This tender document is a model. When bidding, the bidder shall prepare the bidding documents according to its own actual situation, bidding documents, pre-qualification instructions for bidding applicants and other documents. The tender document consists of three parts: the tender letter part, the commercial part and the technical part.
Engineering construction bidding
bid document
Project number:
Project name:
Contents of bidding documents: The letter of tender is a part of the bidding documents.
Bidder: (Seal)
Legal representative or entrusted agent: (signature or seal)
Date: Year Month Day
bid document
catalogue
I. Identification certificate of the legal representative ........................................................................................................................................................................
Two. Power of attorney for signing bidding documents .....................................................................................................................................................................
Three. the letter of tender
Four. Appendix to tender letter
Verb (abbreviation of verb) Bank guarantee format of bid guarantee 5
Intransitive verb bid guarantee
Seven. Other bidding documents required by the bidder in the bidding documents. .................................................................................................................................................................
bid document
I. Identification certificate of the legal representative
Unit name:
Unit nature:
Address:
Date of establishment: year month day.
Operation cycle:
Last name: gender: age: position:
Is the legal representative of (bidder's company name).
This is to certify that.
Bidder: (Seal)
Date: Year Month Day
Model bidding documents for housing construction and municipal infrastructure construction
Second, the bidding documents signed a power of attorney
This power of attorney states: I (name) am the legal representative of (name of authorizer), and I hereby authorize (name of my company) to sign the tender documents of this project as the legal representative of our company, and I acknowledge that the agent has full authority to sign the contents of the tender documents of this project on my behalf.
The agent has no right to entrust, and hereby entrusts.
Agent: (signature) Gender: Age:
ID number: Job title:
Bidder: (Seal)
Legal representative: (signature or seal)
Date of authorization: year month day.
bid document
Third, the letter of tender
To: (Name of Tenderee)
1, according to the project bidding document with the project number of your project subject to tender, following the < < People's Republic of China (PRC) Bidding Law > > and other relevant regulations, after surveying the project site and studying the bidding instructions, contract terms, drawings, engineering construction standards, bill of quantities and other related documents of the above bidding documents, we are willing to bid in (currency, amount and unit) (in figures) according to the above drawings.
2. We have carefully reviewed all the bidding documents, including the revised documents (if any) and relevant attachments.
3. We acknowledge that the appendix to the tender letter is an integral part of our tender letter.
Once we win the bid, we promise to complete and hand over all the projects within the calendar days of the construction period stipulated in the contract agreement.
5. If we win the bid, we will submit the above-mentioned bank guarantee of% of the total price or the performance guarantee issued by a guarantee institution with guarantee qualification and ability as the performance guarantee.
6. We agree that the submitted bid documents are valid within the bid validity period specified in Article 15 of the Instructions to Bidders. If we win the bid during this period, we will be bound by this.
7. Unless another agreement is reached and takes effect, your letter of acceptance and this tender document will become an integral part of the contract document binding both parties.
8. Together with this letter of tender, we will submit (currency, amount and unit) as a bid bond.
Bidder: (Seal)
Unit address:
Legal representative or agent: (signature or seal)
Postal code: Tel: Fax:
Bank name:
Bank account number:
Bank address:
Bank phone number:
Date, year, month and day
Model bidding documents for housing construction and municipal infrastructure construction
Four. Appendix to tender letter
The contents of serial number items are the same.
Remarks on agreed contents of clause number
1 performance bond
bank guarantee
The amount of performance bond is ()% of the contract price.
()% of the contract price
2 construction preparation time () days after signing the contract
3. Overdue default amount () yuan/day
4. The delay compensation limit is ()% of the contract price.
5. Time limit for a project in advance award () yuan/day
6. The total duration () calendar days
7 quality standards
8 engineering quality () yuan
9 ()% of the advance payment amount of the contract price
10 The amount of advance payment guarantee is ()% of the contract price.
1 1 progress payment time () days after the monthly payment voucher is issued.
12 payment time for completion settlement () days after the issuance of payment voucher for completion settlement.
13 The warranty period is subject to the period agreed in the warranty.
Four. bid document
Verb (abbreviation of verb) Bank guarantee format of bid guarantee
(The specific format is provided by the guarantee bank)
Model bidding documents for housing construction and municipal infrastructure construction
Intransitive verb bid security
To: (name of bidder)
According to this letter of guarantee, (name of bidder), as the principal (hereinafter referred to as "bidder") and (bid guarantee institution) and as the guarantor (hereinafter referred to as "guarantor"), shall jointly undertake the responsibility of paying (currency, amount and unit) (in figures) to (name of tenderer "), and both bidders and guarantors shall be bound by this letter of guarantee.
