First, the mining industry
Serious "three violations"
1, which shall be applied according to regulations without using the front cross member;
2. Failing to install safety facilities when going up and down the mountain;
3, blasting distance is not enough or other processes parallel operation distance can not meet the requirements;
4, coal winning machine, scraper conveyor and other mechanical and electrical equipment maintenance without power failure locking;
5, at the beginning of the caving face supporting force is not in conformity with the provisions;
6. Top coal caving is not carried out at the initial caving face;
7, coal mining face found signs of flooding, did not take measures;
8, during the operation of coal winning machine, personnel who enter the safety fence for repair (except as stipulated in the regulations);
9. During the loading of the loader, someone stays and works between the wheel and the loader;
10, personnel enter the machine lane when the valve in the working face is running;
1 1, one person prop-pulling unsupervised, or prop-pulling for the first time;
12. Dismantle the shed beam (shed leg), backboard or pillar without authorization and use it for other purposes;
13, working face roof leakage without roof support to continue production;
14. If the scraper fails, the power supply will not be cut off.
15, drilling holes in old holes, residual holes and coal (rock) cracks or standing on the conveyor;
16, geological structural zones such as working face passing through faults, etc. are not provided with special support measures or directly according to regulations;
17, using supporting materials that do not meet the requirements of operation procedures;
18. Before the construction, the system of "knocking on the wall to ask for the roof" was not seriously implemented, dangerous stones and living stalks were not removed in time with long tools, or special personnel were not assigned to observe the roof;
19, single-ended roadway maintenance was not carried out from outside to inside according to the shed (section), and two or more groups of personnel worked at the same time, and personnel entered the single-ended roadway maintenance point;
20, tunneling roadway penetration and through the old alley, the old mined-out area is not in accordance with the provisions, notice of penetration, roof caving, waterproof, gas prevention, shooting injury prevention, harmful gas suffocation prevention, airflow disorder prevention and other measures, or on-site measures are not implemented, there is no specialist command and other related responsible persons;
2 1, dry drilling in coal mining face (except as stipulated by regulations);
22. Other serious "three violations";
General "three violations" behavior
1, working in the coal wall area, without knocking on the roof before work;
2. The coal wall along the umbrella will continue to work if it is not treated;
3. When the dip angle of coal seam is greater than 25, there is no coal retaining plate or gangue retaining curtain;
4. After blasting, the coal wall is not supported by hanging beam in time according to the requirements of the regulations, or the blasting is continued without treatment after the shed is opened;
5. Do not execute the operation sequence of branch first and then return;
6. Failure support was not handled in time;
7. The returned pillars are not fully loaded as required;
8, there are pushing shed, shed, partial help problems are not handled in time;
9. Do not stop the conveyor when removing and installing the coal baffle;
10, the direction of the three-purpose valve is not set as required;
1 1, if the end face distance exceeds, it will not be supported in time;
12, special support is unqualified, prop-pulling, caving;
13, face with picks or other tools instead of unloading handle;
14, the caving in the upper and lower corners of the working face lags behind the regulations;
15, the top coal and bottom coal in the working face are randomly lost, and the floating coal exceeds the regulations;
16, the waste rock curtain is not used as required for the top cutting line;
17, prop-pulling or prop-pulling, single operation;
18, when working, coal help someone move the working face conveyor;
19, there is no pillar or tie rod between the roadway supports supported by scaffolding, and the damage of pillar or tie rod is not repaired in time;
20, wellbore operations without measures to prevent personnel and materials from falling;
2 1. There are "three empty spaces" in the head-on area, and the dangerous shed in the back road is not treated, so the construction will continue;
22. The safety facilities such as the closed metal rope fence of the harrow loader, the guardrail to prevent harrow out of the trough, and the road clamp are incomplete or not used normally;
23. The brake device of the rake loader winch is unreliable, and the operating handle is replaced by other materials;
24. Someone stays or works within the operation scope of the scraper;
25. The rear wheel of the scraper loader is hung on the shed beam, legs, anchor rods or steel belts;
26, with supporting anchor rod, anchor cable, beam, shed lifting or traction materials;
27. When repairing the roadway, there will be great changes; Before replacing the roadway support, the adjacent support was not reinforced first; After the original support was dismantled, the live gangue and dangerous rocks were not removed in time, and the permanent support was not set up in time;
28, tunneling faces open, nest is not in accordance with the provisions;
29. The distance between the excavator and the head-on equipment exceeds the specified limit;
30, JiaPeng support not as stipulated in the measures for gills help top;
3 1, shotcrete roadway failure or unqualified anchor rod untreated, shotcrete closed;
32. Anchorage before initial spraying of bolting and shotcreting roadway;
33. Illegal entry into disrepair roadway prohibited from listing;
34, maintenance roadway erection or dismantling stents, an unfinished and terminate the work;
35, inclined lane maintenance section construction;
36, inclined lane moving harrow machine under someone work or stay when installation;
