Current location - Education and Training Encyclopedia - Education and training - Five personal work summaries with professional titles
Five personal work summaries with professional titles
To sum up, we can turn scattered and superficial perceptual knowledge into systematic and profound rational knowledge, so as to draw scientific conclusions, so as to carry forward achievements, overcome shortcomings, learn lessons, and make less detours and more achievements in future work. The following is a summary of my personal professional title work, hoping to provide you with reference.

Personal work summary of professional title 1

I graduated from Shanghai Normal University majoring in electronic information engineering in July 2000, and joined the society in July of the same year. I have the honor to come to my present company to engage in the development of new electronic products. Work 1 years, during which I grew from a fresh college graduate to a professional and technical worker. My technical level has undergone a qualitative change, from the original theoretical knowledge based on books to the ability to combine theory with practice to complete product development.

I joined the new product development work as soon as I joined the company. Although I only served as an auxiliary job to help my colleagues complete the project, I played my part in it, learning new knowledge and accumulating experience from work for the first time.

At the beginning of 20__, I undertook the development task of a new photoelectric sensor product project. I am very much looking forward to this task, but I am also a little uneasy. After all, this is the first time I have been engaged in new product development independently. With the help of my colleagues, I read a lot of relevant materials, did a lot of experiments, and constantly improved the design of software and hardware, and finally completed the design work and passed the test, which can be used by users in practice.

In June, 20 _ _ _, I received a new product project design and development task, which was to manufacture and install speed display screens for imported large printing machinery. The time required for this project is rather tight. Soon, the software and hardware design, laboratory debugging and product manufacturing were basically completed. However, due to the harsh field environment, problems occurred in the installation process. By consulting the technical consultant of the unit, the installation plan was changed in time, and the product was successfully installed. Now the product works normally.

In short, as a professional technical worker, I constantly consolidate the theoretical knowledge I have learned before in my work, and at the same time, I have to learn new knowledge and technologies and apply them to practical work. For the future, I will still engage in professional and technical work and do it better and better. Because I found that at present, the market of advanced electronic products is occupied by European, American, Japanese and Korean powers, and there are only a handful of advanced products in China. To change all this, only by improving our advanced technology level can our products enter the international market. As a professional technical worker, I certainly have this responsibility and should do my part to build a harmonious socialist society.

Title II Personal Work Summary

I graduated from Foshan Vocational and Technical College in June 2000 and started to work in June of the same year. I have been engaged in electrical engineering and technology for three years. In June, 20__, I reported to Langmei Carpet Products Co., Ltd. and was assigned to the electrician team to start the workshop internship. Engaged in electrical installation practice in the factory. Participate in the first-phase equipment installation project and the electrical installation of power distribution cabinets in various workshops of the company. During the three months of internship, I studied hard, explored constantly, asked for advice modestly, and combined with the basic theoretical knowledge I learned in college, my business ability improved rapidly. After the first stage of machine installation and debugging, I began to learn and master the operation and electrical wiring of each machine in order to be better qualified for this job. In the work, be serious and responsible, take the initiative, adhere to the party's basic principles and policies, and abide by the law. At the same time, I earnestly studied electrical professional knowledge, became familiar with national design, construction and acceptance standards, and obtained the qualification of electrical technician in June, 20.

Be strict with yourself politically, actively participate in various political activities, consciously study political theory, pay special attention to the study of important ideas, and strive to improve their political theory literacy. Have a strong sense of the overall situation and organizational concept, put the cause first, regardless of personal gains and losses, put the interests of the broad masses of the people first, and strive to practice the fundamental purpose of serving the people wholeheartedly. Be fair, just, just and upright in the work, have strong professionalism and dedication, work hard, be proactive, have a down-to-earth style, do not shirk, and stress efficiency. Pay attention to investigation and study, be diligent in thinking, and have clear working ideas.

At work, I am even more conscientious and unwilling to lag behind. After taking part in the work and holding a technical post, I found that the theoretical knowledge I learned at school was too superficial and the work was not as easy as I thought. When installing equipment in the workshop, I humbly ask the equipment installation master, and ask if I don't understand. For some equipment, electrical drawings seem to be very busy. Only after I went to work did I know that I had little knowledge and had a lot to learn. Therefore, I humbly ask the master, ask more questions, look at more pictures, and work based on my post, afraid of not learning and not asking. After the equipment installation is completed, I will go back to my company as an equipment installation master. I will study hard, record any difficulties, and go back to consult the information after work, so that I can gradually have a basic understanding of the company's equipment, and also know a lot of electrical components that I have never seen before, and understand its role in the whole equipment.

