A, precontrol includes:
1, investigation and analysis of construction conditions;
2, the blue prints.the design of construction and design disclosure;
3. Preparation and review of construction organization design documents;
4, engineering survey positioning and elevation datum control;
5. Selection and qualification examination of construction subcontractors;
6, materials, equipment and parts procurement quality control;
7. Configuration and performance control of construction machinery, equipment and tools.
Second, the control includes:
1, construction technology review;
2, construction survey management;
3. Witness sampling management;
4, technical approval and design changes;
5, concealed engineering acceptance;
6. Others (including quality control approaches and methods formed in long-term construction management practice)
Third, after-the-fact control:
1, finished product protection;
2, construction quality inspection and acceptance.