Pretreatment work
If a large chandelier is installed, pretreatment should be done on the building structure. Bolts should be embedded in precast slab structure and mixed soil structure. Ceiling should reserve a certain strength of materials for the use of suspenders or operators.
♂? Preparatory work/about to start work
Before the installation of lamps and lanterns, the basic project of home decoration must be finished and cleaned. Need to prepare a ladder. Installation environment of futai lamps.
Height limit
If the story is more than 3 meters high, it can't be installed without a fixed shelf. Users need to prepare fixed scaffolding, and the floor spacing is more than 4 meters. Please consult with the installation service provider if the cost exceeds the storey height. The seller will not accept it.
hard brittle material
For example, the installation position of lamps and lanterns is fragile materials such as marble, ceramic tile, glass and ceramics. Need to explain to the customer service staff. It is convenient for installers to wear corresponding tools.