Summary of supervision personal work
Five Summaries of Supervision Personal Work

Summary is a comprehensive and systematic summary of a period of study, work or its completion. Through it, we can correctly understand the advantages and disadvantages of previous study and work. Write a summary. How to write a summary to play its role? The following is a summary of my personal supervision work for your reference, hoping to help friends in need.

Summary of supervision personal work 1 20__ year is coming to an end. Looking back on the work of 20__ years, there are fruitful joys, difficulties in tackling key problems together with colleagues, and melancholy when encountering difficulties. Time flies, unconsciously, 20__ years full of hope is coming. The important work this year is summarized as follows:

First, the main work content of an individual for one year

This year, I mainly participated in the first phase of customs clearance project of Yantai Port Bonded Port Area, the general survey of underground pipelines in Yantai City, the restoration project of three jetty yards in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.

Second, perform job responsibilities

In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.

In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and strive to be the best. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.

In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.

Third, work experience, feelings and shortcomings

Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.

Review and prospect of personal work summary of supervision II. In a blink of an eye, 20 years passed quickly, and the new year came to us again. Looking back on the past year, I am both happy and anxious. I am glad that I have completed the transition from a student career to a working age. What is urgent is that I find that I still have a lot of knowledge to learn in my supervision work. In order to sum up experience and improve myself, I will summarize the supervision work this year as follows:

From _ _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In the spirit of being meticulous, actively absorbing good opinions, learning and correcting in time, and carefully collecting and sorting out information, the information of the engineering supervision department is complete and complete, which has won unanimous praise from the leaders. In the on-site pile foundation acceptance work, I was fortunate to get the cordial guidance of General Manager Geng. Under the guidance of General Manager Geng, he revised his own working methods, recorded the acceptance data of each pile foundation completely, and served as a side station for pile foundation concrete pouring. Japanese people left their jobs after completing the handover due to school-related matters such as graduation project.

On, I came to the company as a formal graduate. Under the care of the building manager and Mr. He, I returned to the project post as an intern, continued to be responsible for the collection and arrangement of engineering data, and actively cooperated with General Manager Duan to take charge of on-site work. Under the patient explanation of Duan Gong, I learned many practical problems and solutions of engineering structures. Duan Gong's personal working methods and attitudes are also worth learning. On, Feng Gong was transferred to the construction site to be mainly responsible for the safety and secondary structure of the project site. He followed Feng Gong to the site and learned a lot about the solutions and management measures for the problems existing in the secondary structure of the project.

In this crucial year, I successfully completed the choice and turning point of my life, and I also know that there are still many places to learn and improve in my work. In the future, I will follow the example of outstanding colleagues, overcome my own shortcomings, do all the work assigned by the leaders and live up to the expectations of the leaders and colleagues. I hope I can play an active role in my post in the future, improve myself and repay the company.

Summary of Personal Supervision Work III. Overall Evaluation of Work

_ _ year is a crucial year for the construction of _ _ project, which has many buildings, large area, heavy tasks, few personnel and many things.

Looking back on the work in the past year, with the unified coordination of all parties and the hard work and efforts of all supervisors, our supervision work has been respected by the owner and affirmed by Party A. The project quality has passed the inspection and acceptance conclusion of the quality supervision station under the control of the supervisors, and the project quality meets the design requirements and reaches the qualified standard. The overall work was carried out steadily, and there were no quality accidents and safety accidents during the construction, and no casualties. All the work in the supervision process was successfully completed, and won the title of _ _ "Two Civilizations" site, which won the honor for the company. It saves money and achieves good results.

Second, the project quality

Supervise the construction unit to establish and improve the quality assurance system, carefully check the qualifications and post certificates of the "three inspections" personnel, implement the "three inspections" system for on-site construction, and sign the inspection lot of on-site supervision procedures. The supervisor should divide the work according to the post requirements, highlight the key points, coordinate the work, conscientiously implement the contract requirements and quality standards, handle and solve problems in time when found, ensure the orderly management on site, and strictly rectify the problems that arise. For the problems found in Party A's inspection, corrective measures must be implemented. Deeply realize that quality is not only the final inspection and test after the completion of the project, but also the key point in the construction process, which makes the construction quality problems disappear in the bud.

