1, all personnel entering the construction site must wear safety helmets correctly and fasten the lower forehead belt, including the position within 0/0 meters from the main building/kloc-0.
2. Before entering the construction site, you must undergo safety production training, education and assessment. Those who have not received safety production training and education or failed the examination shall not participate in the construction work. Violators are directly dispatched by workers and their subcontractors to bear all legal and economic responsibilities.
3. It is strictly prohibited to cross vertically on the construction site without protective measures. When crossing operations, the construction must be carried out in strict accordance with the Technical Specification for Safety of Working at Height in Building Construction, and "three violations" operations are strictly prohibited.
4. It is forbidden to throw down or up any objects, materials, garbage, etc. When working at high altitude. In particular, it is strictly forbidden to throw or throw construction waste from buildings at will.
5, in the absence of safety protection measures or safety protection facilities are not in place in the high limb operations, must correctly fasten your seat belt. Seat belts should be hung high and used low. (especially when working outside boundaries, walls and shelves)
6. When cleaning, repairing and external wall operations are carried out on an outer frame, or when working around floors, a temporary hard anti-smashing shed must be built above the head to prevent any objects and garbage falling from it from hurting people.
7. When the roof is demolished, a large net (safety net) must be hung at the window. It is forbidden to knock and slam when disassembling the rod. The dismantled steel pipes, wood squares, oil supports, fasteners and other materials must be placed at the edge of the structure1m.
8. During the hoisting operation, the signal commander and hook personnel must operate in strict accordance with the "Ten Don't Hoist" safety operation rules, and "Three Violation" operations are strictly prohibited, especially the hoisting of materials on the unloading platform and the hoisting of large formwork.
9. When multiple units cross-operate, the main construction unit shall be responsible for production safety accidents caused by inadequate protection or employees' violation of regulations, or for rectification due to inadequate protection (the standards for determining the main structural units shall be subject to the handover documents of safety protection and actual construction scope of both parties).
65438+ Violators shall be held responsible for legal and economic compensation at their own risk.