Summary of water supply and drainage professional work
Friends engaged in water supply and drainage, do you know how to write your own work summary? The following is a summary of my carefully prepared water supply and drainage professional work. You can refer to the following!

Summary of water supply and drainage technology 1 I studied in Building Environment and Equipment Engineering from 20XX to 20XX. After graduation, I have been engaged in technical management and construction of water supply and drainage engineering in Jiayin county public utility management station 1 for many years, and I love this major very much. With the rapid development of modern science and technology, I keep learning new technologies and theories, and guide my work with new management level. The technical summary of my major during my study and work in school in recent years is as follows:

I. Political Thought and Work Attitude

Take an active part in political study, support the party's principles and policies, consciously abide by all laws and regulations, be conscientious and responsible, have good organizational skills, have a strong sense of teamwork, work hard, have a strong sense of responsibility, strictly perform job responsibilities, be proficient in professional job responsibilities, and be able to better complete the tasks assigned by the unit.

Second, professional theoretical knowledge

During my school days, I systematically studied the theoretical knowledge of building water supply and drainage, heating and ventilation, air conditioning and electricity, successfully completed the practical teaching content set by the school to improve our professional skills, read a lot of related books in my spare time, and actively participated in various internship contents, all of which achieved good results. During my work, I have always insisted on learning professional theoretical basis and professional knowledge. In terms of engineering quality management, I will further study and study the development trend of domestic water supply and drainage engineering, and study harder in the future work, constantly improve the ability to coordinate technical problems of various professions, and implement the national guidelines, policies and regulations on scientific and technological work.

Three. Work experience and ability

20/kloc-joined the work in August/April, and worked in the water supply and drainage and heating management office of Jiayin County Public Utilities Administration. During my work, I was mainly responsible for the external network drainage project of buildings, and participated in the organization and implementation of the external network drainage project of new buildings in the court, the external network drainage project of new buildings in Jiayin County No.2 Middle School, the external network drainage project of new buildings in Jiayin County Border Inspection and the external network drainage project of new buildings in Jiayin County Hospital. The above projects * * * pipeline laying. Mainly responsible for the technology, quality and construction progress in the construction process. From May, 2065438 to May, 2004, combined with the reconstruction of Prosperous Street and Xincheng Street Road, new drainage facilities, 126 rainwater outlet and new public toilet drainage project, the pipeline was laid for 300 meters. Be conscientious and responsible in the construction process, and work hard. On the premise of ensuring quality, complete all tasks arranged by leaders on time. I have improved and made progress in all aspects, which is the summary of my professional and technical work in recent years. In the future, I will continue to learn all aspects of professional knowledge, continue to carry out research and discussion in the field of water supply and drainage, and aspire to make greater contributions to the public cause in the future.

Summary of water supply and drainage construction technology 2 1. This project is a single building with a total construction area of 1439.53m, building height of 1 1.950m, overhead floor height of 2. 15m, floor height of 3.9m, floor height of 4.6m and total land area of 2877.

Second, the implementation of project management:

1. Preparation before construction: supply and arrange equipment, materials, labor, machinery and technical force according to the prepared construction progress plan. According to the construction procedures, organize the construction teams to hold meetings to disclose the general situation of the project, construction methods, construction technology, construction procedures, project handover points, project quality, safety rules and regulations, safety technical measures, and implement the fatal goal of post and personnel safety.

2. Implementation of construction progress control: The construction progress plan reasonably adjusts our material supply, construction progress, construction process intersection and arrangement of labor and technical force according to the actual situation of civil engineering and decoration, and makes major adjustments to the progress plan at the end of each month according to the actual progress and situation to meet the needs of the overall progress plan.

3, the implementation of construction quality control:

3. 1 field equipment, materials, accessories, etc. According to the construction progress plan, timely supply with good quality and quantity. Before warehousing, relevant professionals should check whether they meet the national inspection and test standards, and only allow warehousing with product certificate and test report to prevent unqualified products from warehousing and use. During the construction of the project, the design requirements and the requirements of the Code for Quality Acceptance of Building Water Supply, Drainage and Heating Construction (gb50242-20 14) implemented by the state are strictly implemented, the principle of quality first and prevention first is adhered to, and the cycle of implementation, inspection and treatment is implemented, and the three-level acceptance system of the company is strictly implemented.

3.2 In view of the common quality defects in the installation of water supply pipes, our department has formulated a series of measures to eliminate some common quality defects, especially the installation of water supply pipes in toilets. In our department, the water supply pipe is laid along the bathroom beam or wall and protected by bricklaying, which effectively solves the problem that the water supply pipe needs to be embedded in the column to damage the structure. Buried pipes in the wall are also dug and laid, which greatly reduces the damage of drilling to the structure.

3.3 The project department realizes that the correct reservation of drainage pipe sleeve is the basis for the smooth installation of drainage pipe. In order to ensure the accurate position of embedded casing and prevent dislocation or damage in the process of civil concrete pouring, the finished product should be protected before civil concrete pouring, and at the same time, special personnel should be assigned to track it during pouring, check the paper surface to prevent omission, and make hidden acceptance records to ensure the smooth installation of drainage pipes.