Since I joined the work, I have worked hard to learn the theoretical knowledge and professional skills of this major, attached importance to constantly improving my technical ability of electrical maintenance, and strived to improve my professional technical ability and level through different forms of study in my spare time according to the actual needs of the company. Because I am an imported equipment, I have to translate the relevant information of the machine into Chinese, formulate the operation guide related to the equipment and train the relevant personnel. Design some simple electrical equipment for the company's holiday activities. Through large and small work, let your technical level slowly improve and constantly improve your work.

By summing up three years' work, I also found my own shortcomings. First of all, I still lack professional knowledge. Secondly, I lack communication skills and relevant experience in dealing with some special situations. Therefore, in the future work, we need to read more books, seriously study rules and regulations and related documents, master professional knowledge, arm ourselves, improve our working ability, strengthen our sense of responsibility, communicate more, and do our personal work in time.

In short, in my future work, I will constantly sum up and reflect, meet new challenges with a hundred times enthusiasm, make progress and maturity in my study, constantly spur myself, enrich my energy, improve my quality and technical level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company.

Title 3 Personal Work Summary

I graduated from _ _ _ _ _ _ _ _ _ in June, 20, and joined Hebei Zhengshi Urban Construction and Development Co., Ltd. in July of the same year as an archivist-level chemist.

The information and laboratory work of the construction unit is my first job after I left the university campus, which is a starting point of my career and I cherish it very much. In the past three years, I have experienced the Xishan Sewage Treatment Plant project, the northern water source upgrading project and the Xuanhua General Bridge project. Since joining the work, I have been carefully nurtured and guided by the leaders of the project department, and the enthusiastic help and guidance of my colleagues around me. At the same time, through my continuous efforts, I learned a lot about engineering construction. I started to learn the project budget by myself in April, 20 _ _ _ _ _ _ _.

During my work, I actively obey the leadership's work arrangement and finish my daily work seriously. Every time I go to a project department, I am familiar with the local budget quota and calculation rules, and compare them with those in other places before to find out the differences, so as to remind myself of what to pay attention to in the future work, and strive to make the most reasonable cost for the projects under construction on the basis of careful calculation of engineering quantities. Of course, this should also be the purpose of every cost personnel. In engineering, the budgeter does not simply calculate the engineering quantity and take the quota. Drawing to entity is the crystallization of many people's sweat, which requires many people to make efforts. Construction according to drawings is the principle of the construction unit. Therefore, in the process of construction, the budgeter needs to observe the construction site frequently, compare the drawings, find the differences between the construction and the drawings in time, handle them, handle the engineering changes and visas in time, and recalculate the engineering quantity.

Architecture is a major where art and technology coexist, and it is also an industry that affects the national economy, people's livelihood and life. Although there is no direct responsibility between the budget and the quality and safety of the project, quality and safety are related to every staff member on the project. In building construction, we must always put safety first, and conscientiously implement the national principles and policies on standardization, quality management system, product quality supervision and inspection and research and development in our work.

Besides doing his daily work well, he also helped the leaders to complete other work and accumulated rich work experience, which laid a good foundation for the smooth development of future work. As a * * * party member, I participated in the party building work of the company and made due contributions to the company's smooth realization of the year-end goal of party building work and the half-year work goal. First, assist the leaders in organizing various learning activities of the project department, thoroughly implement the party's advanced ideas and spirit, strengthen the team building in party member and improve the quality of employees; The second is to promote the construction of party style and clean government in the project department with all kinds of party building activities promoted by the superior companies as the carrier; Third, assist the Party branch of the project department to make preparations for joining the Party activists, developing party member and collecting party dues; Fourth, assist the leaders in organizing all kinds of assessment and appraisal work, and timely complete the promotion tasks or indicators issued by superior companies. As a member of the trade union, I participated in the trade union work of the project department and made due contributions to the bridge and link function of the trade union organization. First, assist leaders to organize employees to study politics, participate in business training, and improve their political literacy and business ability; Second, assist leaders to strengthen the construction of trade union system, promote democratic participation, democratic supervision and democratic management, and safeguard the rights and interests of workers; Third, care about employees' lives, participate in send warm activities, and contribute to the promotion of all work.

