Matters needing attention in hoisting indoor unit of air conditioner
Because the system structure of central air conditioning is complex, if it is not installed properly, it will directly affect the cooling and heating effect in the later period, and may also cause equipment failure, so we must find a professional company. A high-quality central air conditioning installation team should not only have its own installation design team, but also have skilled after-sales maintenance technicians to solve the intractable diseases of users' air conditioning in time.

Customizable Luffy skills, perfect panel attributes of New World Luffy.

advertisement

The installation of central air conditioning must be ready before decoration. Generally, construction and installation can be arranged after the plumber enters the site, and the indoor unit should be wrapped before installation to avoid dust and impurities. Two problems should be paid attention to when hoisting indoor units. First, the distance between the indoor machine installation and the roof should be reserved to avoid the vibration between the machine and the roof when it is running; Second, the internal machine must be hoisted horizontally and checked and measured with professional tools after installation.

It is worth mentioning that the air return port is usually designed together with the air conditioning maintenance port to ensure the beauty of the later decoration. The size of the air return outlet must be the same as that in the machine, and there can be no dislocation to ensure the air return volume and sufficient maintenance space.