electric power system
1g 4110/2 engineering geological survey method

1G4 1 1020 Understand the methods and accuracy requirements of construction survey.

1g 411021main construction survey methods

1G4 1 1022 construction survey accuracy requirements

1G4 1 1023 Basic knowledge of topographic map

1G4 12000 Basic knowledge of engineering mechanics and engineering structures

1G4 120 10 to master the internal force calculation of frames, columns and slabs.

Internal force calculation of statically indeterminate beam 120 1 1

Internal force calculation of 1G4 120 12 short column

Internal force calculation of 1G4 120 13 simply supported slab

1G4 12020 Understand the balance equation of force system and the calculation of bar strength.

Equilibrium equation of 1G4 1202 1 force system

1G4 12022 strength calculation of bar

1G4 13000 soil mechanics and foundation

1G4 130 10 master the types and calculation methods of shallow foundation and pile foundation on natural foundation.

1g 413011shallow foundation type on natural foundation

1G4 130 12 Calculation method of shallow foundation on natural foundation

1G4 130 13 pile foundation type

1G4 13020 be familiar with the characteristics of common soft soil foundations and their basic treatment methods.

1G4 1302 1 characteristics of ordinary soft soil foundation

1G4 13022 Basic methods of common soft soil foundation treatment

1G4 13030 Understand the physical properties of soil and its engineering classification.

1G4 1303 1 physical properties of soil

1G4 13032 engineering classification of soil

1G4 14000 main production equipment of power plant and power transmission and transformation

1G4 140 10 to master the basic knowledge of main production equipment of power transmission and transformation.

1g 414011Functions and types of transformers

Functions and types of 1G4 140 12 transformer

1G4 140 13 Functions and types of circuit breakers

1G4 14020 master the basic knowledge of main production equipment (coal burning) in thermal power plants.

1402 1 Function, type and composition of steam turbine body

1G4 14022 Function, type and composition of boiler body

1G4 14023 Functions and types of generators

1G4 14024 Functions and types of exciter

1G4 14030 familiar with the basic knowledge of the main production systems of nuclear island of nuclear power plant.

1G4 1403 1 Function and composition of nuclear steam supply system

1G4 14032 Function and composition of reactor safety protection system

1G4 15000 Common materials for power engineering

1G4 150 10 to master the performance and application scope of ordinary cement.

1g 415011properties of ordinary cement

1G4 150 12 Scope of application of ordinary cement

1G4 15020 master the composition and technical requirements of coagulation X.

1G4 1503 1 composition of concrete

1G4 15022 concrete technical requirements

1G4 15030 master the categories and selection principles of commonly used building steel.

1G4 1503 1 general building steel category

1G4 15032 Selection principle of common building steel

1G4 15040 master the basic knowledge of common materials in power plants.

1G4 1504 1 Classification and main uses of thermal insulation materials

1G4 15042 Classification and main uses of anticorrosive materials

1G4 15043 Classification and main uses of metallic materials

1G4 15050 master the basic knowledge of common materials for substations and transmission lines.

1G4 1505 1 wire and cable classification and main uses

1G4 15052 Classification and main uses of insulators.

1G4 15053 Classification and main uses of hardware fittings

1G4 15060 be familiar with the main uses of special materials for nuclear islands of nuclear power plants.

1G4 1506 1 Main uses of biological shielding concrete for nuclear island

1G4 15062 Main uses of nuclear grade steel for containment steel lining

Main uses of lG4 15063 nuclear-grade valves

1G4 15064 Main uses of anti-radiation paint

1G4 16000 electric power engineering construction technology

1G4 160 10 master the construction method of reinforced concrete and foundation.

1g 416011reinforced concrete construction method

1G4 160 12 foundation construction method

1G4 16020 master the construction method of substation facilities.

1G4 1602 1 main transformer installation method

1G4 16022 installation method of disconnector

1G4 16023 general construction method of power cable

1G4 16030 familiar with the construction method of boiler body and boiler steel frame in thermal power plant.

1G4 1603 1 Basic installation procedures of boiler body

1G4 16032 Installation method of boiler steel frame

1G4 16040 familiar with the installation method of steam turbine.

1G4 1604 1 turbine cylinder combination method

1G4 16042 installation method of main steam pipeline

1G4 16050 Familiar with the construction method of transmission lines.