As we all know, only by constantly strengthening study and improving one's working ability can one occupy a place in the talent competition. So I started from work, in addition to doing my job well, I also studied the knowledge of project management after work, hoping to become an excellent comprehensive management talent. I used the computer and network to teach myself the relevant knowledge of the second-level constructor, and applied for the qualification examination of the second-level constructor organized by the whole country, and passed the examination smoothly. Due to the limited time, I don't know much, but I will continue to work hard to make myself better.

It should be noted that now is the era of knowledge economy, and information technology plays an increasingly important role in engineering projects. With the development and application of information technology, we should attach importance to the transplantation and utilization of high-tech, broaden the channels of dissemination of intellectual resources, comprehensively improve the traditional compilation methods, make information play a central role in various elements of productivity, and gradually realize the automation of building information, the mechanization of building work, and the modularization and systematization of building technology. As a budgeter, he should consciously integrate modern scientific and technological knowledge. Self-improvement of their own knowledge system can produce greater economic benefits, enhance the competitiveness of construction enterprises and enable enterprises to obtain a better living environment in the increasingly fierce competition.

There is a mountain peak in everyone's heart, carved with ideals, beliefs, pursuits and ambitions; There is a forest in everyone's heart, bearing the harvest, fragrance, frustration and tempering. I hope to use my brilliant youth to ignite the passion of everyone around me and inspire my colleagues to contribute, forge ahead, make contributions and make a career for our cause.

Title 4 Personal Work Summary

With the roar of construction machinery, unconsciously, the working time of one year is fleeting. Perhaps a year is just a drop in the ocean for the whole history; For a person's life, it is only a few tenths, and should not be too nostalgic.

However, this year can be summed up by the word "extraordinary" for a student who has just stepped into society and set foot on a job. In the past year, I deeply realized the hardships and happiness of being a builder, and also realized the pain and pressure of being an excellent builder. I poured my youth and passion into the construction work and spilled my sweat on every humble work site. During this period of work, I not only deepened my understanding of the original knowledge, but also got a better understanding of the knowledge that I didn't touch or didn't touch deeply in previous books. Since my work, I have made great progress and gained great gains in my thoughts, studies and work through my own continuous efforts under the careful training and teaching of the unit leaders. The work is summarized as follows:

Ideologically, we should seriously study Marxism-Leninism and important thoughts. Insist on seeking truth from facts, constantly improve their political and ideological awareness and level, and constantly explore and pursue.

In learning, I have been strict with myself since I joined the work, taking my work seriously and positioning myself well. Although the working conditions are very difficult, it is also an opportunity for us young people to exercise ourselves and challenge ourselves. Theory comes from the fact that life is higher than life and should be reduced to life. In this environment, there are many good things worth discovering and many places worth studying. I always keep in mind that I should keep learning in my work and combine theory with practical work well. Constantly change yourself at work, put forward different requirements for yourself at the right time, constantly sum up experience at work, improve work ability, learn at work, and grow up gradually at work.

At work, the first task after arriving at the construction site is to be arranged at the construction site and work with the staff at the construction site. During this period, I have been working diligently, cooperating with the field staff and obeying the arrangement. Good help and complete the task at the same time, I also have great gains. Today, with the rapid development of science and technology, the competition is becoming more and more fierce. In order to enter a new working state in the shortest time, so as to finish my work better in the future, I personally realize that only by constantly learning new knowledge, mastering new skills and constantly improving my professional level and working skills can I meet the needs of my work and adapt to the development of society.

In this year's work, as the foreman of civil engineering, I was specifically responsible for partial projects: masonry engineering, roof waterproofing, internal and external wall insulation, external wall tiling, ceiling plastering, terrazzo floor. These are mainly the field work of secondary structure and later decoration. In the process of work, I am more and more familiar with the use of instruments and equipment in the construction site such as level and theodolite. When in doubt at work, I will first study and consult theoretical specifications and atlas according to the actual construction situation, and then continue to learn from experienced colleagues the technologies or skills that I have not really mastered and apply them. Collect and sort out some information in the process of work and turn it into information for later use; In my spare time, I read some professional books and websites to learn and master some advanced professional and technical knowledge. I also read some management books or other websites to learn all kinds of knowledge and improve my comprehensive ability.

In my future work, I will improve my quality through continuous study and practice, so that my progress can be synchronized with the development of society to meet the needs of my work. I know that as an engineer, I should have a correct attitude and a rigorous scientific style in my work. Although my work can't be said to be scientific research, it can't be sloppy at all. "A thousand miles away" is only used in my works. As a builder, you should not only be able to handle the website well, but more importantly, you should be able to solve the problems that appear on the website. In order to improve work efficiency, we must solve the problem in advance. This requires me to find the problem well and solve it in time.

