The development and construction of Changxing Island is of great significance for undertaking international industrial transfer, promoting the revitalization of old industrial bases in Liaoning and Northeast China, and promoting a new round of development in Dalian. Changxing Island has very rare conditions and foundation for port construction and port industry development. Under the overall situation of Liaoning's revitalization and national development, we should carefully examine the development of Changxing Island and make a good development plan for Changxing Island according to world-class standards. According to the idea of strengthening independent innovation, changing the mode of economic growth and developing industrial clusters, we will plan the port-facing industrial zone, vigorously develop major equipment manufacturing and petrochemical industrial clusters, and promote port development with port-facing industries. According to the requirements of leap-forward development, plan and implement a number of major projects with overall situation and strong driving force, save land resources to the maximum extent and leave enough space for future development.
The state has strict control over land resources, and the ports in Dalian are very crowded at present. If there is no sustainable port, Dalian will have no room for enterprise development. Therefore, Changxing Island Harbor Industrial Zone is the transfer of Dalian port and an important port site for Dalian's sustainable development in the next few decades after Dayaowan Port Area. "In the construction site of Dalian Changxing Island Lingang Industrial Zone, despite the roar of vehicles and the beating of waves, the voice of Yi, deputy director of Changxing Island Lingang Industrial Zone Management Committee, is very penetrating.
Changxing Island in the middle of Bohai Sea coastline is an important part of Liaoning's "Five Points and One Line" strategy. The reporter saw in the fiery construction site that the reclamation project of digging mountain port is drawing to a close, and a huge modern wharf has begun to take shape.
In front of the huge industrial park planning map, Yi introduced the general situation, advantages, development planning ideas, construction progress and work plan of Changxing Island to reporters in detail. The previous relocation project has been completed, and the 3 1 1,000 square meter resettlement community has been put into use. The future Changxing Island Harbor Industrial Zone will be a large-scale specialized deep-water port and harbor industrial cluster based on heavy chemical industry, and will eventually become an important combined port for Dalian to build a shipping center in Northeast Asia and a free trade zone among China, Japan and South Korea.
According to the preliminary planning, the development area of 15 Changxing Island Harbor Industrial Zone is 129.7 square kilometers, including 2 1. 1 square kilometers in the port area, 7 1.7 square kilometers in the industrial zone, 36.9 square kilometers in the residential and tourist area and 50 square kilometers in the starting area. Construction of equipment manufacturing industrial zone and fine chemical industrial zone. At present, China Development Bank has established a financing platform scheme for industrial parks and provided huge soft loans.
Current development and construction situation: all residents within 50 square kilometers of the starting area have been relocated and resettled, and the starting area has become a pure land. The overall planning of the port industrial zone, the planning and design of ports, industries and cities, and the planning and design of railways and expressways have been completed. Island-wide surveying and mapping, hydropower planning and environmental assessment have been basically completed. There are two general bulk cargo berths of 70,000 tons and150,000 tons and 10 berths running through Changxing Island Port from east to west.