1605 1 transmission line retest method

1G4 16052 Installation method of transmission line tower

1G4 16053 tension setting-out construction method

1G4 16054 Connection method between conductor and grounding wire

1G4 16060 familiar with the construction method of high-rise structures in thermal power plants.

1G4 1606 1 chimney construction method

1G4 16062 construction method of cooling water tower

1G4 16070 be familiar with the main contents of civil construction of nuclear island of nuclear power plant.

1G4 1607 1 Pre-stressed construction procedures and methods for containment of reactor building

1G4 16072 construction procedure and method of nuclear-grade armor-piercing projectile on nuclear island

1G4 16073 construction procedure and method of biological shielding concrete for nuclear island.

1G4 16080 familiar with the installation of main production equipment of nuclear island of nuclear power plant.

1G4 1608 1 reactor body installation procedures and methods

1G4 16082 main circulating pump installation procedures and methods

1G4 16083 steam generator installation procedures and methods

1G4 16084 regulator installation procedures and methods

1G4 16085 main loop pipeline installation procedures and methods

1G4 17000 electrical equipment and distribution equipment for power plants and substations

1G4 170 10 to master the basic knowledge of electrical equipment and main wiring in power plants and substations.

1g 417011electrical equipment classification

LG4 170 12 Basic requirements for electrical main wiring.

1G4 170 13 basic wiring form of electrical main wiring.

1G4 17020 master the classification of power distribution equipment and the basic requirements for its installation.

1G4 1702 1 distribution equipment classification

1G4 17022 basic requirements for installation of power distribution equipment (fully enclosed combined electrical appliance GIS)

1G420000 power engineering project management and practice

1G42 1000 project management expert

1G42 10 10 to master the construction procedures of power engineering.

1g421011power engineering construction procedures

1G42 1020 master the requirements of power engineering planning and design.

1G42 102 1 Basic requirements for site selection of thermal power plants

1G42 1022 basic requirements for general layout of thermal power plants

1G42 1023 basic requirements for substation location.

1G42 1024 basic requirements for general layout of substation

1G42 1025 layout principle of main building of thermal power plant

Selection principle of 1G42 1026 transmission line

1G42 1030 master the types and basic processes of power production.

1G42 103 1 power production type

1G42 1032 thermal power generation production process

1G42 1033 hydropower production process

1G42 1034 nuclear power generation production process

1G42 1035 wind power generation production process

1G42 1036 gas combined cycle power generation production process

1G42 1037 power transmission and transformation production process

1G42 1040 master the contents and requirements of power generation project construction organization design.

1G42 104 1 main contents of field investigation

1G42 1042 site construction organization setup and responsibilities

1G42 1043 field management personnel configuration

1G42 1044 Basic contents of construction deployment

1G42 1045 basic contents of the construction scheme

1G42 1046 compilation requirements of comprehensive construction progress plan

1G42 1047 general layout requirements for construction

1G422048 basic requirements of construction site plan

1G42 1050 master the compilation method and requirements of the construction organization design of nuclear island in nuclear power plant.

1G42 105 1 general layout principle of nuclear island engineering construction

1G42 1052 network planning requirements for nuclear island project progress

1G42 1053 main equipment for nuclear island project construction

1G42 1054 human resource requirements for nuclear island project construction

1G42 1055 technical measures for special construction of nuclear island project

1G42 1060 master the relevant knowledge of power engineering construction schedule planning.

1G42 106 1 power generation project construction progress classification

1G42 1062 power generation project construction progress content

1G42 1063 Principles to be followed in compiling comprehensive progress of power generation project construction.

1G42 1064 key nodes of comprehensive progress of electric power engineering construction

1G42 1070 master the basic contents and methods of power engineering construction quality control.

1G42 107 1 Main contents of quality control in power engineering construction stage

1G42 1072 quality control of engineering materials (equipment)

1G42 1073 quality inspection method in power engineering construction stage

1G42 1074 project acceptance type

1G42 1075 branch project quality acceptance

1G42l076 unit project completion acceptance conditions

1G42 1077 project completion acceptance procedures

1G42 1080 master the key points of quality assurance system (quality management system) for nuclear power plant construction.

1G42 108 1 General requirements for construction quality assurance system of nuclear power plants.

