Summary of personal work of repairman
Maintenance personnel entering the equipment must receive safety education before maintenance, so that maintenance personnel can know the possible dangerous factors and countermeasures in the maintenance process. The following is a summary of the personal work of the repairman that I sorted out for you. If you like, you can share it with your friends around you!

Personal work summary of repairman 1

Before the start of this overhaul, the responsible overhaul content was planned and arranged in detail, and the preparation work was more comprehensive and perfect.

First of all, the preparations for this overhaul: In order to ensure the smooth progress of the overhaul, we go to the site in advance to familiarize ourselves with the work content and site conditions and prepare safety measures, safety protection articles and safety tools. Fill in the hydraulic machinery working ticket and dangerous measures at dangerous points before work, and explain the field work, safety measures and precautions to the team members. Arrange and plan the safety measures and precautions in the work site and work ticket, and distribute the work reasonably. Safety instruments needed in preparation: hammer, 36# wrench, 36# sleeve and booster, jack, wood square, feeler gauge, power cord, work lamp, signboard, flashlight, screwdriver, lubricating oil, shelf board, woven bag, rain boots, etc. Get safety protection articles and use them correctly and safely.

Secondly, the maintenance work begins:

(1) Check that the unit at the work site is in shutdown state, the tailrace gate has fallen, there is no pressure or water in the volute, and the butterfly valve has been closed.

(2) Open the butterfly valve and repair the valve to ensure that there is no water or pressure in the volute.

(3) Connect the power cord and the working light, and use tools such as hammer, hammer, 36# wrench, 36# sleeve, booster rod, jack, wood square, etc. Remove the screw and nut of the volute manhole, open the volute manhole, ventilate before entering, fix the shelf for entering the volute, bring flashlight, feeler gauge and woven bag, and put on rain boots to enter the volute.

(4) Check whether there are sundries in the volute of 1#, 2# and 3# units, clean up the sundries and garbage in the volute in time, and put them into woven bags.

(5) Check the guide vanes of 1#, 2# and 3# units. During inspection, carefully check each guide vane item by item, and check the dirt and corrosion on the runner and pipe wall in detail. Measure the gap between each guide vane with a feeler gauge. Vertical requirements of guide vanes: No line 5 is allowed to pass through the gap, and some guide vanes are required to be within line 15, 65438. Chapter requirements: meet the requirements of drawing production process parameters, and record and analyze the found problems and measured data.

(6) Check whether there are any left-over items in the volute, and close the volute into the door after confirming that there are no left-over items.

(7) Clean up the sundries and rubbish in the collecting well, check that the six drainage pumps are running normally, and check whether there is any blockage of rubbish and sundries, and clean up the blocked sundries.

During inspection:

(1) 1#, 2# and 3# units are lubricated again due to cracks in the screw nut and gasket lubricating oil in the manhole.

(2) 1 # unit's inner flow channel and pipe wall are seriously fouled and corroded, which should be polished and painted in the next overhaul project.

(3) There is a lot of garbage in the volute of Unit 2, which needs to be cleaned up in time in the future work.

(4) The guide vanes in the volute of Unit 3 were seriously damaged and hit by hard objects, so it is necessary to strengthen monitoring and inspection in the future work and maintenance.

(5) In the process of cleaning up and checking the garbage in the collecting well and the drainage pump, it is found that there is water backflow when the 5# drainage pump stops working, and it is judged that the check valve is abnormal, and post-treatment.

(6) In the process of assisting Comrade Tian to supply gas to Unit 2, the oil level dropped rapidly, the automatic gas supply device leaked gas, and the pressure distribution valve leaked oil, so it was post-treated.

(7) Assist Comrade Tian in hoisting the tailrace gates of 1#, 2# and 3# units, and find that the manhole of the volute of 1# unit is leaking. After re-reinforcement, there is no leakage.

(8) It is time-consuming and laborious to disassemble and assemble the connecting rod of the tailrace gate, and it needs to be maintained in the later work.

