1. Construction preparation: including construction plan, required equipment, paint used, etc. , should be prepared before construction.
2. Safety measures: the construction sections are separated by warning posts, warning signs are erected to prompt the construction ahead, and tools are put on the shelves.
3. Cleaning the road surface: Clean the road surface with professional equipment such as brooms or wind-driven road sweepers.
4. Pay-off: Pay-off and mark with a pre-marking machine.
5. Primer: Pre-coat and under-coat the main marking points to improve the adhesion between the coating and the pavement. When the construction road is long, you can consider using the paint spraying machine under the sky to improve work efficiency.
6. Painting: Painting is the most critical step in marking construction. If you want to elaborate, it is not an exaggeration to write a paper. But it is only necessary to know how to use the marking machine during construction, because the marking machine manufacturer has considered many factors. If you encounter problems, you can also consult the after-sales service of the marking machine. I bought the Tiantu marking machine myself, so I often call them after sales.
7. Closing: After marking, measure the workload according to the actual completed quantity. Trim unqualified marking lines, remove overflow and sagging coating film, and check the thickness, size and distribution of glass beads and the shape of marking lines.
accomplish