Year-end summary is an applied style in which people review and analyze their work and study in the past year, find out their experiences and lessons, and draw regular knowledge from them to guide their future work and practical activities. What I bring to you here is the 202 1 year-end personal work summary template for machinists. Welcome to learn from it!
Personal Work Summary of Mechanic —— In 20 years, the company continued to implement refined management to achieve the goal of reducing consumption and increasing efficiency. In strict accordance with the company's policy and objectives, the Mechanical and Electrical Department actively completed the task of equipment maintenance and technical transformation, which ensured the smooth completion of the company's production tasks in 20__ _, and laid a solid foundation for the production in 20 _ _ _. Further improve the overall level of equipment management of the company. Summarize the work in 20__ years as follows:
First, team management.
1, safety is more important than Mount Tai, always remember "nip in the bud"
Publicize and emphasize safety operation through weekly team leader meeting: there must be a guardian for aerial work; Must be equipped with safety protection articles; Regular inspection and maintenance of aerial work vehicles; Regular inspection of special equipment. Through everyone's efforts, no major safety accidents occurred in the Equipment Department for 20__ years.
2.6S management
Standardize employee behavior by formulating rules and regulations and employee assessment system. In daily work, organize the team leader to learn, emphasize the team cleaning and hygiene management, and formulate the daily cleaning duty shift schedule, implement the responsible person, so that everything is managed, and fully mobilize the initiative and sense of responsibility of each employee.
Second, the equipment management
1. Conduct routine maintenance inspection on workshop equipment every month. Supervise employees to operate the equipment in strict accordance with the operating procedures at any time, put an end to illegal operation, and require on-site rectification when hidden dangers are found; The workshop is required to keep the daily maintenance records of the equipment.
2, equipment maintenance and repair work
(1) Attach importance to maintenance and reduce maintenance.
According to the established equipment maintenance plan, the company has comprehensively carried out the second-guarantee maintenance of cranes, rotary rolling equipment in culvert workshops, assembly production lines, mixing equipment and steel bar straightening equipment. , so that hidden dangers can be found in time and completely eliminated, and the completion rate of second insurance can reach 100%.
(2) The maintenance of key equipment should be repaired in time.
It is required that the maintenance personnel must arrive at the site within 5 minutes when repairing the equipment in the assembly workshop, coordinate the workshop to arrange the operators to cooperate with the maintenance personnel to repair the equipment in the shortest time, and conduct on-site supervision to ensure the maintenance quality and successfully complete all the maintenance work.
(3) Management of special equipment
Improve the account of pressure vessels and lifting equipment, cooperate with the quality inspection department to complete the regular inspection of pressure gauges and safety valves, and conduct regular inspections according to national standards.
(4) forklift management
The daily maintenance system of forklift trucks has been re-improved, and the safe operation and daily maintenance of forklift operators have been further standardized. Supervise the forklift workers to maintain and lubricate the forklift every week through regular weekly inspection. Those who violated the operating rules were punished accordingly, and there were rules to follow.
3. According to the hidden dangers found in daily inspection and maintenance, the equipment maintenance work was rectified, and the 800T bending machine, shearing machine and stamping workshop in container workshop were repaired. After rectification, the equipment is used normally.
4, parts management
Clean up and count the equipment and accessories of the whole plant, formulate the minimum inventory of equipment and accessories, communicate and coordinate with ministry of materials and equipment, and connect with ministry of materials and equipment system to ensure that accessories are in stock at any time, thus ensuring the timeliness of production and maintenance this year.
5. The company's safety and quality standardization has reached Grade II.
In August, 20 _ _ _, the company started the standardization of safety and quality to Grade II, and the personnel of mechanical and electrical department, together with various workshops and departments, actively completed various rectification projects of equipment and facilities within four months, laying a solid foundation for the company to successfully reach Grade II. The company successfully passed the second-class standard project.