37. The distance between two parallel repair points is less than 20m.
38, other acts in violation of rules and regulations;
Second, the professional geological survey
Serious "three violations"
1, the coal mining face is not strictly enforced. When in doubt, probe first, then dig, and don't probe.
2, mining face found signs of water inrush did not take timely measures and continue to work.
3. There are mine field boundary, mined-out area, mined-out area, aquifer and water-conducting fault near the coal mining face. No advanced exploration measures were taken.
4. The underground drainage project is not constructed according to the approved design and safety technical measures.
5, all kinds of roadway construction is not in accordance with the provisions, start and return to work notice. Failing to issue a notice of shutdown according to regulations after the suspension of tunneling.
6, after receiving the notice of roadway shutdown, surveyors don't use measuring wires in time to survey head-on.
7. Other "three violations" that are considered serious.
Three, mechanical and electrical transportation specialty
Serious "three violations"
1, live maintenance, relocation of electrical equipment;
2. Dumping protection device;
3. replace the safety socket with a wooden stick;
4. Forced or agreed power transfer;
5, underground did not check the gas concentration before opening the electrical equipment;
6, switch with a wooden wedge or with copper, aluminum, wire hook insurance;
7, wire rope broken rate, wear rate exceeds the standard still continue to use;
8. Handheld electrical equipment does not use isolation transformer;
9, special equipment testing equipment, inspection unqualified, mandatory use;
10, maintenance failure or cleaning mechanical and electrical equipment without stopping or power failure;
1 1, climb the conveyor belt, climb the car, jump the car, and take the scraper conveyor with a hook;
12, inclined lane winch lifts pedestrians during transportation;
13, no measures to transport "Si Chao" vehicles;
14, there are no measures to transport materials by conveyor belt or scraper conveyor;
15. When the safety facilities of "one slope and three gears" are not used in inclined lane transportation according to regulations, or the safety facilities are not complete or intact;
16, inclined lane transportation does not use insurance rope and insurance fork according to regulations;
17, picking hooks and loading and unloading materials in inclined lanes without taking safety measures;
18, overloaded vehicles in inclined lanes.
19, climbing without wearing a seat belt.
20, lifting heavy objects, lifting tonnage is less than the actual tonnage.
2 1, the driver leaves his seat after stopping halfway up the hill.
22. Other "three violations" that are considered to be serious.
General "three violations" behavior
1, do not perform the inspection and discharge system during maintenance;
2, start the mechanical and electrical equipment without authorization;
3. When walking or working on the stopped belt conveyor, the start switch is not locked or unattended;
4. When the conveyor belt is running, replace the idler;
5, coal electric drill, signal comprehensive protection test is not in accordance with the provisions;
6. Do not use insulating tools when operating high voltage;
7. When the machine is overhauled, the start switch is unlocked or unattended or the power failure card is not hung;
8, do not implement the "two votes three system" provisions;
9, do not perform stop sending operation sequence; High-voltage switching operation does not seriously implement the ticketing monitoring system and monitoring review system;
10, power supply system construction is not in accordance with the provisions, hang the ground wire;
1 1. When lifting a heavy object, someone is under the heavy object or the boom, or someone is in front of the heavy object;
12, adjust the setting value of electrical equipment protection without authorization;
13, cable live coil or "8";
14. When overhauling the high-voltage switch or transformer, cut off the circuit breaker without pulling the isolating bolt, isolating the switch, opening the switch, binding, installing insulation board or locking;
15, when working on the cage, there are no umbrellas and railings; When working or climbing in the shaft, tools do not need to be tied with ropes;
16, rope inspection (including inspection), tank inspection and wellbore inspection facilities or records are not standardized;
17, other violations;
Fourth, the general national defense specialty
Serious "three violations"
1, unplanned wind stop;
2. The air volume at the job site is insufficient, and it is forced to produce;
3, destruction, theft, misappropriation of communication facilities;
4. At the same time, in-situ throttle opening causes short circuit;
5, tile inspector off-duty, empty post, missed inspection, fraud;
6, in the location of the gas, carbon monoxide toxic and harmful gas overrun and stop wind area forced operation;
7, man-made local ventilator unplanned stop wind or any stop, local ventilator gas overrun;
8. Push the tanker into the air door;
