, organize the masses to take to the streets, go deep into the community for publicity, actively carry out the "5.20" international metering day publicity service activities, carry out free "physical examination" of meters and the application publicity activities of smart meters, and improve the metering service level. The "three constructions" were further promoted. Earnestly carry out the activities of "Struggle from Nine to Nine" and "Red Collar Project", actively carry out the activities of "Red Heart Knot" with the point army sub-center, give full play to the political core role of the party organization, and carry forward the typical demonstration role. Strictly implement leadership responsibilities, do a good job in three links: responsibility decomposition, responsibility assessment and responsibility investigation, refine work responsibilities and target requirements, strictly implement the "three majors and one big" decision-making system, and earnestly implement the responsibility system for building a clean and honest government. The "Star of the Month" is selected every month to guide employees to devote themselves to the work of safety production, operation management and measurement management. Through the infiltration of "ideas", we will deepen the activities of striving for Excellence, and truly realize "advanced organization, striving for Excellence in party member, and enterprise by going up one flight of stairs". Actively hold a "moral lecture hall", vigorously promote the advanced socialist culture, praise the truth, goodness and beauty, and call on all employees to re-examine themselves, work hard, dare to take responsibility and be willing to contribute through the form of "people around you tell their own things, people around you tell their own things".

Three. The situation and main problems faced

First, there is still pressure on the ability to control production safety risks. There are many measuring points, so it is difficult to control the site safety risk, and there is still a gap between safety management and the requirements of comprehensive, all-round, all-round and whole process; Individual employees' safety responsibilities are unclear, their safety awareness is not strong, their safety quality is not high, and there are potential safety hazards.

Second, promoting reform faces new challenges. Further promoting the construction of the "three sets and five big" system involves the integration of production, infrastructure, marketing and other businesses, which puts forward urgent requirements for team stability and safety production control ability; Scientific and technological changes such as digitalization of substations and intelligentization of electric energy meters put forward higher requirements for testing equipment, scientific and technological level and personnel quality, and the procurement, operation and maintenance management of all-digital electric energy meters are facing new problems.

Summary of measurement work Chapter III Engaged in contract measurement for one year. I was temporarily appointed as the person in charge of contract measurement from a structural supervisor and started the contract work with anxiety. Faced with a project amount of more than 65.438+0.3 billion, I feel a heavy responsibility on my shoulders. At first, I actually doubted whether I was qualified for this job and whether I would betray the trust of the leaders. In this year's work, I encountered many setbacks. By consulting Mr. Li and Mr. Wang, I will answer all the doubts one by one, and gradually gain some gains and suggestions on the measurement of supervision contracts. Let's talk about it from several specific aspects.

First, from a personal subjective point of view.

Because you used to be a structural supervisor, your working face is relatively simple, and the possibility of problems is relatively concentrated. As a contract surveyor, you are faced with the work objects of nine project departments in the whole C bid section, and there are many problems. At the same time, you are also facing a new field. How to carry out, how to carry out, how to implement specific issues, how to implement, there is no benchmark. For me at that time, it was really a difficulty. For example, it is necessary to make an actual bill of quantities according to the drawings. However, because there are too many blocks, the engineering quantity is too large, and there are three road signs that I am completely unfamiliar with, it is really difficult for one person to review the drawings and make a list. Secondly, for the monthly regulatory report, the review time is too concentrated. Basically, the monthly report of 15-22 is audited every month, and basically one bid section is audited every day. Relatively speaking, the workload is too large, and there is less time to solve the problem after the audit, which leads to a hurry and some confusion; At the same time, many bidding projects and negotiations are often reported in the monthly report of express measurement, which leads to little time for on-the-spot investigation.

Second, report from the form of project negotiation.

Because I don't know much about the site, especially the three road signs, I can only judge the contents of the report through the attached drawings and the opinions of the site supervisor, and I can't form my own opinions. On the one hand, I didn't do well for my own subjective reasons, on the other hand, it was also caused by the time lag of the report content. I didn't know when the site was ready at the time of reporting, or when the site construction would arrive at that process, and no one informed me which related process I could go to see.