Equipment management is a long-term management process, in which we need to constantly learn new ideas of equipment management. In the past 20 years, there have been achievements and shortcomings in equipment management. Through my own continuous exploration, I gradually realize that the current situation of the company's equipment urgently needs to actively promote the management mode of equipment spot inspection. According to this goal, in the 20__ year work, we will constantly improve our business level, management ability, adaptability and innovation ability, and actively prepare for the company to complete its production tasks and improve its equipment management level in 20__ _.
The second part is about the maintenance of the company's equipment and facilities. The company has experienced 15 months of wind, frost, rain, snow, heat and winter since its trial operation in _ _ _ _. Under the leadership of the company's management team, we broke through many obstacles and ushered in the vigorous development of aviation food in Xinjiang today. As an ordinary employee, I can participate in this magnificent masterpiece. After more than a year of extraordinary course, my life is no longer ordinary. Because of this, in my usual work, I have been actively studying corporate culture and professional skills, edifying myself with corporate culture, improving my ideological consciousness, arming myself with professional skills and improving my business level. With the care and guidance of leaders and the support and help of colleagues, we overcame the difficulties in the maintenance team, carried forward the excellent moral character of loving our posts and dedication, quickly entered the role, made outstanding contributions to the normal production of aviation food in Xinjiang, and our work performance was recognized by the company.
I. Work content
1. Inspection, tracking and maintenance of problems left over from project construction.
2. Ensure the safe operation of equipment and facilities, strengthen the safety inspection and maintenance of facilities and equipment, work out a work plan, implement the planned content, completion time, responsible person and inspection time, and clarify the key points of each work to ensure the safe operation of facilities and equipment.
3. Strictly control the operation of equipment, and strive to save energy and reduce consumption. In terms of energy conservation,
The main work this year is to strengthen the maintenance of equipment, control the running time and parameters of equipment and environmental requirements, so as to achieve the purpose of saving energy and reducing consumption.
4. Pay attention to the management of fire fighting equipment and facilities. Through our own efforts, we maintained the fire-fighting equipment, conducted a comprehensive inspection of the fire alarm linkage system, listed each alarm probe, and tested it point by point to find out the problems. Perform maintenance and troubleshooting.
5. Make annual maintenance work plan and maintenance work standard.
6, cooperate with the finance department, establish the minimum inventory of warehouse engineering materials, ensure the supply of maintenance materials.
7. In daily work, maintain the safe operation of equipment, strengthen self-safety awareness, and put an end to industrial accidents.
Second, the work performance
1, central air conditioning
Our company shared two carrier air conditioning hosts on the 20th. I checked on the roof and found that two air-conditioning hosts kept calling the police, and the fault could not be eliminated. During the inspection, I found that the pressure self-protection pot of No.2 air conditioner main unit burst, which led to the failure of No.2 air conditioner main unit, automatic water supply system and frequency converter. After I contacted Lu Weidong, the after-sales engineer and equipment manufacturer, they made a detailed inspection of the main engine of air conditioner 1, and found that the stainless steel plate in the unit cracked and the refrigerant liquid in the compressor refrigeration system leaked. The pressure self-protection pot of the main engine of No.2 air conditioner will burst when the water circulation system of air conditioner is unstable. Solution: 1 It is necessary to add 0.5 cubic meters of high-level water tank and high-level floating ball automatic water supply and exhaust water tank to solve the problems of unstable water circulation system, pressure difference, endless exhaust and never water shortage. 2. Buy 4 bottles of refrigerant. 3 Replace the board with a new one. The cost of water tank is 3,000 yuan, the refrigerant is 20 yuan, the plate replacement is 65,438 yuan+09,000 yuan, and it is delivered from the original factory in the United States, and the labor cost is 3,000 yuan, freight and so on. The total is 30,000 yuan. However, our equipment has passed the warranty period. After many consultations with the constructor and the manufacturer, the manufacturer is willing to solve all the problems of air conditioning through after-sales service. Now the main air conditioner has been repaired. Save the company 30,000 yuan in maintenance costs.
