I have worked hard in equipment design and manufacturing, and have four years of on-site work experience.
work experience
1 pressure vessel manufacturing process preparation, vessel manufacturing process preparation, welding process preparation, heat treatment process preparation, construction organization design, construction scheme preparation, HSE,
2. Proficient in CAD drawing, familiar with pressure vessel design, construction lofting, pressure vessel manufacturing material declaration, and familiar with GB 150 ASNE.
Three on-site technicians of static equipment maintenance in refineries are proficient in static equipment manufacturing process, static equipment maintenance process and control points, have participated in several refinery maintenance, and are familiar with static equipment maintenance procedures. Familiar with static equipment design specification in petrochemical industry, familiar with maintenance procedures. Understand different types of electrostatic equipment, operation principle and performance.