3.4 During the construction process, according to the actual situation on site, reasonable arrangements shall be made for crossover operation and crossover construction to improve the project progress. Major engineering changes on the construction site, construction schemes, technical measures and design change notices shall be implemented after being approved by the relevant units, and the problems raised by the quality management department and the quality and safety problems we found in the inspection shall be summarized and analyzed, and corrective measures shall be formulated, put in place and recorded to prevent similar problems from happening again. Do not meet the requirements of the specification, according to the "unqualified control procedures". We will try our best to solve the coordination problems raised by the construction units in the shortest time, and some major problems will be solved through the coordination between the supervision department and related majors.

4. Acceptance of sub-projects: the water pipe system is subjected to water pressure test, which meets the national industrial pipeline construction standards, and the next working procedure can only be carried out after the equipment and installation meet the current relevant national standards.

Unqualified processes should be reworked until they are qualified, before the next process can be constructed. All parts and subdivisional works shall strictly carry out the three inspections of self-inspection, mutual inspection and handover inspection, and organize the construction unit to hold a regular meeting every week to summarize the implementation of quality, progress, safety and civilized construction and preventive measures.

5, engineering data control is complete, in line with the requirements of relevant specifications, advocate material comes into play with a certificate of approval, inspection report, material recheck 100% qualified.

6. According to Code for Quality Acceptance of Building Water Supply, Drainage and Heating Construction (gb50242-20 14). The project was rated as qualified.

Summary of water supply and drainage design technology 3 He successfully completed his studies in June 20xx, graduated from Wentian College of Hohai University, majoring in water supply and drainage, and participated in water supply and drainage design in February 65438. It's been almost two years now. After all kinds of experiences, I realized the pleasure of learning useful things and felt the professional value. The design work in recent years is summarized as follows:

I. Political thoughts

Actively participate in political study, support the party's principles and policies, and consciously abide by various laws and regulations; Serious and responsible, with good organizational skills, strong sense of teamwork, practical work, strong sense of responsibility, strict performance of job responsibilities, skilled professional job responsibilities.

Second, the work attitude

I love my job, can treat every job correctly and seriously, abide by labor discipline seriously, make effective use of working time, stick to my post, and need to work overtime on time to ensure that the design work is completed on time.

Establish a correct working attitude. Work in strict accordance with the company's rules and regulations; I love my job, have a strong sense of responsibility and dedication, take the initiative to study professional knowledge seriously, have a correct working attitude and be serious and responsible.

Third, professional theoretical knowledge

Four years' professional knowledge study in the school is not proficient, but it is still useful, at least it can play the role of a guide. Every time you receive a design project, you can clearly know where to start consulting what materials. Water supply and drainage design needs to be proficient in various specifications and understand each specification.

Only in this way can we have a proper combination with reality. So from the first design of contact, I have been constantly understanding and remembering. After several years of project training, I have been able to independently complete simple building water supply and drainage design.

Fourth, work experience.

Design projects, regardless of size, have the same process. For water supply and drainage designers, it is necessary to know every wall, window and other related positions on architectural drawings. In order to achieve this goal, in addition to reading more relevant drawings and consulting others, the most direct way is to look at things related to real life, such as rain outlets on every street, municipal fire hydrants, and the direction of Ming pipes in completed buildings. For things that are difficult to touch in daily life, such as fire water cranes and fire water curtains, search related pictures on the Internet and discuss the design of water supply and drainage. The drawings are all designed according to specifications. The selection of different pipes, the calculation of different pipe diameters, the distance between pipes and buildings, the selection of septic tank models and the layout of rain outlets are all stipulated, so it is necessary to memorize the specifications. I will read relevant norms as soon as I have time, and actively participate in the study and training of relevant norms. What is not in the specification depends on the ingenuity of the designer. These seemingly simple questions, such as which direction of the pipeline is shorter, how to set the fire hydrant more conveniently, and where to put the fire extinguisher more conveniently, are actually not so simple as far as the whole project is concerned, because there are many pipelines, which need to be considered as a whole and every detail should be rigorous.

Another technology that must be mastered in water supply and drainage design is the use of drawing software. Tianzheng water supply and drainage is a very convenient software, just use a little. Rapid use accelerates the whole workflow. Now the speed is still average, still learning, still making progress.

Verb (abbreviation of verb) abstract

The above are some experiences that I have explored in my work practice. Through working practice, I have deepened my understanding of the water supply and drainage industry; Learned professional knowledge that books can't learn; Develop serious and rigorous work habits; Cultivate my hard-working spirit; Further enhanced the communication and coordination ability. Water supply and drainage industry is an industry with deep knowledge and wide knowledge, and there is no end to learning. In the future work, I will study harder the professional knowledge of water supply and drainage, constantly practice and summarize, manage the water supply and drainage work as my own business, and strive to create a bright future for the water supply and drainage industry!