2, special garage shutter door
Our company's special garage is used to park food delivery trucks. Because of the failure of the shutter door, the shutter door can't rise, which affects the entrance and exit of the dining car. Because this shutter door is large in area and high in height, we don't have scaffolding as a climbing facility. We need to hire a professional company to repair it outside, but the professional company charges too much. On the premise of saving maintenance funds for the company, my colleagues and I finally overcame the problem of no scaffolding climbing equipment and insufficient manpower. After 14 hours of fighting, the problem that the shutter door can't be lifted was finally solved, the technology was improved, the maintenance experience was increased, and 3,000 yuan was saved for the company.
3. Problems left over from the project
In the first half of the year, the problems of rain leakage on the roofs of main production workshops, special garages and warehouses were effectively solved, and the problems of rain leakage and grounding on the roofs of two cables of hot kitchen equipment were effectively solved. The special garage and warehouse should be waterproof again, and the two cables of the hot kitchen equipment should be replaced with new cables.
4. Fire control system
The integrity rate of fire alarm linkage system and fire water supply system shall be kept above 95%, and the failure-free rate of fire alarm probe shall be kept above 98%.
5. On the basis of last year's work, this year's maintenance team made a detailed maintenance plan for facilities and equipment, which was broken down to every month, and detailed maintenance contents and standards were formulated and implemented, ensuring the quality and efficiency of the work.
Through the efforts of the past year, although some achievements have been made, we still need to continue our efforts to keep pace with the times. I will constantly sum up and reflect, constantly spur myself, enrich myself, improve my personal quality and professional level, adapt to the development of the times and enterprises, make progress and grow together with the company, and make greater contributions to the brilliant tomorrow of the company.
In the third part, with the support and help of the company leaders and departments, and with the joint efforts of my colleagues, I successfully completed the functional work of the department according to the requirements and deployment of the company. Through one year's study and work, the working mode has made a new breakthrough and the working mode has changed greatly. The work of the Maintenance Management Office in the past year is summarized as follows:
First, the daily management of the management office.
Since the company implemented the "three decisions" and the sub-management office, this has become a brand-new field of our work. The management office is an important window department of the company's residential property service image, a daily maintenance, management and service organization under the leadership of the general manager's office, and a guarantee department to promote all work to the company's established goals.
The work of the management office mainly includes daily complaint handling, fee leasing, infrastructure equipment maintenance, environmental sanitation, greening maintenance, water and electricity maintenance and security. There are manuscript processing, file management, manuscript approval and delivery, meeting arrangement, study and training, inspection by higher authorities, visits from other units, guidance, etc. In the face of a large number of complicated and trivial daily work, we have strengthened our work consciousness, paid attention to speeding up the pace of work, improving work efficiency, calmly handling various affairs, and strived to be comprehensive, accurate and moderate, avoiding omissions and mistakes. So far, we have basically achieved all our goals.
Second, the daily complaint handling and maintenance work
1, handling complaints.
In the whole year, 1432 complaints were accepted, 1420 complaints were handled, and 12 complaints were being processed, with a handling rate of 99%. Among them, there were 647 complaints about water and electricity, 49 complaints about house maintenance1piece, 30 complaints about security doors and unit doors1piece, and 64 complaints1piece.
In the whole year, the complaints mainly focused on 1, 2, 10, 16# roof building residents leaking water, the owners of buildings 2 and 7 complained that the construction noise of building 3 disturbed people, and the owners of buildings14 complained that the hotel room played mahjong at night and there was no roof garden. The owners of buildings 16 and 17 complained about the cooking fume and noise of the hotel, and buildings 18 complained about the noise of the kindergarten and the cooking fume. Most of them have been dealt with, but the owner of 18# building reported that the lampblack and noise in the kindergarten still exist. After coordination with the person in charge of the kindergarten, the kitchen has been relocated and has been significantly improved.
2, charging work.