Quality is not empty, just like progress, it can be controlled by digitalization and quantification. In quality control, we should not only believe in anyone's verbal guarantee, but also believe in a complete quality system.

Third, the progress of the project

Seriously __X the commencement report and construction progress plan provided by the construction unit, put forward specific opinions on the progress plan according to the equipment situation, personnel situation and Party A's requirements, constantly check the gap between the actual progress and the planned progress, and accordingly urge the construction unit to increase personnel and equipment, adjust the progress at any time, control the nodes and quantities, adhere to the principle of seeking truth from facts, and do not report too much, so as to safeguard the interests of both parties to the contract.

Fourth, investment control.

The overall investment control is normal and orderly, and the design should prevail at all times without making any changes. When changes are needed, the application materials must be approved by the design unit and Party A before implementation. All on-site measurement work must be carried out in the presence of the owner, the construction unit and the supervision unit, and shall not be carried out by itself to ensure the reliability, authenticity and authenticity of the data.

Five, presided over the supervision meeting, drafting supervision monthly report, audit supervision log.

Stick to your post all the time in one year's work, stay on the production line for a long time, keep abreast of the problems existing in the project, hold regular supervision meetings every week, and solve the primary problems existing in the construction for one week and the work arrangement and plan for next week, which has played a very good role. Party A's documents should be summarized, the construction progress should be summarized in time, and the problems that need to be implemented should be solved through coordination. Conduct safety civilization inspection and appraisal at the end of each month, draft supervision monthly report, and use __X supervision log for two days every month to rectify the main problems that do not meet the requirements in the construction records.

In addition to my normal work, I have to go to the construction site for __X purposeful inspections every day. If there is any problem, record it in the "Director Inspection Record". There are measures to deal with the problem, and there will be inspections afterwards. Can carry out criticism and self-criticism, and boldly express their views at the meeting hosted by the owner, which is respected by the participants. Have a high sense of responsibility, ask for instructions and report to the company in time when encountering problems, so that the whole project supervision can be carried out under the guidance of the company.

Six, seeking truth from facts, strict requirements

Seeking truth from facts is the most appropriate way to summarize the supervision work. Supervision work must seek truth from facts in terms of quality, progress and measurement, objectively reflect the dynamics (model) of the project construction process, truly record the project quality, progress and measurement process, strictly require on-site supervision in the work, and establish a good image of _ _ supervision. We should learn from others' strengths, blame others' shortcomings less, cheer them up, cooperate with our work more, and reflect our work ability and work style in our daily work and life. At the same time, as the chief supervision engineer, we should always keep in mind the influence of our image on the supervision company.

Seven. Problems and deficiencies

1, should further strengthen the construction site inspection, grasp every detail in the process of project implementation, and play a proactive role.

2, strict supervisors, rewards and punishments, make the whole supervisor team by going up one flight of stairs.

3. In the future, we should communicate with the supervisor more, help them solve problems, avoid worries and better serve the project.

4, often constantly report to the company, strengthen contact with the company, and constantly get interested help and guidance.

5. Read more newspapers and listen to __X, care about national affairs, keep pace with the times and keep up with _ _ X..

6. Strengthen contact with the company and strive for more help from the company. Raise the supervision work to a higher level.

Summary of Personal Work of Supervision 4 Time flies too fast, and before you know it, half a year full of hope has passed. Over the past six months, the supervision work has gained a lot. Let's talk about my work in the past six months:

I. Personal annual work content

In the past six months, I participated in Tongli Yunshuiyao Project, Coral Hongyayuan Pile Foundation Project, Wang Ping Canal Garden Project, Wang Ping Sewage Treatment Plant's 30,000-ton/day upgrading and renovation project, and Wang Ping Central Kindergarten's fine decoration project.

Second, perform job responsibilities

In this half year's work, I still carry out all kinds of work with the attitude of learning by doing, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my colleagues in time, and accumulate work experience bit by bit.