9, found that the fire and other major "prevention" hidden dangers are not reported in time;
10, dry drilling in coal mining face;
1 1, no measures to enter a dead end;
12. Deliberately erase the record on the "One Ventilation and Three Preventions" notice board;
13, tile inspector found that the gas exceeded the limit, failed to order to stop the operation and report the evacuation personnel, or refused to carry out the forced operation of the gas inspector's evacuation personnel;
14, the return air corner caving in the coal mining face did not cause gas toxic and harmful in time;
15, the winch pulls the car through the air door;
16, the gas was not checked before the electrical equipment was turned on underground;
17. Failing to organize, arrange, handle and report major hidden dangers of "communication and prevention" in time;
18, gas emission does not implement the three principles of "power off, evacuation and power restriction";
19, gas transmission was not checked in the temporary wind stop area;
20, tile inspector is not in the scene succession;
2 1, the card board filled in by the gas engineer is inconsistent with the specification; Inoue gas reports, manuals and billboards are not "three in one";
22. Other "three violations" that are considered serious;
General "three violations" behavior
1. The "general prevention" personnel carry unqualified instruments or instruments that do not operate according to the operating procedures;
2. Failing to evacuate to a safe place in time after the wind stops;
3. No temporary fence was set at the temporary shutdown site;
4, tile inspector is not in the vicinity of the inspection site under the temperature of fresh air to correct the damage of instruments and instruments, and does not report in time, but still insists on working;
5. The tile inspector failed to fill in the gas record and card board in time;
6. When digging a rake or blasting, the distance between the damper and the head-on exceeds the prescribed limit;
7, maintenance of a typhoon door, the other one didn't hang warning signs or unattended;
8, gas sensor movement is not timely, proofreading is not allowed or the error exceeds the specified time to report processing;
9. The damaged ram was not repaired in time;
10, gas portable instrument is not hung in the corner of high gas mining area or coal mining face;
1 1, the caving in the return air corner of the coal mining face lags behind the top cutting line;
12, accounting, statements and records are falsified;
13, shut down the dust-proof valve of the coal conveying point without authorization or use the dust-proof facilities abnormally;
14, failing to carry out dust-proof flushing system according to regulations, causing coal dust to accumulate and float in the sky in the roadway, failing to prevent dust in time;
15, the drainage borehole was not constructed according to the design requirements, and dust prevention measures were not taken during the borehole construction;
16, comprehensive dust prevention measures of coal mining face are not implemented;
17, coal seam water injection effect can not meet the standard forced production;
18, the caretaker of the local ventilator did not conduct the fan disintegration test and hand-over on site;
19, sensor failure, disconnection not handled in time;
20, other acts in violation of rules and regulations;
Five, initiating explosive device specialty
Serious "three violations"
1, blasting, shall not be filled with bubble mud or coal powder, lumps, combustible as hole sealing mud;
2, shooting, paste gun and illegal processing misfire;
3. The remaining explosives and detonators are not returned to the explosive magazine or possession of explosive detonators in time;
4, do not implement the "one gun, three inspections" or "three-person chain" shooting system;
5, do not use mine explosion-proof detonator blasting;
6. The blaster didn't send a signal before blasting; After blasting, the blaster, monitor and tile inspector failed to inspect the blasting site;
7, blasting bus not timely kink or short circuit or disconnection;
8, in a coal mining face using two blasting machine shooting at the same time;
9. Other "three violations" that are considered to be serious;
General "three violations" behavior
1, the detonator for vehicle transportation shall not be less than 100㎜ at the upper edge of the carriage, or the detonator box shall be placed horizontally and vertically; The loading height of explosives exceeds the upper edge of the carriage;
2. The management account card of initiating explosive device is inconsistent;
3. When transporting blasting materials underground, the escort personnel failed to inform the winch driver and the hook workers in the well and underground in advance; Cage transport speed exceeds the specified limit;
4, the blasting materials piled up or stay in the wellhead, bottom hole or other roadway;
5, blasting materials library is not in accordance with the relevant provisions of the management and operation;
6. The detonator fails to conduct primary and secondary conduction or has no conduction record as required;
7. The warehouse keeper failed to approve detonators and explosives according to the blasting instructions;