The annual fee collection work was successfully completed. Except for a few owners who refused to pay for some reason and the property was vacant, all the fees receivable have been recovered. The leasing work is also completed by quality and quantity, which can make full use of resources, revitalize funds as much as possible and generate income for the company.
3. Daily maintenance.
This year, according to the work plan made by the company at the beginning of the year, the maintenance, environmental sanitation and greening of infrastructure such as Xinxing Garden, Cuizhu Garden, Xiangzhou Garden and base camp were successfully completed.
4. Environmental sanitation.
In terms of maintaining landscaping, cleanliness and hygiene, we constantly improve and change management methods, and try our best to make landscaping intact, clean and tidy. There are no green pests, no deaths and no plant diseases in the area all year round, creating a comfortable and warm home for the residents in the area.
5. Water and electricity maintenance.
Mainly responsible for water and electricity maintenance and daily management of 35 houses including Xiangzhou Garden, Xinxing Garden, Cuizhu Garden, Group Company Headquarters, Hutian Garden and Shengzi Warehouse; The annual average monthly loss rate of hydropower is 2.2-2.8%, which is strictly controlled within the allowable range; Four power distribution rooms, five elevators, two booster pumps and fire-fighting facilities in the area are operating normally, and no safety accidents have occurred.
6. Decoration management.
According to the work arrangement and plan at the beginning of the year, the decoration management has gradually entered the formal track this year. The new decoration service agreement and management regulations compiled by the company have been implemented, which reasonably blocked the loopholes in the previous imperfect decoration management, implemented the daily patrol registration system, and handled the problems in time when found. The phenomenon of illegal decoration has been significantly reduced and declined, and there have been no safety accidents and major complaints caused by violations.
7. Safety management.
This year, the safety work is generally good, and no fire or robbery accidents have occurred in the area. However, in the second half of the year, a car was stolen. Fortunately, the case was solved and the stolen vehicle was recovered. Therefore, there should be no negligence, paralysis and luck in safety work, and more efforts should be made in the access management of foreign personnel and vehicles to avoid similar or more serious accidents.
Third, strengthen study and improve professional level.
Because I feel the burden of this department, and the knowledge, ability, experience and position of some employees in the office are far from each other, I have been afraid to treat it lightly. I ask all employees to strengthen their professional knowledge, learn from books, learn from leaders around them and learn from colleagues, so I obviously feel that there has been some progress this year.
Through continuous learning and accumulation of experience and knowledge, everyone has a certain working foundation and can deal with various problems in daily work. After one year's training, their organizational management ability, comprehensive analysis ability, coordination ability and written and oral expression ability have been greatly improved, which ensures the normal operation of all work, can treat all tasks with a correct attitude, love their jobs, and strive to implement them in practical work. Actively improve their professional quality, strive for the initiative in work, have a strong sense of professionalism and responsibility, and strive to improve work efficiency and quality.
Four. Existing problems and future efforts
Over the past year, our employees have been able to work conscientiously and creatively, and have made some achievements, but there are also some problems and deficiencies, mainly in the following aspects:
First, most of the staff of the management office are not property professionals, and a lot of work is done and groped, so that sometimes it is not easy to do it, and the work efficiency needs to be further improved.
Second, some work is not detailed enough, and some work coordination is not in place.
Third, the theoretical level of relevant majors is not suitable for the requirements of the company's work.
Fourth, the number of vehicles is increasing, and the roads in the residential area are full of vehicles, which brings great security risks to pedestrians and vehicles. The main reason is the serious water leakage in the central underground parking lot, with a total of 125 parking spaces, of which 53 parking spaces are leaking, and the owners are unwilling to stop.
Fifth, the water and electricity losses in the base camp, Xinxing Garden and Cuizhuyuan are serious, mainly due to the aging and corrosion of pipeline meters and lax daily inspection management, which leads to serious theft, leakage, running, leakage and dripping.