In view of the fact that the bidder participated in the tender of the tenderer (project subject to tender) on, this guarantor is willing to provide the bidder with a bid guarantee.
The conditions of this guarantee are as follows: If the bidder receives your letter of acceptance within the validity period of the bid;
1, unable or refusing to sign the contract agreement as required by the instructions;
2, can't or refuse to submit the performance bond according to the provisions of the instructions;
3. Withdraw the bid documents within the bid validity period.
As long as you specify the conditions of any of the above situations, this guarantor will pay you all the above money after receiving your written request, and you don't need to provide enough evidence to prove your request.
The Guarantor is not responsible for the following amounts:
1, exceeding the amount specified in this guarantee;
2. The difference between the bidder's bid price and the tenderer's bid price.
The guarantor hereby confirms that this guarantee is valid within 28 days after the bid validity period or the extended bid validity period. If the bid validity period is extended, there is no need to inform the guarantor, but any payment request should be delivered to me within the above bid validity period.
Guarantor: (seal)
Legal representative or entrusted agent: (signature or seal)
Address:
Postal code:
Date: Year Month Day
bid document
Seven. tender bond
: (name of construction unit)
Our unit accepts your invitation to participate in the project bidding.
According to the requirements of the tender documents, our company now submits a bid bond of RMB.
(In words: whole)
The conditions of this guarantee obligation are:
(a) If the bidder withdraws the bid within the bid validity period specified in the bid;
(b) The bidder receives the bid-winning notice issued by the construction unit within the bid validity period;
(1) Fails or refuses to sign the contract agreement in accordance with the provisions of the Instructions for Bidding;
(2) Failing or refusing to provide the performance bond according to the provisions of the Instructions.
(three) in violation of the provisions of the relevant laws and regulations on bidding.
The tenderer has the right to confiscate the bidder's deposit.
If the bidder fails to win the bid, it can return the tender documents and attached drawings, and the tenderer will return them at the same time.
Refund of bid bond. (interest-free)
Bidder (official seal)
Legal representative of the tendering unit (signature and seal)
Date: Year Month Day
Eight, the tender documents require bidders to submit other bidding materials.
(This item has no format, and will be put forward in writing by the tenderee if necessary).
Format of commercial part of bidding documents
Engineering construction bidding
bid document
Project number:
Project name:
Contents of bidding documents: commercial part of bidding documents.
Bidder: (Seal)
Legal representative or entrusted agent: (signature or seal)
Date: Year Month Day
bid document
Catalogue (in the form of comprehensive unit price)
(This part is subject to the requirements of the tender documents and the format of the bill of quantities settlement software)
A, the tender offer description
Second, the tender offer summary table
Three. List of main materials and quotation sheet
Fourth, the equipment list quotation sheet
Verb (abbreviation of verb) bill of quantities quotation sheet
Intransitive verb measures and project quotation sheet
Seven. Quotation list of other items
Eight, the bill of quantities project price calculation table
9. Other materials required for tender offer.
bid document
A, the tender offer description
1, this quotation is compiled according to the bidding instructions of this project and the relevant clauses of the contract text.
2. The comprehensive unit price and average price filled in the bill of quantities valuation table include all expenses such as labor cost, material cost, machinery cost, management fee, profit, tax and risk fund calculated for fixed-price projects.
3. The quotation of measure items shall be filled in the price list of measure items. Including the expenses incurred by the measures that must be taken to complete the construction of this project.
4. The prices of other projects filled in the price list of other projects, including other expenses necessary to complete the construction of this project except the price list of bill of quantities and the price list of measures.
5. The unit price and total price shall be filled in for each item in the quotation sheet of this bill of quantities. Engineering expenses without unit price and total price shall be deemed to have been included in other unit prices and total prices in the bill of quantities.
6. The currency of this offer is
7. The bidder shall submit the matters that need to be explained in the tender offer together with the tender offer form in written form.
Format of technical part of bidding documents
Engineering construction bidding
bidding document
Project number:
Project name:
Content of bidding documents: technical part of bidding documents.