1G42 1082 main contents of quality assurance program for nuclear power plant construction.

1G42 1083 requirements for preparation of quality plan for nuclear power plant construction.

1G42 1084 treatment of unqualified products in nuclear power plant construction quality

1G42 1085 requirements for quality assurance audit of nuclear power plant construction.

1G42 1090 master the classification and handling procedures of power engineering quality accidents.

1G42 109 1 power engineering quality accident classification

1G42 1092 power engineering quality accident handling program

1G42 1093 causes and characteristics of power engineering quality accidents

1G42 1 100 master the basic contents and compulsory methods of power safety control.

1g 4211kloc-0/Basic contents of safety management

1G42 1 102 Organize safety accident investigation.

1G42 1 103 safety accident investigation procedure

1G42 1 104 basic contents of safety accident report

1G42 1 105 information required for safety accident investigation.

1g 42110 to master the relevant regulations on the construction safety of overhead power lines.

1g 4211/provisions of foundation engineering

1g 421112 tower engineering regulations

1g 42113 tension setting-out regulations

1G42 1 120 to master the relevant regulations on construction safety of thermal power plants.

1g421121environmental protection regulations for power plants

1G42 1 122 aerial work regulations

1G42 1 123 chimney engineering regulations

1G42 1 124 cooling tower engineering regulations

1G42 1 130 be familiar with the special requirements of safety management in nuclear power plant construction.

1g 421131Conditions for issuing safety licenses for nuclear power plant construction

1G42 1 132 nuclear safety supervision requirements for nuclear power plant construction

1G42 1 140 familiar with the basic knowledge of field management, construction production factor management and organization and coordination of electric power engineering.

1g 421141Basic contents and requirements of site management of construction projects.

1G42 1 142 basic contents and requirements of production factor management.

1G42 1 143 Basic contents and requirements of organization and coordination.

1G42 1 150 understand the main work contents in the design stage of power engineering and the basic requirements for design scheme review.

1g 421151Main work contents in power engineering design stage

1G42 1 152 basic requirements for design scheme review.

1G422000 test the ability of candidates to solve practical problems.

1G4220 10 to control the construction progress.

1G4220 1 1 compilation methods and requirements for construction organization design of electric power engineering.

1G4220 12 construction schedule planning method of engineering project

1G4220 13 construction progress control method of engineering project

1G4220 14 network planning time limit for a project optimization adjustment method.

1G422020 master the construction quality control.

1G42202 1 Main contents of quality control in construction stage

1G422022 basis and method of quality control

1G422023 setting of quality control points

1G422024 contents and methods of power engineering quality control

1G422025 analyze the engineering construction quality by statistical analysis method.

1G422026 requirements and procedures for project completion acceptance

1G422027 engineering quality accident handling procedures

1G422028 establishment of quality management system for electric power engineering construction

1G422030 master the construction safety management.

1G42203 1 organization and procedure of safety accident investigation

1G422032 basic contents of information and investigation report required for safety accident investigation.

1G422033 preventive measures for common construction safety accidents

1G422034 relevant provisions on safety work in power plant construction (construction)

1G422035 relevant provisions on safety work in substation construction (construction)

1G422036 relevant provisions on safety work of overhead power line construction (construction)

1G422037 relevant provisions on power supply safety at construction site of construction project

1G422040 master the construction cost control.

1G42204 1 preparation of project cost plan

1G422042 project cost control

1G422043 compilation method of project design budget and construction drawing budget

1G422044 claim method

1G422045 determination of claim cost

1G422046 payment and settlement of materials (equipment)

1G422047 project payment settlement

1G422050 master contract management

1G42205 1 project bidding procedure

1G422052 bid evaluation and calibration method for engineering projects

1G422053 calculation method of tender offer

1G422054 handling of engineering changes and contract disputes

1G422055 project contract breach responsibility

1G430000 electric power engineering regulations and related knowledge

1G43 1000 relevant regulations on electric power engineering construction

1G43 10 10 familiar with the basic principles of electric power construction in People's Republic of China (PRC) * * * and call back law.

1g 43101basic principles of power construction

1G43 1020 understand other customs regulations on power engineering construction.

1G43 102 1 the provisions on electric power engineering construction in the Law of People's Republic of China (PRC) on Work Safety.