Sixth, at this stage, many property infrastructures under our jurisdiction have passed the warranty period, and the expenses incurred are now borne by property, real estate and engineering companies.
Seventh, at present, the property management fees of Cuizhu Garden and Xinxing Garden under our jurisdiction are relatively high, and there are losses, mainly due to the small scale of the property and the relatively large investment in human and material resources. This kind of property is also an obstacle to the company's benefit growth, which is not conducive to the company's development.
20__ is also my second year working in the engineering department of _ _ Property Co., Ltd. During this year, I was able to abide by the law, study hard, study hard, be conscientious and conscientious, and played my due role in the operation and maintenance post, making contributions, which are mainly summarized as follows:
A, dedication, solid work, to assist the leadership to complete the receiving work.
This year, according to the company's work arrangement, I was transferred from _ _ to the operation and maintenance group of _ _ news center in _ _ month, engaged in electrician maintenance. In the process of post change, I can take care of the overall situation and obey the leadership; During the receiving period, carry out the instructions of the leader, carefully check the handover project in charge, report the abnormal, damaged and faulty equipment as soon as possible, require the original unit property to be handled in time, and assist the leader to do the receiving work well.
Second, be familiar with the geographical location and equipment of computer rooms and electrical rooms in various regions.
When I first came to the news center, I was completely unfamiliar with the environment and equipment here, and the original Baihua Property did not cooperate. So I have explored, thought and summarized a lot of things based on my past experience, plus some experienced masters from _ _ _ _ _ _ personally explained, trained and sorted them out. Now I am here to explain the geographical location, central air conditioning system, high and low voltage circuit system, fire protection system, domestic water and landscaping system.
Third, do a good job in the operation and maintenance of central air conditioning and high and low voltage circuit systems.
For central air-conditioning, the central air-conditioning should be reasonably controlled according to the customer's demand, season and weather, and the operation records should be kept. All parameters should be carefully looked at. If any abnormality is found, the reasons should be analyzed and reported, and the maintenance unit should be informed to deal with it quickly. In terms of maintenance, the original property company did not do any maintenance work on the original central air-conditioning system, which led to rust damage on the inner wall of the refrigeration system. According to the arrangement of the leader, the requirements of the leader are strictly implemented, the maintenance supervision of the external unit is strengthened, and the special supervision of the dispatcher is followed up. It is required to clean regularly every week and add medicine regularly every month. Any place that is not in place for maintenance is required to be dealt with immediately to prevent the maintenance personnel of the external unit from being careless and causing further damage to the cooling system, and to ensure the normal operation of the air conditioning host.
On the other hand, under the formulation of _ _ supervisor, the surfaces of the machine room floor, main air conditioner, cooling pump and freezing pump are cleaned monthly according to the requirements of the personnel on duty, and the bearings of the cooling pump and freezing pump are regularly maintained with snow oil. For high and low voltage systems, the maintenance work of high-voltage maintenance units has been strengthened, requiring inspection twice a week, and problems found should be handled in time. When the low voltage side just took over, the contactor line of No.2 capacitor compensation cabinet in the public power room was loose, which caused the phase line to touch the cabinet shell and burned the contactor to ground. According to the arrangement of the leaders, all the contacts in the capacitor compensation cabinets of all power rooms were comprehensively reinforced, and defective capacitors were replaced, so that the public power rooms were strictly implemented. And cleaning the electric wells on all floors, strengthening the contacts, replacing the damaged indicator lights, etc. , and regularly clean the floors of all electrical rooms to ensure that the equipment runs in a good environment.
Fourth, conduct central air conditioning training for operation and maintenance team members.
Under the arrangement and support of the leader, I gave a brief explanation to the staff of the operation and maintenance group about the central air conditioning. Some employees who are unfamiliar with air conditioning or have never been exposed to air conditioning have received little effect, their expression ability and self-confidence have been greatly improved, and their understanding of air conditioning has been further strengthened. Thank you for your trust and support.
Five, do a good job in the management of class members, and do a good job in the task of calling for repairs by superiors and news organizations.