Bidder: (Seal)
Legal representative or entrusted agent: (signature or seal)
Date: Year Month Day
catalogue
A, the construction organization design
Second, the project management institutions equipped with the situation
Three. List of proposed subcontracted projects
A, the construction organization design
1, the bidder shall prepare the construction organization design, including the basic contents of the construction organization design specified in Item 1 1.4 of Volume I of the tender documents. The specific requirements of compilation are: when compiling, the construction methods of each division and sub-project should be explained with words and charts; The main construction machinery and equipment to be invested, labor plan, etc. ; According to the characteristics of the bidding project, practical measures are put forward for the project quality, safe production, civilized construction, project progress and technical organization. At the same time, corresponding technical measures are put forward for key processes and complex links, such as construction technical measures in winter and rainy season, technical measures to reduce disturbing noise and environmental pollution, and protection and reinforcement measures for underground facilities such as underground pipelines. In addition to written expression, the organizational design shall be accompanied by the following charts, tables and formats.
2, the construction organization design in addition to text expression should also be attached to the following chart, chart and format requirements attached.
2. 1 List of main construction machinery and equipment to be invested
2.2 Labor Schedule 1.2
2.3 Network diagram of planned commencement and completion date and construction progress 1.3
2.4 construction site plan 1.4
2.5 Temporary Land Use Table 1.5
(1) List of main construction machinery and equipment to be invested
(Project Name) Project List 1. 1
order
No. Mechanical or
Name, model, specification, quantity, country of origin and manufacturer of the equipment
Remarks on the annual rated power (KW) production capacity used in the construction site
(2) the labor schedule
(Project Name) Project List 1.2
Unit: person
According to the types of labor input in the construction stage of the project
Note: 1. The bidder shall submit the estimated labor schedule including subcontractors in the listed format.
2. The timetable is based on 8-hour working hours per shift.
(3) Plan to open the completion date and construction progress network.
Table 1.3
1, the bidder shall submit the construction progress network diagram or construction schedule, and indicate the key construction date according to the construction period required by the tender documents. The winning bidder shall also submit a detailed construction progress plan according to the requirements of relevant clauses in the contract conditions.
2. The construction progress plan can be represented by network diagram (or crossing diagram), indicating the planned commencement date and completion date of each stage of each subdivisional work and the date of signing the subcontract.
3, the construction progress should be adapted to the construction organization design.
(4) Construction site plan
Table 1.4
The bidder shall submit the general construction plan, draw the layout of temporary facilities on site, and attach a text description to explain the situation and layout of temporary facilities, processing workshops, on-site offices, equipment, warehousing, power supply, water supply, sanitation and living facilities.
(5) Temporary land use table
(Project Name) Project List 1.5
Use area (m? ) Positioning takes time.
total
Note: 1. The bidder shall fill in this form item by item, indicating the land area of all temporary facilities and their detailed uses.
If this form is not enough, attach another page.
Second, the project management institutions equipped with the situation
(1) Project Management Organization Configuration Table 1.6
(2) Resume of Project Manager 1.7
(3) Resume of technical director of the project 1.8
(4) Data sheet of project management organization's auxiliary explanation (1.9)
(1) Configuration Table of Project Management Organization
Table 1.6
(Project Name) Project
work
affairs
surname
name
work
It means that the practice or professional qualification certificate has undertaken the construction in progress.
Certificate name level
Number of projects of the original professional service unit with special license number, main projects
name
Once our unit wins the bid, it will implement the project manager responsibility system and be equipped with the above-mentioned project management institutions. We guarantee that the above information is true. If it is not true, we are willing to accept it in accordance with relevant regulations. The organization and division of responsibilities of the project management team are attached.
(2) Resume of the project manager
(Project Name) Project Progress 1.7
Name, gender and age
Professional title education
Number of years as project manager during working hours.
Project manager qualification certificate number
Situation of projects under construction and completed
The project name, construction scale, completion date and quality of the project under construction or completion of the construction unit.
(3) Resume of technical director of the project
(Project Name) Project List 1.8
Name, gender and age
Professional title education
Working hours, years as technical director.
Situation of projects under construction and completed
The project name, construction scale, completion date and quality of the project under construction or completion of the construction unit.
(4) Auxiliary explanatory materials for the equipment of the project management organization.
(Project Name) Project List 1.9
Note: 1. Auxiliary explanatory materials mainly include the organizational setup of the management organization, division of responsibilities, copies of relevant certification materials and materials that the bidder considers necessary. There is no uniform regulation on the format of auxiliary explanatory materials, which are designed by the bidders themselves.
2. The auxiliary materials of the project management team are attached (bound together with this tender document).
Three. List of proposed subcontracted projects
(Project Name) Project List 1. 10
Name and address of subcontractor
Business operation of the legal representative
Number by qualification grade
Certificate number
Proposed subcontract
The estimated cost of the main content of the project (ten thousand yuan) has been done.
Similar project