After the work, dismantle the safety measures taken at the site, remove the working power supply, return the safety instruments, clean up the health of the work site, and handle the work of ending the working ticket.

Finally, the matters needing attention and shortcomings in this overhaul process:

(1) In the process of removing the screw, be careful that the screw, sledgehammer and sleeve fall and hurt the foot surface.

(2) When entering the volute, due to the slippery wall, attention should be paid to prevent slipping and injury.

(3) In the process of adjusting the gap between the guide vanes, prevent hands from being caught between the guide vanes.

(4) In the process of work, the preparation work is not perfect, and the screws and nuts removed at the work site are not properly placed. In the future work, prepare the goods storage box to prevent the goods from falling and hurting people.

(5) In the process of inspection, some technical problems and problems found were not fully analyzed, so we need to strengthen our study in future work.

(6) In future work, tools should be used safely to prevent accidental injuries caused by improper use of tools.

Summary of personal work of repairman II

From 20 to 2000, the maintenance task of the company was successfully completed and the workshop gradually returned to normal operation. With the active efforts and cooperation of workshops, departments and outsourcing units, the annual maintenance task issued by the company was completed ahead of schedule, so that the feeding production went smoothly ahead of schedule.

First, the preparatory work for early maintenance

Before the overhaul, the leaders defined the project leader, overhaul leader and outsourcing unit in the overhaul project, and implemented the overhaul project step by step. Managers at all levels should arrange construction forces reasonably according to the specific conditions of maintenance projects. For maintenance projects, after many review meetings, a major maintenance project plan was finally issued, and every project was known to the construction unit in detail to prevent safety accidents and maintenance quality problems. The preparation work before the overhaul has truly achieved the responsibility to the people, the task has been put in place, and each has its own responsibilities, which has made comprehensive preparations for the smooth completion of the overhaul goal.

Second, the main work during maintenance

As a member of the Equipment Department, my main job during the overhaul period is to be responsible for inspection and maintenance projects:

① Inspection and maintenance of hoisting machinery in refining workshop, sulfur workshop and slag separation workshop;

② Maintenance of air compressor, oxygen compressor and turboexpander in oxygen production workshop; And the replacement of vacuum pump unit b and motor;

(3) Replacement of supporting wheel bearing bush of 2# and 3# converters in refining workshop;

(4) Removal and restoration of heat preservation of high-temperature fan, electrostatic precipitator and waste heat boiler in matte workshop.

⑤ Make daily maintenance reports and maintain meeting minutes.

In the end, the maintenance project I was responsible for was completed as required at the end of the maintenance, and there was no delay in production when I started the car. After the product was put into production, it was not reworked or affected due to unqualified maintenance quality.

In the process of maintenance, I have been earnestly performing my duties, and every car has carefully checked the maintenance quality according to the maintenance items to ensure that every car after maintenance will not have any quality problems. In the process of maintenance, the frequent use of traffic in the main workshop brings great difficulties and dangers to maintenance, and safety protection measures need to be taken. Through the active coordination between the workshop and the construction units, a security cordon was set up in the maintenance area, which ensured the safety of on-site construction and successfully completed the maintenance task. During equipment maintenance, I always make sure that every project I am responsible for can be coordinated with the workshop and outsourcing units in advance. During the period from the beginning to the end of the maintenance, I voluntarily gave up the rest time, and never took time off for personal reasons during the maintenance, so I devoted myself to the maintenance work for the unit. At the beginning of the overhaul, I was worried that my lack of coordination would affect the project progress and the overall overhaul progress of the company, so I kept my best condition and actively coordinated. Finally, I successfully completed this task through my own efforts and the full cooperation of leading colleagues of all units in the company.