Third, from the measurement work and on-site quality control.

In the preliminary work, the measurement work did not cooperate with the on-site quality work. I feel that in most cases, the survey work is single-line, which is rarely combined with on-site control, and the purpose of supervising and managing the project department is not achieved through my survey work and on-site structure supervision.

In view of the above problems, I have some ideas of my own:

1, aiming at the problem that the engineering quantity is too large, in this project or the next project, we can take preparatory work, in addition to getting the bidding documents in time, getting familiar with the engineering quantity of each bid section in time, and asking the contract department of each bid section to cooperate with the engineering department in advance to give me the engineering quantity of a drawing. I am mainly responsible for reviewing those places that are different from the contract quantities, so that the quantities will be relatively reduced, and at the same time, I also have a general grasp of the quantities of each bid section.

2. For the project, the negotiation report is difficult to decide. First of all, I can attend the weekly site meeting. By listening to the reports of various blocks, I can selectively record the main points I need to know. At the same time, I will learn more about the contents of the project negotiation report and find relevant department personnel to understand special problems after the meeting.

3. How to organically combine the two-way control of monthly on-site quality control of contract measurement? I think we can start with the project on the one hand, and when there is a project, we can directly find the signing supervisor to understand the specific situation. On the other hand, it is necessary to start with the review of the monthly report, and the person in charge of each bid section should also review the monthly report, where it can be reported, where it needs to be deducted, and why it should be deducted. The bid section is responsible for giving advice.

4. Personally, I feel that the knowledge I learned in the construction site is too scattered. Because there is little training, no systematic study, no overall coordination of knowledge points, and no clear context. I think this aspect will be solved in the preparatory work for the supervision engineer of the Ministry of Communications who participated in this year. Through the opportunity to take the vocational skills examination, fully mobilize their subjective initiative, turn pressure responsibility into motivation, and systematize and summarize theoretical knowledge.

These are my views on some problems and solutions in this year's work. I think we have been talking about integrating theory with practice. Specifically, at work, I should read more books, watch more on the spot, ask more questions, and ask more questions. With a goal, I will work hard.

Summary of metering work Chapter IV Electric energy metering is not only an important part of power marketing management, but also essential in all aspects of power production, transmission and distribution. It is not only related to the safety of all aspects of power system production, transmission and distribution, but also its accuracy and reliability directly affect the interests of the country, enterprises and customers. I have been rated as a senior engineer for electric energy meter calibration since 20xx 10. 165438. I have always been diligent and earnest in my work, and I have always been strict with myself by the standards of a senior engineer. I have always been serious and responsible, diligent and dedicated, working silently in my post with a down-to-earth work style and an honest and selfless open mind. Although I have made a little progress in my work, I think there are too many things I should learn and master through my usual work. I summarize my usual work as follows:

First, work hard and constantly improve and exercise yourself in practice.

I majored in power generation and distribution at school, and I was assigned to be on duty in substation operation right after graduation. My intense study and life suddenly ended, and I haven't had time to taste what it is like. I started my new job-watt-hour meter calibration. Time will not slow down because of my input and non-input, so it is most important to master as many learning knowledge points as possible in a limited time! In order to quickly adapt to and do a good job in my new job, I humbly learn from my master, combine theoretical knowledge with practice, and make continuous progress in my work. In a short period of time, I can independently undertake the repair and calibration of electric energy meters and transformers, the inspection and rotation of gateway meters, the testing of secondary voltage drop, and also participate in the installation, acceptance and power transmission inspection of substations and user metering devices.

Individuals have also been awarded the honorary titles of "Safety Advanced Individual" and "Excellent Communist Youth League Member" by Yichang Power Supply Company. In the face of achievements, I am sincerely happy, but I also feel a little worried: achievements only belong to the past, and I belong to the future. In the face of continuous scientific and technological progress, the instrument is constantly updated. Only by stricter requirements on myself to study hard in my work and work hard in my study can I make continuous progress and not be eliminated by the times!