8, posing as a spear head, did not avoid electrical equipment; Break or damage the detonator crural line; The cartridge is not wrapped with crural line and twisted into a short circuit;
9, after charging, detonator crural line is not suspended; The foot wire is in contact with an electrical conductor such as a device;
10, coal powder or rock powder in the hole shall not be removed before charging;
1 1. Explosives and detonators are not stored separately in special boxes, but placed in unsafe places or warning lines;
12. Blasting operation failed to arrange blastholes, charges, hole sealing and connecting wires according to the blasting instructions;
13. The blaster did not carry the blasting key with him, or did not pull out the key and dismantle the bus immediately after blasting;
14. Before each blasting, do not check the total resistance of the electric explosion network;
15, the blasting face did not perform once assembly and once initiation;
16, coal piles are reserved during blasting in coal mining face;
17, the blasting bus is not hung or kept at a distance of more than 0.3m from the cable and signal line;
18, the hole depth is not enough or the length of the mud can not meet the requirements;
19, the successor transports blasting materials during going up and down the well;
20, hole depth is less than 0.6 meters, there is no special blasting measures or not full of stemming;
2 1, the detonator was not turned over in time;
22, blasting collapse shed column untreated and continue blasting;
23, before and after the shooting did not check and collect the lost or unexploded detonators and explosives;
24, packed without firing handover is not clear;
25. Lending detonators and explosives;
26, no reverse charge blasting measures;
27, near the blasting site within 20 meters of the gas concentration in the wind reaches 65438+/-0.0% to continue blasting;
28, before and after the blasting operation does not perform sprinkler dust;
29, head-on within 20 meters, coal, gangue or other objects blocking roadway section more than 1/3 blasting;
30, other acts in violation of rules and regulations;
VI. Public * * *
Serious "three violations"
1, without safety measures to arrange construction;
2. Arrange employees who fail the procedures and measures for production study and testing;
3. The preparation procedure is inconsistent with the site or the preparation of examination and approval procedures is in violation of regulations;
4, safety facilities are not complete, forcing workers to work;
5, to resist or report illegal command, stop illegal personnel to take revenge;
6. There are hidden dangers in the construction site that are not handled, forcing workers to work;
7. There is no training arrangement for special types of work;
8. Disobeying management, beating and abusing safety management personnel who perform their duties normally;
9. Destroying or stealing safety production facilities, materials and equipment;
10, organize production or operation without safety operation license;
1 1, the person responsible for all kinds of major hidden dangers;
12, work after drinking;
13, privately carrying fireworks and firecrackers into the well or smoking and using kindling in the no-fire area;
14, other "three violations" that are considered serious.
General "three violations" behavior
1, sleeping and fighting in class; Failing to implement the handover system when the fixed post is off duty or on duty;
2. Don't wait in line for cans and cars when going up and down the well. If you are strong, grab it;
3. Entering key places without a license;
4. Allow others to enter key places;
5, when crossing the conveyor belt, don't walk across the bridge;
6, not in accordance with the provisions, wear self-rescuer;
7. Wear chemical fiber clothes to go down the well;
8. Failing to send signals according to regulations, or carrying people in cages or driving overcrowded;
9. When people are driving in drift and inclined lane, the protective chain (door) is not hung (closed);
10, smoking or other fire sources within 20 meters of the wellhead;
1 1, untrained general post or undocumented special post;
12, wellhead and underground personnel do not wear safety helmets or take off safety helmets at will;
13. Dismantle the miner's lamp at will;
14, miner's lamp and self-rescuer failed to be returned in time after going down the well;
15, the driver does not operate according to the specified signal;
16. Management personnel do not stop or report violations when they find them;
17, not in accordance with the regulations and measures, causing hidden dangers;
18, the production site changed and the supplementary safety technical measures were not revised in time;
19, failing to wear instruments or issue unqualified instruments as required;
20, the use of unqualified supporting materials and unqualified protective equipment;
2 1, failing to install fire-fighting facilities and equipment as required;
22. Failure to report personal accidents or non-casualty accidents in time;
23, other acts in violation of laws, regulations and relevant provisions;
24, other acts in violation of rules and regulations.