Third, the maintenance experience

During this overhaul, I always kept in mind the concept of safety first, strictly implemented the company's safety regulations and handled various work tickets, and successfully completed the overhaul task with the cooperation of the workshop and the construction unit. I have enriched my experience and remembered the lessons brought by carelessness in the process of project tracking, talking with professionals, on-site learning and on-site maintenance. In my usual work, I will do my daily work well first, and often communicate with the technicians in the workshop under the condition of ensuring the completion of all daily work, study hard, constantly enrich myself, solve practical problems encountered in production, and better complete all the work entrusted to me by the company and departments. The maintenance work in 2000 has been successfully completed. In the future work, we will continue to carry forward the good achievements, correct the shortcomings, and strive to do better maintenance work next year. ?

Summary of personal work of repairman 3

The year 2000 passed in the busy and orderly work. Looking back on this year's work, I think there are two main aspects:

First of all, make your own work guidelines:

1, so that every job is operated according to the safety standard process to prevent safety accidents;

2. Visit the store at least once a month, communicate with the store management in time for the problems found in the inspection, solve them directly on the spot, and feed back the problems raised by the store to the department leaders in time, do the work that needs to be done well in the shortest time, find them in advance and solve them quickly, so as to nip in the bud;

3. Adjust the circuit decoration work of the shop, make plans in advance, prepare materials, resolutely not delay the shop decoration, and ensure high-quality and efficient completion of the work;

4. Communicate with the store by telephone in view of the sudden problems of electricity facilities, initially estimate where the problems are, and lead relevant personnel to prepare related objects and tools so as to quickly troubleshoot after arriving at the scene;

5. Adhere to the principle of saving: try to repair the damaged items in the store without replacing them with new ones, choose the ones that really need to be replaced with high quality and low price, and collect and sort out all kinds of reusable materials (such as plugs, etc.). ) for reuse;

Second, the main work in the past year:

The main work in June 65438 was the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket. In a month's time, I took the initiative to take the lead, carefully studied with my colleagues in the equipment department, strictly laid out the layout and standardized the construction, and ensured that the opening of Tianbang Supermarket and the adjustment of Haitan Supermarket were completed on time and with good quality.

In February, the main work was the renovation and opening of major appliances in Xin 'an Shopping Plaza. Due to the tight time, there are many places where home appliances need electricity, and it also involves the layout and construction of brands and booths. According to the company's requirements and work flow, we worked overtime and meticulously, so that all the electricity facilities were successfully installed and the water test was successful at one time, which made good preparations for the smooth opening of home appliances in Xin 'an Shopping Plaza on May/KLOC-0.

From March 6 to September, it was mainly the renovation adjustment of the East Building of the head office and the preparation for the opening of Zhuoting Supermarket. The reconstruction of the East Building of the Head Office is the biggest project this year, involving many facilities and heavy workload. The replacement of escalators, the adjustment of circuits, the decoration of suspended ceilings, the follow-up of the decoration of various characteristic pavilions, and the arrangement and follow-up of electricity consumption in characteristic pavilions all require equipment. So I have to work overtime every day for three months, but I am not intimidated by fatigue and workload. I carry forward Nakazawa Tomohide's spirit of not being afraid of hardship and tiredness, work actively and conscientiously, and complete all the tasks assigned by the company with clear thinking, and make my own contribution to the decoration of the East Building of the head office. In September, with the renovation of the East Building, there were preparations for the new store Zhuoting Supermarket. Originally, the equipment department was understaffed, and the stores near the Mid-Autumn Festival were also busy, and no one had to be transferred. Facing the work, we have a group of equipment people who are not afraid of difficulties and prepare all the equipment needed for opening in time in strict accordance with the company's requirements. For facilities that need electricity, from the lighting of the main light strip to each socket that needs to be used, the installation of UPS and the electricity construction of tenants are carefully put in place. After unremitting efforts, we successfully completed the transformation of the East Building and the opening of Zhuoting Supermarket.

The main work after 4.9 months, in addition to the daily shop patrol, part of the maintenance work that shops need is to make a statistical summary of the water pipes that need to be insulated in winter in advance, and handle all the water pipes that need to be insulated in each shop to prepare for winter. Another major task is to sort out idle equipment. All the idle shelf equipment and accessories are concentrated in Liuhuapo's equipment warehouse, and everything is sorted out for standby.