At present, my construction site is undergoing intense finishing work. I actively cooperated with my colleagues to successfully complete the task with good quality and quantity. In this period of work, I deeply feel that the responsibility is more important than Mount Tai. It's really my pleasure to be involved. During this period, I paid a lot, but I also gained a lot, and I enjoyed it.

After nearly a year's working time, I have become more and more familiar with the on-site operation, equipment and colleagues in the second project department. In addition, I have an overall understanding of all aspects of the project construction. At the same time, we are gradually improving our understanding and learning of equipment and theory. During this period of work, my personal working ability has been improved to a certain extent, which is inseparable from the concern of leaders and the help of colleagues around me. In the future work, I will continue to work hard, make persistent efforts, be strict with myself, be realistic and innovative, constantly temper myself and do my best to do a good job.

Title 5 Personal Work Summary

My name is _ _, and I am a Chinese teacher in Hebei _ _ Middle School. /kloc graduated from _ _ school in 0/9, and transferred to _ _ middle school in 0/9. Since my work, I have worked hard to improve my ideological and political level and teaching professional ability. I have been strict with myself in all aspects. I study hard, work hard and work hard. I have done well in four aspects: morality, ability, diligence and achievement. Being a teacher, teaching and educating people, fulfilling the task of education and teaching well, fulfilling the obligation as a teacher, has been recognized and praised by superiors, leaders, peers and students. In _ _ _ _ _, I was rated as a first-class teacher in middle school. Over the years, I have worked hard, not only to set an example for young teachers, but also to learn from senior teachers. My teaching level and working ability have been greatly improved, and I have met the requirements of senior teachers in four aspects: integrity and diligence. My work performance can be summarized as follows:

I. Love my job, study hard, and constantly improve my political and ideological quality.

In order to meet the requirements of teaching work in the new period, I have carefully studied the speech on teaching work and tried to improve my ideological and moral level. Adhere to the Four Cardinal Principles, earnestly study the Party's basic theories and important works, constantly improve and enrich themselves, accept the criticism of comrades with an open mind, and pay attention to correcting their shortcomings in practice; Seriously study the party's line, principles and policies, love the party's education, love their jobs and strengthen their self-cultivation. I study political theory hard, take an active part in a series of activities organized by the school, and apply the theoretical knowledge I have learned to practical work.

Pay attention to actively helping other comrades do what they can, get exercise in the process, increase their knowledge and improve their working ability.

Years of political study, education and teaching have made me realize more and more that being a people's teacher, paying attention to the rise and fall of the country, being loyal to the party's education, teaching and educating people, and doing my job well are patriotic performances and fulfilling the obligations of a citizen.

Second, study the law of teaching, explore new ways of education and teaching, and strive to achieve "learning high as a teacher."

The motto of my education work is "down-to-earth, positive and enterprising". In terms of educational philosophy, I abide by the principle of "being an excellent scholar and being respected". Therefore, in teaching, I should prepare lessons carefully, attend classes, lay a good foundation and do a good job of "six conscientiousness". In teaching, I don't follow the book, but create a relaxed, lively and enterprising learning atmosphere in various ways, and teach in a way that students are willing to accept.

In teaching, preparing lessons carefully is the first priority. I prepare not only students, but also textbooks and teaching methods. According to the content of the textbook and the students' reality, I design the course types, draw up the teaching methods, record the procedures and time arrangement of the teaching process in detail, and carefully write the teaching plan. Every class should be "prepared", and every class should be fully prepared. After class, we should summarize this lesson in time, write a good teaching postscript, carefully collect the knowledge points of each lesson book and summarize the whole set. Enhance class skills, improve teaching quality, explain clearly, methodically, accurately, emotionally and vividly, with clear clues, clear levels and conciseness.

In class, I pay special attention to arouse students' enthusiasm, strengthen the communication between teachers and students, fully reflect the main role of students, and fully consider the learning needs and learning ability of students at all levels, so that students at all levels can be improved.

Personal work summary of professional titles 5 related articles:

★ Latest 10 Summary of Personal Senior Professional Title Application.

★ Reference model essay for personal summary report of professional title

★ Summary of Personal Work in Professional Title Evaluation

★ Selected 10 Personal summary of teacher title evaluation.

★ Five annual work summary models for junior titles.

★ Model essay on personal work summary of deputy senior professional title evaluation

★ Summary report on personal work of teacher title evaluation