I set an example by asking my class members to abide by the company's laws and regulations, not to be late or leave early, to strengthen the responsibility training of class members, and to make good records of equipment inspection and operation. Arrange work reasonably according to the schedule of superiors, mobilize class members and deal with them quickly. Listen carefully to the call from the news center, and record the calling unit, call content and fault location. , quickly mobilize the whole class to deal with it quickly, and carefully explain and report the major failures or problems that cannot be handled to customers.
The above is mainly the main work in the past year, which is gratifying and needs to be improved. I am glad that I have been the head of the team here, and I have little management experience. Moreover, I learned a lot of knowledge and skills in the process of receiving, and what I need to improve is management level, interpersonal relationship handling and technical skills, so I will definitely work harder to get to a higher level next year.
Personal work summary of machine repairman 5. In the busy work, 20 years passed quickly. With the care and help of leaders and colleagues, I have given full play to my work skills, and through my continuous efforts, my work and business level have made great progress. Continuously improve working methods and improve work efficiency. Summarize the past and learn good work experience. Let me summarize all the work in the past 20__ years:
1, working conditions
Our main job is to cooperate with maintenance, emergency rescue, spare parts collection, or clean up the garbage, scrap steel and old spare parts left over from on-site production and maintenance. Can complete the tasks assigned by the leader, check spare parts quickly and safely, and clean up. Sometimes equipment maintenance can cooperate with maintenance work with heart. When the equipment maintenance is busy, most of them are fighting at work for more than 0/4 hours a day. Because the car use plan is not standardized and the demand is tight, they have to run back and forth in the workshop hundreds of times every day, sometimes it takes a long time to fix it, and they can't rest after working overtime. In addition, my car is noisy, the cab temperature is high and the heat dissipation is poor, so the whole person is like taking a bath. Moreover, under the working environment of narrow road surface and poor road conditions in our workshop, we all have no complaints, can treat them correctly, work hard and complete various tasks seriously.
2. Security aspects
At work, we can consciously and strictly demand ourselves, consciously abide by labor discipline and safety operation rules, seriously study traffic regulations, and strictly abide by traffic regulations and factory rules and regulations. Earnestly complete their own work, so as to achieve the safety production policy of sounding the alarm, putting safety first and putting prevention first. It plays a preventive role. There were no illegal accidents and no duty throughout the year. Under the condition of ensuring driving safety, we have achieved: study hard and constantly improve safety quality. As a driver, I try to make the motor sound, concentrate, turn the steering wheel and pay attention to safety. Although the driver's job is monotonous, he needs a strong sense of responsibility and cannot be careless when driving. He should concentrate on driving a good car, always want to be safe, prevent accidents everywhere and be safe.
3. Respect discipline and discipline
Strictly abide by the rules and regulations formulated by the company, do not fight, steal, do anything that will damage the corporate image, respect leaders, unite colleagues and work hard. Concentrate on work, do not violate labor discipline and factory rules and regulations, take the factory as the master and safeguard the interests of enterprises.
4. Main problems and next steps.
I. Main issues
1, lack of serious work, lack of initiative, and little understanding of unsafe factors in the workshop.
2. Due to the poor road conditions, narrow roads and many intersections in our workshop, there are overspeed behaviors caused by unsafe factors.
3, vehicle maintenance, maintenance, repair and other work is not in place.
Second, the next step.
1. In the new year, we have to deal with the production of two engines, which is twice as busy as this year. Then we must do our job well, do not overspeed, overload and other illegal acts, ensure safe production, and strengthen the maintenance, inspection, repair and maintenance of vehicles. Only good maintenance can ensure safe driving. It brings favorable conditions for the needs of production and maintenance.
In the new year, we should study the traffic laws and regulations harder and strengthen our self-safety awareness. We should correct our shortcomings, unite as one, do our own work well, strive to better complete the tasks assigned to us, and strive for a higher level of military work.