In the new year, we will continue to carry forward the spirit of Nakazawa Tomohide, strictly abide by the company's safety operation norms and various management regulations, and complete all the work in a timely, safe, efficient and economical manner under the guidance of leaders.

Summary of personal work of repairman 4

In order to strengthen the management of audio-visual education and improve the application level of audio-visual education equipment, according to the work arrangement, the audio-visual education information center carried out lectures, research, general survey and maintenance, special room training and other work in primary and secondary schools in the middle and late September. In this activity, we investigated more than 40 schools, listened to 24 audio-visual classes and distributed survey questions.

More than 45 volumes, maintenance of audio-visual equipment 150 sets. The situation is summarized as follows:

First, leaders attach importance to it and the system is sound.

Most school districts and public schools can understand the importance of audio-visual education, and the school has formulated audio-visual education, school-level information technology training plan and professional room management system in combination with teaching practice. In this activity, most principals can actively prepare, and carry out their work in the form of research or lectures in view of the existing problems, and implement the responsibility of people and bind them, which has received good results.

Principals accompanying the investigation of audio-visual equipment include: Zhang Shunping from Southern Oriental School District and Xiangcaiying School District, Pang from Xiangcaiying Middle School, Feng from School District, Han Yubin from Ni Xinzhuang Middle School, Li Shitao from Baihe School District, Chen from Liuyuan Middle School, Zuo Jin from du cun School District, Shen from Gou Wei Middle School and Guo Aiyun from No.2 Primary School. The vice principals who accompanied the class were:,,, Li, He Jingyan,, Liang Shuli, Liu Jiang, etc.

Second, the equipment management is in place and the use is standardized.

Audio-visual equipment in most units can be used, registered and fixed in designated rooms.

Asset sequence, designate a person to be responsible for management. The special classroom equipment has good protection, high utilization rate and detailed use records, which gives full play to the role of audio-visual teaching equipment. Number and classify the audio-visual equipment, register them one by one, and establish an "ID card". Audio-visual teaching resources in most units can be continuously enriched on the original basis, and the utilization rate has been greatly improved. The professional quality of professional room managers has been greatly improved in their work.

Units with good equipment management work include: Zhang Cun School District, South Oriental School District, Zhang Liji School District, Gou Wei School District, Hunan Cuisine Camp Middle School, Liuyuan Middle School, Xingkai School, etc. Schools with high equipment intact rate and utilization rate are: No.4 Middle School, No.4 Primary School, Brick Camp Middle School and West Lamb Middle School.

Schools, etc. Schools with high equipment intact rate and utilization rate are: No.4 Middle School, No.4 Primary School, Brick Camp Middle School, West Lamb Middle School and Yougeliu Middle School.

Third, information technology teaching has a good order and a strong atmosphere.

Most schools can offer information technology courses above grade three according to the requirements of the information technology syllabus. Information technology teachers can arrange courses with lesson plans and exercises after class. The computer classroom has a computer register with detailed records, which are consistent with the teaching progress. In the classroom, students are scrambling to answer questions, working in groups, and teaching methods such as "one-on-one" and "excellent with poor grades" create a good learning atmosphere.

Information technology courses are offered in South Oriental School District, Zhang Liji School District, Xi Lamb School District, Zhang Cun School District, Baihe School District, Xingkai School, No.1 Primary School and No.4 Primary School. Strong sense of responsibility and professional ability.

Teachers with better teaching results are: Zhang Haishan, Yucai School in Southern Oriental School District, Li Yue, Zhang Hui School in Xiangcaiying School District, Meng Qingke, han cun Middle School in Sun Tao School District, Zhang Chunming, West Lamb Middle School in Zhang Cun School District, Niu Libin, the first primary school, and Wang Gai, the second primary school.