1G43 1022 "People's Republic of China (PRC) fire protection law" is related to electric power engineering construction.

1G43 1023 "People's Republic of China (PRC) * * * and National Metrology Law" related to power engineering construction.

1G43 1030 understand the following quality and safety technical regulations.

1G43 103 1 power industry boiler supervision rules

1G43 1032 steam boiler safety technical supervision regulations

1G43 1033 safety technical supervision regulations for pressure vessels

1G43 1034 safety supervision regulations for hoisting machinery

1G43 1035 special equipment safety supervision regulations

1G432000 code for acceptance of construction quality of electric power engineering

1G4320 10 to master the relevant provisions and requirements of the start-up and completion acceptance procedures for1kloc-0/0kv and above power transmission and transformation projects.

1G4320 1 1 The organization shall start the acceptance work as appropriate.

1G4320 12 began the duties of the acceptance committee.

1G4320 13 project live start requirements.

1G4320 14 relevant provisions on project handover.

1G432020 master the relevant contents of technical specification for construction and acceptance of electric power construction (steam turbine unit).

1G43202 1 main contents of installation and acceptance of steam turbine body

1G432022 requirements of steam turbine generator set before adjustment, start-up and trial operation.

1G432023 work to be done during start-up and trial operation of steam turbine generator set.

1G432024 technical documents to be submitted when starting, debugging and acceptance of a complete set of steam turbine generator sets.

1G432030 master the relevant contents of technical specification for construction and acceptance of electric power construction (boiler unit).

1G43203 1 requirements of building engineering before boiler installation.

1G432032 installation materials (installation records and visas) to be provided at the time of project acceptance after installation of boiler frame (including related metal structures).

1G432033 requirements for water pressure test of boiler heating surface system after installation.

1G432034 installation information (installation record and visa) to be provided at the time of project acceptance after the installation of boiler heating surface is completed.

1G432040 familiar with the relevant contents of the unified standard for construction quality acceptance of building projects.

1G43204 1 quality acceptance standard

1G432042 quality acceptance organization

1G432043 quality acceptance procedure

1G433000 general provisions of safety work procedures for electric power construction

1G4330 10 to master the relevant provisions of the Safety Work Regulations for Electric Power Construction (substation part).

1G4330 1 1 transformer installation regulations

1G4330 12 camera (motor) installation regulations

1G4330 13 installation regulations for power boards (control panel and protection panel)

1G433020 master the relevant provisions of "Safety Work Regulations for Electric Power Construction" (part of thermal power plants).

1G43302 1 provisions on welding work

1G433022 generator (motor) installation regulations

1G433023 regulations for pressure vessels

1G433030 understand the relevant contents of "safety code for power supply and use at construction sites of construction projects".

1G43303 1 Basic requirements for site selection of substation (distribution station)

1G433032 building requirements for power distribution room (control room, power distribution room)

1G433033 cable laying requirements

1G434000 nuclear safety regulations and related regulations

1G4340 10 familiar with the relevant provisions of the People's Republic of China (PRC) nuclear safety regulations and guidelines.

1G4340 1 1 administrative measures for training, examination and evidence collection of nondestructive testing personnel for civil nuclear pressure equipment

1G4340 12 management measures for training, assessment and evidence collection of welders and welding operators of civil nuclear pressure-bearing equipment

1G435000 construction standard for civil installation of nuclear island of nuclear power plant

1G4350 10 master the industrial standard of civil construction of nuclear power plant nuclear island.

Main requirements of Code for Construction of Prestressed Concrete Containers for PWR Nuclear Power Plants 1G4350 1 1

1G4350 12 main requirements of code for construction of concrete structures related to nuclear safety of PWR nuclear power plants.

1G435020 familiar with the installation standards of main process equipment of nuclear island of nuclear power plant.

1G43502 1 Technical Requirements for Installation of Reactor Pressure Vessels and Related Equipment in PWR Nuclear Power Plant

1G435022 installation criteria for reactor main system equipment and its supporting components of PWR nuclear power plant

1G435023 technical conditions for installation of reactor coolant main pipeline in PWR nuclear power plant

1G435024 main requirements of welding code for mechanical equipment of nuclear island of PWR nuclear power plant.

1G435025 main requirements of nondestructive testing specification for nuclear island machinery and equipment of nuclear power plant.