Current location - Education and Training Encyclopedia - University rankings - Second Military Medical University Re-examination
Second Military Medical University Re-examination
The Second Military Medical University, the full name of which is "China People's Liberation Army Second Military Medical University", is a national key medical university directly under the General Logistics Department of China People's Liberation Army to train medical professionals and health management cadres for the army, and it is also one of the key construction institutions of the national "2 1 10 Project".

The Second Military Medical University was founded in September 1949, and it is called "People's Medical College of East China Military Region". 1950 was renamed as Shanghai Military Medical University; 1951July was officially named as the second military medical university.

Review system

1. Objective: To establish a sample reinspection system to ensure the accuracy and fairness of the test results.

2. Scope: It is applicable to reinspection of samples with abnormal test results and objections raised by enterprises.

3. Content 3. 1 The reinspection is generally conducted by two inspectors (designated by the director of the inspection room) other than the original inspector. The original inspector re-examines, and the director of the inspection room must attend, and the inspectors are parallel. Re-inspection is required under any of the following circumstances, (1) when the inspection result is close to the critical value specified in the standard or the discrete data is easy to cause misjudgment; (2) When there are abnormal conditions (water cut, power cut, instrument failure, environmental change, etc.). ) may affect the inspection results; (3) Auditors at all levels raise objections to the test results, and the director can't clearly explain them; (4) The technical documents on which the test is based are incorrect, resulting in inaccurate test data; (5) important inspection tasks, when the quality director or technical director thinks it is necessary. (6) The inspected unit raises objections to the inspection results and re-checks according to the requirements of the system.