Four. Existing problems and phenomena

1. The leaders of individual units don't know much about audio-visual education, and there are no corresponding management systems and measures. The main manifestations are: no work plan, no special classroom system, incomplete files and incomplete records. Insufficient attention is paid to audio-visual knowledge training and the use of audio-visual equipment, and the measures are ineffective. Some leaders can use it more or less, dare not use it, refuse to use it, and are afraid of using it badly and wasting electricity.

2. Equipment management in individual schools is not in place. For example, the equipment of the special room is not used, misappropriated and borrowed, the sanitation of the special room is poor, and even the roof of some units leaks rain, and the equipment is "bathed".

3. In the maintenance of audio-visual teaching equipment, some schools have the idea of "waiting for help", and the damaged equipment can't be repaired in time and can't provide services for teaching normally.

4. Some schools don't offer information technology courses, or there are fewer computers and more students, so students can't operate on computers in class, and some teachers let students operate on computers for too little time.

5. A few managers and information technology teachers have low professional quality and their basic skills need to be improved.

All units should combine the requirements of this activity on the composition of audio-visual workers, conscientiously sum up, further raise awareness and check.

Find out the shortcomings, re-improve the audio-visual education management system, take effective measures, do a good job in information technology teaching, ensure that audio-visual education equipment can serve education and teaching normally, give full play to the advantages and functions of audio-visual education equipment in "strengthening teachers' abilities and innovating classrooms", and strive for a new level of audio-visual education in our unit.

Summary of personal work of repairman 5

Equipment is a project that can prolong the operation cycle of equipment and minimize the common failure rate. , with the spirit of "intensive repair and careful inspection" and excellent intermediate maintenance team.

The team has 1 senior workers, 3 intermediate workers, and employees are junior workers. When the morning shift was just established, our team leader spent two months training and practicing the details and requirements of the work, and backing up and restoring the skills of employees, such as agm, tvm and bom. After the opening of Line 3 and Line 4, we trained the equipment of Line 3 and Line 4 for one month, and the knowledge of employees can quickly adapt to the local environment wherever they go.

In July and August, the monitor of each inspection and maintenance worker went to their class for internship in batches. In the course of work, valuable suggestions for improvement are put forward for the work and management of this shift. Whenever I make a suggestion, I collect notes, which is the best communication bridge with my investigation.

I will hold a regular shift meeting twice a month. Before the regular meeting, I will make a summary of the meeting of this class and pay attention to the work in these two weeks. Moreover, the shift management blog created on Sohu website involves the summary of shift meetings and the theory of shift management, which can share the experience, technology and management of shift management with others and strive to integrate humanized management into shift management.

After 6s work, I study 6s articles, 6s cognitive level and cultural application. Now, the team has introduced 6s content, such as standardization and layout of tools, standardization of computer files in the team, and identification of folders, tools, consumables, spare parts and lockers.

It is worth mentioning that every time I go to Deng Yiting's afc testing workshop in Zhujiang New Town, I have a lot of inspiration for 6s work! It is the sexual arrangement of electronic documents of mobile computers. In addition to classifying documents and files, it also lists the pictures of computer files stored in several shift computers, which can clearly display the electronic documents of this computer and blindly search the data to be entered into the report.

Because of the large number of shifts, a shift activity was held every month last month, which reflected the friendship between colleagues and the work of employees. Every activity is fine.

I hope that in-middle school, we can carry forward and improve the management of the team, so that all employees in the team can feel a healthy and warm family.

Related articles on personal work summary of repairman:

★ 4 short articles summarizing personal maintenance work.

★ Personal Annual Work Summary of Maintenance Workers in 2020

★ Selected models of the latest personal annual work summary of maintenance workers.

★ Summary of individual annual work of workshop maintenance class workers.

★ 20 19 machine maintenance personal work summary 5 articles

★ Five personal work summaries of equipment maintenance

★ Personal Annual Summary of Maintenance Worker

★ See personal work summary of maintenance personnel.

★ Maintenance worker's annual work summary is 9 minutes.

★ Summary report of personal work of maintenance worker