I came to Wuhai with curiosity and anxiety. I have never heard of this city. I don't know what my future is like. At night 10, I came to the girls' dormitory. There are two girls here, but I don't know either of them. I didn't sleep much this night, and my heart was like that five-flavored bottle, which was very uncomfortable. It finally dawned, and the two girls and I came to the project site. Because the manager asked me to work in the material industry, I was angry and sad, because I didn't understand and I wouldn't do it. Besides, the climate here is dry and the sun shines on you. There are no relatives and friends here, all strange faces, and my tears are spinning in my eyes. I complained in my heart: Why are you so unlucky? But I remembered the teacher's words again: "In a new environment, loneliness and loss are inevitable, but we must persist and get through it." Although I cried, I told myself that I must stick to it and believe in myself. Nothing is impossible. I just watched this week with this mentality!
Time: 20xx.8.9-20xx.8. 16 (the second week)
This week is my second week in this project. After this week, my state is much better than before. There are many of my alumni here, which give me great comfort and reduce loneliness and strangeness. At work, I work in the material industry and know nothing, but most of them are young people, learning from each other and helping each other. My mood has relaxed a lot. Although I don't understand the work of materials, I am confident to do it well. Our manager, Mr. Chen, guided our work and told us not to ask too much. I think this gives our new classmates a clear direction.
This week, our manager and secretary Chen led us to the Yinchuan project for exchange and study. A football friendly match was held: Yinchuan project VS Wuhai project. I also made many new friends. The trip to Yinchuan was fruitful.
Time: 20xx.8. 17-20xx.8.22 (the third week)
Time flies. I have been in Wuhai for half a month. I go to the construction site every day I feel that when I go to school, it is all theoretical. Now I have the opportunity to learn more about this website by conducting practical research in the past. I went to the construction site and learned about all kinds of materials and templates. Large formwork 1.22*2.44, 1.83*0.9 15m fasteners, fasteners, etc. I've only heard of these materials before, but I don't know how. The construction sequence and reinforcement processing technology of this project. I learned knowledge that I didn't have in books, and I deeply felt the hard work and sweat as a construction worker, which contributed to the rise of this tall building. They are my role models and my motivation!
Time: August 23rd, 20xx to August 29th, 20xx (fourth week)
It's the end of the month in a blink of an eye. We in ministry of materials and equipment should check with the Finance Department, and check with the Finance Department the warehousing and warehousing situation this month. I have to sort out this month's warehousing and warehousing documents and give them to the finance department. This seems like a simple job, but it's not. A slight carelessness will lead to mistakes, mainly in the classification of materials. I have to be careful and ask in time. There are many materials I don't know how to classify, such as water stop and polystyrene board, so this work must be careful. I read the decimal point wrong in a data list, so I did it again. From then on, I told myself that I must be careful and patient, and I also verified the famous saying that "details determine success or failure", which also has a profound reminder. In the future work, I will definitely finish my work seriously. I remember the manager told me not to think of myself as an intern, but to work as an employee. Then this sense of responsibility is stronger, and I will work harder to prove myself!
Time: August 30th, 20xx to September 5th, 20xx (fifth week)
Unconsciously, a month passed and I was really happy when I got my salary. I earned this money by myself. I have been using my parents since I was a child. Now you can support yourself, lighten their burden and feel the hard work of your parents. I don't like it in my heart. I told myself that I must not live up to the expectations of my parents and relatives, and I must continue to work hard. During a week, my production manager and I went to the site several times and learned a lot, such as the support method of concrete pump. The concrete pump should be supported independently, otherwise the accident will have serious consequences. And scaffolding. Now our project uses scissors, which contains a lot of knowledge. Therefore, I have benefited a lot from my study during this period, and I have learned a solid knowledge from practice. Although the site conditions here are bad and the climate is still dry, I don't think this is the resistance to stop me from continuing my study and perfecting myself. I believe that for a person, spiritual strength is extremely powerful!
Time: 20xx.9.6-20xx.9. 12 (week 6)
Starting this week, I will learn to read drawings, because I know that no matter which department, it is inseparable from drawings. Now our project is in the structural stage. I started with the reinforcement of walls and slabs, which is very different from the drawings I saw at school. The drawings here are much more complicated than what I saw in school, such as beams, which are marked in the center and in situ, as well as frame beams and cantilever beams. There are many hidden columns in the wall, and the types of hidden columns are different, including straight columns and cross columns. I can only keep the atlas with me. If I don't understand, I will read it and see what the label means. If I don't understand, I'll ask my colleagues. They all answered my questions patiently. Really learned knowledge. And when looking at the drawings, you must first understand the general instructions before you can proceed to the next process and understand the whole set of drawings. I only saw part of it this week. I will continue to look at pictures next week and learn more knowledge to enrich myself and improve myself!
Time: 20xx.9.13-20xx.9.19 (week 7)
This week, I went to the site to collect materials, and checked the rebar and rebar diameter deviation. The deviation of top thread 12, 14 and 16 is within 4. I climbed the stairs several times, and I remember just coming out of the ground when I first came. It took a month to build several floors, which is really amazing. When I was in the basement, I found that concrete had beehives and pits, which was related to the vibration and workability of concrete. Formwork, steel binding, these are very important processes. If the steel bar is bent into a straight anchor, it will also cause problems in the concrete. Combining theory with practice will make my understanding more thorough, and I have really reaped the fruits from theory to practice.