1, engineering quality

Supervise in strict accordance with the supervision specifications, engineering drawings and supervision rules. When I participated in the pile foundation project of Hongyayuan Mountain Lake, I spent most of my time on the construction site. The project seems simple, but the site area is relatively large, and multiple points are constructed at the same time. I participated in the assignment of supervisors, resident work and related records at the construction site. I know that we must grasp the key points of supervision work in order to reduce the workload and improve efficiency and effectiveness. If problems cannot be solved are found, they will report to the director in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. When participating in the Wang Ping Canal Garden Project, the parts that need to be on standby will be on standby all the time and recorded. Acceptance of concealed works will be carried out in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the quality certificate of the original certificate test report of the materials and equipment entering the site, and witness the sampling of steel bars and concrete test blocks. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take relevant measures to speed up the construction progress on the premise of ensuring quality.

2. Engineering data.

Write a supervision diary every day according to the site conditions, and sort out and file the site records and other materials of the day, and urge the construction unit to report the corresponding engineering materials. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.

Third, work experience, feelings and shortcomings

Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of professional supervision engineers, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this half year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also led to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.

Four. Personal career development opinions and views on the company in the second half of the year.

Engaged in supervision work, knowing more is never enough, so in the second half of the year, we will ask more questions, learn more, do more, and learn various professional knowledge step by step according to the needs of the work. Abide by the company's various management systems at work, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant books, and improve their professional level. I also hope that the company will organize more training for our supervisors, so that we can better adapt to this job and do more things for the company.

Verb (abbreviation for verb) personal feelings

I found that I have changed, not like the old me. Mature? Become sensible? Realize what to do and what not to do. Realize what you need. Wait, I don't know. I don't know what to do. Maybe the work environment or people made me who I am. I'm not used to it. Sometimes I will sit quietly and think about many problems, and sometimes I will think of my classmates and brothers. They are still living a carefree life in college, and I have unconsciously entered the society for more than two years. Although I have experienced more than them, I am still looking forward to college life. I regret my original decision. If I had decided otherwise, I don't think I should be here now.

Summary of personal supervision work. It has been more than a year since I came to the company in a blink of an eye. After a year of transformation, I feel that I have matured a lot. Work and life have been greatly improved.

From the beginning, after company training, he was transferred to j 1 A2 Resident Office of Sanming Jiantai Expressway to take charge of subgrade and bridge site. I came into contact with a large working face, read the drawings and specifications for a month before starting work, and became familiar with some work processes of supervision. At first, I went to the construction site with the special supervisor, and every day I went to various operation surfaces to check the personnel, materials and mechanical equipment. Where there is concrete, there will be nothing to do. Collect, sort out and record some things and data on site in time. Go back to the resident office, write the supervision diary, and make the sampling data and resident records of the day. I feel more fulfilled every day. You will inevitably encounter many problems in your work. If I don't understand anything, I will take the initiative to ask special supervisors and residents to see how to deal with the problem again and again, so that I can grow up gradually. I deeply realized that to do a good job of supervision, you should handle it very well from the perspectives of speaking, treating people and professionalism, so as to convince others of you.

"Industry is good at diligence, and things are good at detail", so be diligent and careful. Engineers are not allowed to be sloppy. Only through our care can we find more subtle problems, and accidents are often composed of small problems. Careful day after day will make us form a good habit, which will bring many benefits to our work. This year, with the guidance and help of leaders and colleagues, I really put my theoretical knowledge into practice. I deeply realized the true meaning that theory guides practice and practice reacts on theory. Through continuous practice, I further consolidated my professional theoretical knowledge and fully verified my vague theoretical knowledge. In this year, I have been strict with myself. Under the patient guidance of leaders and colleagues, I will learn from experience and make myself daily growing.

During this year, my work experience has increased a lot, laying a good foundation for future work. Of course, it is more important to be able to touch every tiny link of the whole project, so that we can systematically link theory with practice and review and consolidate our professional theoretical knowledge system. Work continues, and the road to learning is also extending. We should constantly improve ourselves in our work. I am very lucky. Thanks to the company for providing me with a working platform that is consistent with my major, which can make me apply what I have learned, and at the same time better link the theoretical knowledge related to roads and bridges with the actual construction, and improve my ability to analyze and solve problems.