Second, strengthen study in work and study, improve quality and skills.

As a senior worker in the production position, I actively participate in the technical training organized by the unit every year: from 65438 to 0993, I participated in the on-the-job training of electric energy meter metering personnel organized by Hubei Power Supply Bureau, and obtained the "certificate of electric energy meter and transformer (metering inspector)" for the first time; In July, 20xx obtained the Verification of Electricity Consumption of Hubei Electric Power Company (Grade II); 20xx65438+participated in the "Evaluation and Expression of Measurement Uncertainty" held by Hubei Pilot Institute in February and obtained the certificate; Also participated in the "Anti-electricity Stealing and Anti-electricity Stealing Research" organized by Hubei Pilot College. 20xx participated in the research of "Hubei Electric Power Marketing Electric Energy Measurement Subsystem" project of the provincial company in April, and summarized and published the article "Problems in the Practical Work of Hubei Electric Power Marketing Electric Energy Measurement Subsystem in Measurement and Testing Center" in the later practical application, which was well received! Through these studies and work, I have broadened my horizons, increased my knowledge, updated my concepts and further improved my professional and technical level. While strengthening my own study, I usually rely on the accumulated experience in my work to help young employees to study professionally, explain their professional knowledge to them, patiently answer some professional questions they ask, and encourage young employees to learn learning skills, business technology and do their jobs well.

Three, lead by example, to play the vanguard and exemplary role of party member with practical actions.

As a * * * production party member, only by mastering his own business can he play a good role as an example among the masses! The year of 20xx is the most special year since the establishment of the Metrology Center. In addition to normal on-site inspection and rotation, we also carry out user transformation of professional transformers, installation and debugging of user load terminals, new installation, fault handling, power transmission inspection and so on. Most importantly, the problems existing in the application of "Hubei Electric Power Marketing Electric Energy Measurement Subsystem" should be corrected in time for the leaders of provincial companies and State Grid Corporation to check. Facing the task, I worked hard with other technical backbones of the department for more than a month, and finally passed the inspection with excellent results, ensuring the smooth acceptance of the large survey.

Fourth, the existing problems

Due to the lack of objectivity and self-study, there are still some problems in the work, which are reflected in the low efficiency of management and some mistakes.

Verb (abbreviation for verb) future plan

"We should regard learning as an interest, not a burden." This is what one of my teachers said. In order to carry out the work better in the future, the verification and rotation of electric energy meters should be managed scientifically, effectively and meticulously. I intend to do two things in my future work:

1. Learn new knowledge, mainly quality management theory and control theory, and apply it to watt-hour meter management according to pdca cycle workflow. Objective: According to iso900 standard, strive to improve management level, improve work efficiency and straighten out management and business links. Therefore, according to the characteristics and nature of business transfer, we are going to prepare a "management flow chart" and an "organization chart" to straighten out business relations dynamically and statically, and truly realize their respective values. Because the electric energy metering management is a closed-loop system, it needs the cooperation of all departments, timely feedback information and correction of deviation, so as to control it more accurately, which is reflected in the fine and efficient electric energy management at work and ensures the income and net profit of Yichang Electric Power Company. Otherwise, once the detection link fails, the system will be unstable, which is reflected in the lack of ventilation, low efficiency and mistakes in different departments, and the consequence is the loss of electric energy and the decline of net profit.

2, constantly strengthen the study of professional and technical theory, this work is very necessary, is an important guarantee for rectification and fine management. Therefore, we should strive to improve our professional and technical level and tap the potential of electric energy measurement.

I think through the effective efforts of the above two aspects, the measurement management of our department will definitely be in by going up one flight of stairs, effectively ensuring the sustainable development of power supply enterprises and making contributions to the creation of a harmonious society.

;