Time: September 20th, 20xx to September 26th, 20xx (week 8)
The Mid-Autumn Festival is coming. To tell you the truth, I miss home, too. It's sad to be away from my loved ones for so long for the first time. But the reality is cruel, who let himself grow up? You can take care of your parents instead of relying on them. Our project secretary organized the Mid-Autumn Festival for nothing and held a dinner on the project. Although this meal is a simple home-cooked meal, it officially makes me feel at home. A group of friends who are away from home get together to talk about their ideals and future. The Mid-Autumn Festival is very touching and reduces their loneliness. This project is like a big family, which makes me feel concerned and enthusiastic. Although the environment here is not good, I am proud to be a member of Chen Chao Youth Commando!
Time: 20xx.9.27-20xx. 10.3 (week 9)
I have been in Wuhai for two months, and I feel much more mature now. Now I have basically mastered the classification of materials and internal strength, and I also want to do my work well through various studies. After the internship, you can master some skills and lay a foundation for future work. This week is the Eleventh Golden Week, but we employees are still working, which is determined by the nature of the construction industry, and we have no rest. Then our project department organized the activity of "Bao jiaozi" to enrich our spare time activities. I also hired Jiaozi, so I studied with them. I didn't expect to learn to recruit jiaozi after work, which is quite interesting. Jiaozi felt particularly proud after cleaning up and eating the fruits of her own labor. I want to go home. I have to show my talent. I have made progress in all aspects here!
Time: 20xx. 10.4-20xx.10.10 (week10)
The weather in Wuhai has changed so much. The temperature is low in the morning, and the heat at noon is unbearable. You can change clothes twice a day, but you can complain or complain, but you should do it well. A colleague of our project has a birthday. We sang a birthday song for him to celebrate his birthday. Everyone is fighting for each other and making the cake all over everyone. I have two pieces on my face. But the more so, the more I want a home, a warm home. During this time, I learned a lot of knowledge and got exercise! And made many new friends!
Time: 20xx.10.1-20xx.10.17 (week 1 1).
This week, I systematically studied the material management manual. On June 38+00. 13, company leaders visited our project to guide the work. Our manager, Mr. Zhou from the Equipment Department, gave me detailed instructions and visited the on-site inspection materials. After I came back, I pointed out the existing problems and the ways to correct them. He also told me the process and precautions of material management, and I learned a lot. I also know my own problems, and I want to correct them in time so that such problems will not appear in my future work. What impressed me most about this investigation is that carelessness is the root of failure!
Time: 20xx.10.18-20xx.10.24 (week 12)
This week, I went to the scene to study the inspection of steel bars. The knowledge of tying steel bars is really great. I think the cutting of steel bars is the most difficult, and it needs knowledge and experience to do it well. In construction, the binding and anchoring of steel bars are particularly important, otherwise the structural performance will be affected. See the foreman upstairs and downstairs, I don't know how many times a day. It's really hard. This also confirms that everyone has worked hard to bring a number of tall buildings!
Time: 20xx.10.25-20xx.10.31(week 13)
The end of the month is coming again, and the work has become busy. There is not much material this month.
After checking with the supplier, I finished warehousing and handed it over to the finance department, and this month's work is almost done. After October, winter came. I don't know what winter is like in Wuhai. It is said that the temperature is not very low, but the temperature difference between day and night is large. Every time I call home, my mother always asks me when I will go home. Considering that I have been away from my parents 100 days, I really miss them. I told myself that I could go home after a while!
Time: 20xx.11.1-20xx.11.7 (week 14)
In this week's time, the main structure of a building was completed. The weather is cold and the construction speed is not as fast as before, but I see that everyone on the project is working hard to finish the main building before the winter shutdown on the premise of ensuring quality.
Now I am studying Guanglianda with my colleagues in the sales department, so that I can broaden my knowledge and prepare for my future work.
Time: 20xx.11.8-20xx.1.14 (week 15).
165438+1On October 8th, our project organized a basketball friendly match between Wuhai, Yinchuan and Erdos. Secretary Qiu, the leader of the company, and Secretary Ding of the Youth League Committee came to our project department. Watch the game with us.
On the field, everyone is a hero and we cheer for them. See yourself sweating, but still insist. I see the spirit of struggle and progress from them. After the game, we took photos to commemorate it. Although we are not the first, friendship is more important. We are all members of the company, with the same goal, and work together for the development of the company!
Time: 20xx.11.15-20xx.11(week 16)
The main structure of the five buildings has been completed in four buildings, leaving only one building 18 floors. We in ministry of materials and equipment are now returning materials to pave the way for next year's work. Let's celebrate this year's efforts together. I sometimes think that the most important thing for a person is whether he is happy or not, not where he is. I think I've become a lot more mature now, and I can think calmly when I meet something. These can show that I didn't come to this place for nothing. These are the footprints of my life step by step!